22

Final Presentation of Team E phase 1

Embed Size (px)

Citation preview

BELIEVE.CONFIDENCE

WE ARE E

PROJECT MANAGER: T.M.R.J.B.TENNAKOON

SYSTEM ARCHITECT: D.C.MEGASOORIYA

PROJECT SECRETARY: M.AHMED

HEAD OF ANALYSIS: R.G.HEWAPATHABUSINESS ANALYST: B.E.MUTHUKUMARANA

OUR TEAM IS EMPOWERED

T.M.R.J.B Tennakoon Project

Chairman/CEO

D.C. Megasooriya System Architect

R.G.HewapathaHead of Analysis

B.E MuthukumaranaBusiness & Assistant

System Analyst

M.AhmedAssistant Software &

QA Engenner And, Project Secratory

PRELIMINARY PROBLEM ANALYSIS

S.D.L.C METHOD

DEVELOPMENT

TIMELINE

SYSTEM OUTLINING

ANALYZING

problem solver’s view point

ANALYSIS METHODOLOGY

CONVENIENCE

COST EFFECTIVE

THE ENTITY RELATIONSHIP MODEL

CLEAR ANALYZING ABILITY

QUICK SRS COMPILATION

AIDING TO QUICK SYSTEM IMPLEMENTATION

REVIEWS FOR THE SYSTEM

System Reviews

The company based

The policy maker based

-SYSTEM REQUIREMENT SPECIFICATION-

THE SDLC METHODOLOGY

PRECISE USER REQUIREMENT

-A SYSTEM TO MANAGE RENT AND HIRE OF THE COMPANY

THE PRODUCT

RENT AND HIRE MANAGEMENT

SYSTEM

DESIGNING

blueprint for reality

DESIGNING FOR THE RENT AND HIRE MANAGEMENT SYSTEM

Approaches

OOP Structured

DEVELOPMENT

the backbone

TESTING

assures the quality

Testing strategy

THE TEST PLAN

TESTING METHODOLOGY

PEOPLE

WHEN AND WHERE

AREAS TESTED

Testing cases/areas

CORE OF BLACK BOX TESTING

ASSURES QUALITY OF TEST AREAS

DEMONSTRATES THE AREAS TO DEBUG

FINALIZE THE SYSTEM DEVELOPMENT

IMPLEMENTATION

the necessity

PROJECT MANAGEMENT

the spirit

EFFECTIVE MANAGEMENT OF PROJECT

THE TRIPLE CONSTRAINS

-SCOPE APPRAISAL

-TIME APPRAISAL

-COST APPRAISAL

MANAGING PEOPLE

QUALITY ASSURANCE

  LKR (000’)

Fixed Expenses  

   Computers & proposed software 90

   Copyright and other related 27.2

   Transportation 3

   Other 20

   

Total Fixed Expenses 93

   

Variable Expenses  

Food 3

Other 20

Total Variable Expenses 23

   

Total Expenses 173.2

The Project budget

ANY QUESTIONS?

THANK YOU