Energy Efficiency Management
Essam AbdElaal
Connected Energy Network service Unit
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 2
Agenda
• Energy Market overview
• EOS Overview
• Sample Reports.
• Q&A?
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 3
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 4
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 5
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 6
Source: IDC
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 7
how much power is used or where it’s being used
?
??
?
?
??
?
??
?
??
?
?
????
???? ?
???
????
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 8
Environment
Regulatory Requirements
Data Center
Corporate Citizenship
Escalating Energy Prices
CompetitivePressures
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 9
• Turkey
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 10
Lighting
UPS
Data
CenterCRAC
AHU
Humidifier
Chiller Cooling
Tower
Pumps UPS
LightingCooling
Plant
8%
Medium Voltage
Switch Gear
Medium Voltage
Switch GearStand-By
Generator
1%
Facility
Sub-Station
Unit Sub-Station
XFMR - PDU
3%
Unit Sub-Station
XFMR - PDU
3%
Total Facility Power
According to the Uptime Institute, the typical data center has an average PUE of 2.5.
The EPA estimates that the typical enterprise data center had a PUE of 2.0 or higher.
Assuming a PUE of 2.5 means for every 1W of ICT load 2.5W is consumed by the building load.
Uptime estimates most facilities could achieve 1.6 PUE using the most efficient equipment and best practices.
Energy usage by ICT asset is typically not networked or managed today
Power Plant
Transformers
Industrial Facility
Commercial Facility
Residential
Transmission Towers
Power Sub-Station
Compute IT
Equipment
Network
Storage
1%1%
25%
2%
3%
5%
35%
2%
5%
1%45%
Smart Load Implications: Data Center Example
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 11
•No single Energy Mgmt across domains
•Consuming energy 7x24x365
•Difficult to measure and manage
•Users don’t turn off equipment
•~30% servers are not used (IDC 2012)
•~8-12% average server utilization
•Difficult to identify top energy consumers
•Power-constrained data centersDistributed Office Network
Data Center
Facilities
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 12
Agenda
• Energy Market Overview
• EOS Overview
• Sample Reports.
• Q&A?
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 13
Agenda
• Energy Management Drivers & Trends
• What are we offering ?
• EOS limited promotion
• Call to action
• Q&A
Cisco Confidential 14© 2011 Cisco and/or its affiliates. All rights reserved.
Engagement Schedule
Service Delivery Schedule
Energy Discovery Workshop• Remote Access
Required• Implement Monitoring• 1-4 Week Sampling
Business Case• Data Analyzed &• Presentation of
Findings
Operations Analysis• Power Billing• Capacity Management• Data Centers, Labs,
Offices• Sustainability Goals• Demand Response• Building Management
Architectural Analysis• Network• Compute• Storage• Appliances• CRAC• Building Mngmt System
Domain Creation• Network• Compute• Storage• Reporting• Control Policy
Preferences
Efficiency Analysis• Virtualization• Shutdown• Spindown• Physical Redesigns• Best Practices
Program Development• Scoping• Organizational Analysis• Incentives & Funding• Sponsorship
Assessment Delivery• Pilot Results• Program Dashboard • Domain
Recommendations• Policy
Recommendations• 12 Months Licensing
Pilot ImplementedProgram PlanHigh Level
DesignInfrastructure Assessment
Architecture Assessment
Operations Assessment
Savings ProjectionDiscovery
Deploy Discovery Tools Interview & Analyze Analyze & Design Develop & Transfer
Site Visit
Phase 1 Phase 2 Phase 3 Phase 4
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 15
• Discovery & Measurement• Analysis & Simulation• Policy & Control• Reporting & Decision Support
Ent. Energy manage
r
SNMPWeb
ServicesIntel DCMCisco
EnergyWise
PoE Non-PoE
Data Center FacilitiesDistributed Office
IPMIWMIvProSSH
BackNETLonWorksModBUS
Enterprise Energy
Reporting
EnergyManager
Devices &Systems
Mobile
GPS
Employee Portal
- Fieldserver- Cisco Mediator- Echelon
Energy Manager
Non-IP
Data Center FacilitiesDistributed Office
• Cloud and on premise
• Need on premise access (i.e. through UCS or ISR)
Architectural Overview
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 16
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 17
Different Dashboards for Different Stakeholders
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 18
• Laptop/Desktop/Phone~50W, 200W, 8W
• Round the YearKwh? => Wh*365*24/1000 => 438(PC), 1752(Server), 70(Phone)Cost? ($, 0,1$/kwh)
43,8/175,2/7
Multiply by number of Devices, substract non-running
Cooling? => Wx2Carbon? (~0,15kg/kwh)
• Typical NumbersMin. 30% of DO-devices left running, …
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 19
*Estimates 65% desktops, 35% laptops, 1 AP for every 20 employees, everyone has an IP PhoneResults vary based on what, if any, energy management solution is previously in place; Assumes $0.12 per kWh (kilowatt-hour). Based on powering down 10 hours/night, 24 hours on weekends. Laptops are 10-20% based on low percentage left in office at night and weekends.
Results in up to $50K (~50%) in Savings Annually (per 1000 employees)
$95
$35
$30
$12
$7
50-60%
10–20%
50-60%
50-60%
50-60%
$50-60
$6-8
$15-18
$6-7
$4-5
Desktop
Laptop
Monitors
PoE AP
IP Phones
Annual Energy Cost by Device
Annual Savings Annual Savings per Device
Per 1000 Employees Working 9 Hours a Day, 5 Days a Week…
Operational Savings Distributed Campus Devices
$33,962
$1,837
$10,725
$330
$3,850
Total Savings
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 21
Agenda
• Energy Market Overview
• EOS Overview
• Sample Reports.
• Q&A?
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 22
Asset Discovery
Phase 1Discover & Benchmark
Phase 2Domains & Reporting
Phase 3Operate & Transfer
Profile Analysis
Benchmarking
Domain Creation
Reporting
Operations
EMaaS Program
Service Transfer
Optimization
M&E Alignment
EOSProject Methodology
0-4 MonthsActivities & Deliverables
4-8 MonthsActivities & Deliverables
8-12 MonthsActivities & Deliverables
© 2012 Cisco and/or its affiliates. All rights reserved.
Project Deliverables
ComputeACTIVE + DYNAMIC Discovery
Desktops Physical Servers
Virtual Servers
Network CollectorSNMP, vPro, EnergyWise
NetworkACTIVE + DYNAMIC Discovery
Switch Route Switch-Route-Compute
Network CollectorEnergyWise, Statistical Derivation
StorageDYNAMIC + STATIC Discovery
Tape Disk Network Attached
Network CollectorSmart PDU, Branch Circuit Monitoring
ActivitiesNetwork Collector Deployment
1. Hostinga. Identify dedicated or virtual machineb. Deploy Energy Management Application
2. Discoverya. Determine aggregation strategyb. Launch network discovery tool
3. Aggregationa. Level 1 domain creationb. Form associations for Parent > Child >
Entity
4. Accessa. Establish and/or expand credentialsb. Establish Cisco Service remote access
Rob AldrichTeam & Lead ArchitectEnergy Expert
Emmanuel TychonEnergy ArchitectDeployment Lead
Mark DavidsonSystems EngineerApplication Expert
Site Visit
Service Team
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 23
Asset Discovery
Phase 1Discover & Benchmark
Phase 2Domains & Reporting
Phase 3Operate & Transfer
Profile Analysis
Benchmarking
Domain Creation
Reporting
Operations
EMaaS Program
Service Transfer
Optimization
M&E Alignment
EOSProject Methodology
0-4 MonthsActivities & Deliverables
4-8 MonthsActivities & Deliverables
8-12 MonthsActivities & Deliverables
© 2012 Cisco and/or its affiliates. All rights reserved.
Project Deliverables
IT Load and Building LoadElectrical Utilization
Network CollectorSNMP, vPro, EnergyWise
Power Usage EffectivenessReport 1.1
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 24
Asset Discovery
Phase 1Discover & Benchmark
Phase 2Domains & Reporting
Phase 3Operate & Transfer
Profile Analysis
Benchmarking
Domain Creation
Reporting
Operations
EMaaS Program
Service Transfer
Optimization
M&E Alignment
EOSProject Methodology
0-4 MonthsActivities & Deliverables
4-8 MonthsActivities & Deliverables
8-12 MonthsActivities & Deliverables
© 2012 Cisco and/or its affiliates. All rights reserved.
Project Deliverables
IT Load Power AllocationsElectrical Utilization by Hardware Platform
Network CollectorSNMP, vPro, EnergyWise
IT Asset Energy AllocationReport 1.2
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 25
Asset Discovery
Phase 1Discover & Benchmark
Phase 2Domains & Reporting
Phase 3Operate & Transfer
Profile Analysis
Benchmarking
Domain Creation
Reporting
Operations
EMaaS Program
Service Transfer
Optimization
M&E Alignment
EOSProject Methodology
0-4 MonthsActivities & Deliverables
4-8 MonthsActivities & Deliverables
8-12 MonthsActivities & Deliverables
© 2012 Cisco and/or its affiliates. All rights reserved.
Project Deliverables
IT Load and Building LoadElectrical Utilization
Network CollectorSNMP, vPro, EnergyWise
Establish & Validate BenchmarksReport 1.3
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 26
Asset Discovery
Phase 1Discover & Benchmark
Phase 2Domains & Reporting
Phase 3Operate & Transfer
Profile Analysis
Benchmarking
Domain Creation
Reporting
Operations
EMaaS Program
Service Transfer
Optimization
M&E Alignment
EOSProject Methodology
0-4 MonthsActivities & Deliverables
4-8 MonthsActivities & Deliverables
8-12 MonthsActivities & Deliverables
© 2012 Cisco and/or its affiliates. All rights reserved.
Project Deliverables
Compute + Storage + NetworkElectrical Utilization
Network CollectorSNMP, vPro, EnergyWise
Establish & Validate BenchmarksReport 1.4
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 27
Asset Discovery
Phase 1Discover & Benchmark
Phase 2Domains & Reporting
Phase 3Operate & Transfer
Profile Analysis
Benchmarking
Domain Creation
Reporting
Operations
EMaaS Program
Service Transfer
Optimization
M&E Alignment
EOSProject Methodology
0-4 MonthsActivities & Deliverables
4-8 MonthsActivities & Deliverables
8-12 MonthsActivities & Deliverables
© 2012 Cisco and/or its affiliates. All rights reserved.
Project Deliverables
ComputeSystem Utilization
Network CollectorSNMP, vPro, EnergyWise
Establish & Validate BenchmarksReport 1.5
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 28
Asset Discovery
Phase 1Discover & Benchmark
Phase 2Domains & Reporting
Phase 3Operate & Transfer
Profile Analysis
Benchmarking
Domain Creation
Reporting
Operations
EMaaS Program
Service Transfer
Optimization
M&E Alignment
EOSProject Methodology
0-4 MonthsActivities & Deliverables
4-8 MonthsActivities & Deliverables
8-12 MonthsActivities & Deliverables
© 2012 Cisco and/or its affiliates. All rights reserved.
Project Deliverables
Cloud Energy ManagementMonitoring, Reporting & Integration
Energy Manager Set UpEstablishing Logical Energy Domains
Energy Domain DesignReport 2.1
Considerations
Use Case
Application
Criticality
Division
Admin
Location
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 29
Asset Discovery
Phase 1Discover & Benchmark
Phase 2Domains & Reporting
Phase 3Operate & Transfer
Profile Analysis
Benchmarking
Domain Creation
Reporting
Operations
EMaaS Program
Service Transfer
Optimization
M&E Alignment
EOSProject Methodology
0-4 MonthsActivities & Deliverables
4-8 MonthsActivities & Deliverables
8-12 MonthsActivities & Deliverables
© 2012 Cisco and/or its affiliates. All rights reserved.
Project Deliverables
Facilities AlignmentAssociate IT Load to Facilities Load
Energy Manager Set UpEstablishing Logical Energy Domains
Facilities Integration DesignReport 2.2
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 30
Asset Discovery
Phase 1Discover & Benchmark
Phase 2Domains & Reporting
Phase 3Operate & Transfer
Profile Analysis
Benchmarking
Domain Creation
Reporting
Operations
EMaaS Program
Service Transfer
Optimization
M&E Alignment
EOSProject Methodology
0-4 MonthsActivities & Deliverables
4-8 MonthsActivities & Deliverables
8-12 MonthsActivities & Deliverables
© 2012 Cisco and/or its affiliates. All rights reserved.
Project Deliverables
Customized Reporting TemplatesKey Performance Metrics
Energy Reporting Set UpEnergy Monitoring
Energy Reporting TemplateReport 2.3
Considerations
Efficiency
Capacity
Cost
Division
Admin
Location
Utilization
Platform
GHG
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 31
Asset Discovery
Phase 1Discover & Benchmark
Phase 2Domains & Reporting
Phase 3Operate & Transfer
Profile Analysis
Benchmarking
Domain Creation
Reporting
Operations
EMaaS Program
Service Transfer
Optimization
M&E Alignment
EOSProject Methodology
0-4 MonthsActivities & Deliverables
4-8 MonthsActivities & Deliverables
8-12 MonthsActivities & Deliverables
© 2012 Cisco and/or its affiliates. All rights reserved.
Project Deliverables
Efficiency RecommendationsCapacity & Control Policy Evaluation
Energy OptimizationEstablishing Governance
Systems Utilization AssessmentReport 2.4
Considerations
Cooling
Utilization
Usage
PhysicalLoad
AdaptiveModeling
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 32
Asset Discovery
Phase 1Discover & Benchmark
Phase 2Domains & Reporting
Phase 3Operate & Transfer
Profile Analysis
Benchmarking
Domain Creation
Reporting
Operations
EMaaS Program
Service Transfer
Optimization
M&E Alignment
EOSProject Methodology
0-4 MonthsActivities & Deliverables
4-8 MonthsActivities & Deliverables
8-12 MonthsActivities & Deliverables
© 2012 Cisco and/or its affiliates. All rights reserved.
Project Deliverables
Programmatic SupportKnowledge Transfer
Energy ProgramEstablishing Energy as a Service (EaaS)
Organizational AlignmentReport 3.1
CarbonAccounting
Chief Financial Office
IT Department Facilities Department
Energy Manager
Partners Buildings
Network
StorageCompute
Cisco Services
$ $
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 33
Asset Discovery
Phase 1Discover & Benchmark
Phase 2Domains & Reporting
Phase 3Operate & Transfer
Profile Analysis
Benchmarking
Domain Creation
Reporting
Operations
EMaaS Program
Service Transfer
Optimization
M&E Alignment
EOSProject Methodology
0-4 MonthsActivities & Deliverables
4-8 MonthsActivities & Deliverables
8-12 MonthsActivities & Deliverables
© 2012 Cisco and/or its affiliates. All rights reserved.
Project Deliverables
Scaling the ProgramStrategic Planning
Energy ProgramEstablishing Energy as a Service
Energy Management Program Strategic RoadmapReport 3.2
Considerations
Data Centers
Branches
Campus
eGRID
Smart Grid
BC/DR
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 34
Asset Discovery
Phase 1Discover & Benchmark
Phase 2Domains & Reporting
Phase 3Operate & Transfer
Profile Analysis
Benchmarking
Domain Creation
Reporting
Operations
EMaaS Program
Service Transfer
Optimization
M&E Alignment
EOSProject Methodology
0-4 MonthsActivities & Deliverables
4-8 MonthsActivities & Deliverables
8-12 MonthsActivities & Deliverables
© 2012 Cisco and/or its affiliates. All rights reserved.
Project Deliverables
Scaling the ProgramStrategic Planning
Energy ProgramEstablishing Energy as a Service
Energy Optimization Service GuideReport 3.3
Network
Storage
Compute
UPS
Cooling Systems
Costs
Monitoring
Event Based
Location Based
Time of Day
Load Adaptive
Smart Grid
Opt-in
Control Policies
Location
Asset Type
Division
System Utilization
Individual
Costs & GHG
Reporting
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 35
Q&A
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 36
• Cisco EnergyWise Design Guidehttp://www.cisco.com/en/US/solutions/ns340/ns414/ns742/ns815/landing_energywise.html
• Energy Management “How to” Guide:IP-Enabled Energy Management: A Proven Strategy for Administering Energy as a Service. Rob Aldrich, John Parello, Wiley Press, 2010www.ipenergyservices.com or Google “IP Energy Book”
• Cisco on Cisco Case StudyWhite Paper: Implementing Energy as a Servicehttp://www.cisco.com/en/US/prod/collateral/switches/ps5718/ps10195/CiscoEMSWhitePaper.pdf
• Energy Management Services Data Sheet
http://wwwin.cisco.com/etg/smartgrid/files/services_energy_management.pdf
Thank you.
www.cisco.com/go/efficiency
www.cisco.com/go/EnergyWise