FactoryTalk Metrics: Showing Value in 50 Minutes

Embed Size (px)

DESCRIPTION

If you had 50 minutes, a computer running FactoryTalk Metrics, and an information engineer, what could you do? In this session, the instructor will lead you thru solution creation on-the-fly. What types of ad-hoc analysis can you do? What types of content are easiest to develop? Could you really show the value of OEE in the allotted time? Come see.

Citation preview

Page 1: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

PUBLIC INFORMATION

FactoryTalk® Metrics: Showing Value in 50 Minutes

Measure and improve operations today.

Page 2: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. 2

Agenda

Summary

Second Pass – Optional Steps – 6.5 Minutes

First Pass – Required Steps – 8.5 Minutes

Session Overview

Scope

Page 3: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

Scope

3

Basic steps to meet requirements for FactoryTalk Metrics Review specific reports that are available

Recommended steps to show case what is possible with additional effort Report Overview to highlight how to use the additional context

Contrast and Summarize the two different approaches

Page 4: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

Session Overview

4

We have about 40 minutes Create a simple worksheet of basic data Transform these data points into actionable information

Part Counts by type – Good / Scrap / Total Parts Define Machine states that measure your assets your way Comprehensive reporting that enables you to make changes right now Decrease Down time and complete production in 5 days not 7

A two pass scenario Everyone is at a different place but we all need to drive results now Required configuration – delivers key KPIs quickly Recommended Configuration – delivers additional detail that will

enable you to focus on key operations to targets providing the root cause reasons why you are unable to meet or exceed goals

Page 5: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

Required Steps

5

S95 Plant Model This is quick, simple and industry standard. Provides structure to the data and adds roll-up

Example: My Company (Enterprise) | My Site(Site / Location) | Production (Area) | Line 1 (Line) | L11 Filler (Workcell). You can use this model to summarize your data at any S95 Level

Key to organizing plant operations and provides a saleable link to enterprise software

Software Schedule Create custom schedules to store you data by shift to support time

date reporting FactoryTalk Metrics supports variable length shifts but we are not

covering that feature in this lab

Page 6: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

S95 Model Creation

6

Page 7: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

Create a Production Schedule

7

Page 8: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

Assign the Schedule to a Workcell

8

Page 9: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

First Pass Configuration

9

You need three tags Running Indication

This should be a Boolean bit that is high (1) when running Running means you are producing parts

Good Part Counter This should be an accumulated value that does not reverse or go negative but

can reset automatically Cycle Time

In seconds how long does it take to make one part / pound / case – you pick the unit of measure

Cycle time can be a tag, derived from a lookup or typed in Example

Page 10: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

First Pass Configuration – Tag List

10

Basic Tag List

Page 11: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

First Pass Configuration

11

Page 12: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

Initial Configuration is Complete

12

After less than 9 minutes Production Reporting

Good part counts Detect down time Down time VS Fault Time?

OEE, Availability, Performance and Quality. Dashboards including a white board with dynamic time

Lets take a look!

Page 13: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

First Pass Reporting

13

Page 14: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

Second Pass Tag List

14

Track parts by type - String Track performance by operator - String Add scrap part counter to measure waste – Accumulated Value Detect Blocked and Starved conditions – Boolean Add Boolean faults – most common Integrated event driven by an Operators input – Trigger / String

Page 15: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

Second Pass Configuration

15

Page 16: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

Second Pass Configuration - Reporting

16

Page 17: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

After 15 Minutes and 12 Tags

17

Every thing we just showed is based on a Configured application S95 Model Plant Schedule Configuration shown with only the most basic tags – anyone with a run

bit, part counter and cycle time can deliver OEE now. Configuration shown with additional tags that drive advanced topics

Page 18: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

Summary Results

18

Performance management that grows with you Self Service Reporting Dashboards, whiteboards totaling 69 reports Operator Ranking Production reporting with part counting by type including good/scrap/total

parts. Blocked and starved detection Root cause event example. Any and all Boolean events that drive machine states. All KPIs including OEE, Availability, Performance, Quality, MTBF and

MTTR to name a few

Page 19: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

We care what you think!

On the mobile app:1. Locate session using

Schedule or Agenda Builder2. Click on the thumbs up icon on

the lower right corner of the session detail

3. Complete survey4. Click the Submit Form button

19

Please take a couple minutes to complete a quick session survey to tell us how we’re doing.

2

3

4

1

Thank you!!

Page 20: FactoryTalk Metrics: Showing Value in 50 Minutes

Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.

www.rsteched.com

Follow RSTechED on Facebook & Twitter.Connect with us on LinkedIn.

PUBLIC INFORMATION

Questions?