Welcome! H.B. 264 Significant Updates Webinar This webinar has been approved for 1.0 HSW AIA CEUs For those interested in AIA CEU credit: If you plan to watch this webinar in a group environment, and are interested in receiving AIA credit, please note the following. In order to have backup documentation of webinar attendance for AIA, you will need to individually register and then individually login / logout for the webinar. GoToWebinar automatically tracks how long the person remains in the webinar. So, in actuality, it's much like signing the AIA roster page after a conference session to document your attendance. Suggestion: login / logout from your personal computer—then join your group in the conference room. After the webinar: Email Sue Meyer at [email protected] indicating your interest in receiving AIA credit along with your membership number. Your participation will be reported to AIA and you will receive a certificate of attendance via email.

HB264 significant changes

  • Upload
    drieker

  • View
    916

  • Download
    1

Embed Size (px)

DESCRIPTION

House Bill 264 Significant Changes Slideshow

Citation preview

Page 1: HB264 significant changes

Welcome!

H.B. 264 Significant Updates WebinarThis webinar has been approved for 1.0 HSW AIA CEUs

For those interested in AIA CEU credit:If you plan to watch this webinar in a group environment, and are interested in receiving AIA credit, please note the following.

In order to have backup documentation of webinar attendance for AIA, you will need to individually register and then individually login / logout for the webinar. GoToWebinar automatically tracks how long the person remains in the webinar. So, in actuality, it's much like signing the AIA roster page after a conference session to document your attendance.

Suggestion: login / logout from your personal computer—then join your group in the conference room.

After the webinar:Email Sue Meyer at [email protected] indicating your interest in receiving AIA credit along with your membership number. Your participation will be reported to AIA and you will receive a certificate of attendance via email.

Page 2: HB264 significant changes

H.B. 264 School Energy Conservation

Finance Program

2012 Submittal Guide Requirements & Guidelines

Page 3: HB264 significant changes

The 2012 Addition

• Changes in law– Governing Law: 133.06 (G)– 2011Changes: H.B. 153

• Emphasis on existing requirements• Refinement of requested information

Page 4: HB264 significant changes

Learning Points

• Changes in law governing H.B. 264• Requirements for a H.B. 264 proposal• District responsibilities• Basic energy conservation strategies

and principles

Page 5: HB264 significant changes

H.B. 264 Basic Requirements

• Proposed energy conservation measures (ECM) must have a reasonable energy component

• Proposed project cumulative payback including any finance cost must be fifteen years or less

• Must have a school board action

Page 6: HB264 significant changes

Review/Approval Process

• Submit proposal• OSFC staff reviews and makes recommendation

concerning approval• Commission votes (approve/disapprove)• A formal letter is issues to the district• The project can begin the day of the approval

after the official Commission vote

Page 7: HB264 significant changes

Review Philosophy

• Reasonableness– Engineering– Energy management– Cost

• School district – Ownership– Responsibility

Page 8: HB264 significant changes

Review Team

• Mark Wantage, OSFC• Marlaina Hill, OSFC• Been Kuo, OSFC• Franklin Brown, OSFC• Other OSFC resources as needed• Tony Sutor, Ohio Department of Development• Scott Thrapp, Ohio Department of Development

Page 9: HB264 significant changes

H.B. 264 Submittal Guide Introduction

• Helpful hints• OSFC contact information• New requirement:

– Goal: paperless process– Electronic submittals only

• Single searchable Adobe.pdf file• Two copies if mailed

Page 10: HB264 significant changes

Section 1 - 3

These sections form the basis of the accountability and tracking of the project1.Transmittal letter2.Contact information3.Qualifications (of the individual/team developing the proposal)

Page 11: HB264 significant changes

“Historical High”

Page 12: HB264 significant changes

Section 4

• Executive Summary– Brief short to-the-point capsulation of the

proposed project and expected outcomes– Summary data must match data in document– Include:

• Total project cost with interest• Project payback years (three significant digits)• Any estimated grants, rebates, etc.

Page 13: HB264 significant changes

Section 5

• School Board Resolution– Board action is required before

Commission approval– Project total cost (including financing)– Identify any estimated grant, rebate, non-

district dollars– Statement acknowledging the requirement

for annual performance report

Page 14: HB264 significant changes

Section 5 (continued)

• School Board Resolution– Intention to maintain facility staff Building

Operators Certification (BOC)– Any actions relative to OSFC funded programs

Waver of Competitive Bidding if desired by the district Requires 2/3 vote majority of the board

membership

Page 15: HB264 significant changes

Section 6

• OSFC Eligibility– Memorializes discussions, understandings

and intent of the district with regards to both programs

– Intent is to maximize the opportunities of both programs for the district

– Use more than bulleted answers

Page 16: HB264 significant changes

OSFC Statistic

First Building Completed November 2000

Huntington Local (Ross) Renovation /Addition Project

Page 17: HB264 significant changes

Section 6

• OSFC Eligibility– Completed OSFC funded facilities must

have OSFC project team concurrence– Reconcile Maintenance Plan and district

034 Maintenance Fund – Laws and policies governing the OSFC

take precedence

Page 18: HB264 significant changes

Section 7

• Previous H.B. 264 Projects– Must identify (list located on OSFC

website: http://osfc.ohio.gov/Programs/EnergyConservationProgramHB264.aspx

– Active projects must be clearly tracked for the respective annual performance reports

– Proposed project must clearly define the separation of performance from past active projects

Page 19: HB264 significant changes

Section 8 (ref Section 17)

• Claim of Estimated O&M Savings– Up to 30% of estimated savings may come

from estimated savings from O&M – Five year baseline– Five year limit on estimated claimed savings– Requires district treasurer to certify

estimates of savings

Page 20: HB264 significant changes

Section 8 (continued)

• Claim of Estimated O&M Savings– Estimated O&M savings over 10% requires

more detail• Individual ECM O&M summary detail• Changes to operations service requirements

– District treasurer to certify

Page 21: HB264 significant changes

Existing Building Issue

Page 22: HB264 significant changes

Section 8 (continued)

• Expectation– All operational tasks and needs for the

proposed project are identified– All district responsibilities and tasks are

presented and understood

Page 23: HB264 significant changes

Mechanical Room

Page 24: HB264 significant changes

Section 9

• Energy Performance, Tracking & Reporting– Energy Star Portfolio Manager

• Include the district IRN at the beginning of building name (example: 54321- Sue High School)

– Commissioning and re-commissioning– Annual performance verification reporting– Use energy management professional with

experience

Page 25: HB264 significant changes

O&M at Work

Page 26: HB264 significant changes

Section 9 (continued)

• Energy Performance, Tracking & Reporting– Strategy:

• Track Energy Star rating• Monitor utility bills• Monitor O&M performance• Re-commission every five years

– Drop in rating: shorter interval– Maintain rating: longer interval

• Monitor indoor environmental quality (IEQ)

Page 27: HB264 significant changes

Sections 10 & 11

• Details of the ECMs– Estimated kBtu/sqft performance– Residual value

• Residual value = Original cost x Remaining useful lifeOriginal useful life

– Most recent five consecutive years of utility data for baseline

– ECMs with no claimed savings

Page 28: HB264 significant changes

Section 12

• Financial Analysis– Show analysis for the payback period– Estimated data

• Total project cost• Grants/ rebates, non-district dollars• Finance rate• Finance amount• Project costs and savings categories

Page 29: HB264 significant changes

Section 13

• Energy Savings Calculations– Individual payback period must be

reasonable– Estimated replacement cost must be

included if the equipment life cycle is less then the payback (ECM and project)

Page 30: HB264 significant changes

Section 13 (continued)

• Energy Savings Calculations– Energy Modeling

• eQUEST• Other

– OSDM Compliant– 30% above ASHRAE

Page 31: HB264 significant changes

Common ECM?

Page 32: HB264 significant changes

Section 14

• Building Automation Systems– Summary of the designed intent– Summary of changes– Points list– Requires service agreement– Re-commissioning required at least every

5 years

Page 33: HB264 significant changes

Opportunity for Improvement?

Page 34: HB264 significant changes

Section 15

• Lighting Project Information– Cannot claim labor savings– Summary of designed intent– Lighting map– Basic data

• Foot-candle and Lumen output and profile• Color and temperature• Degradation over time

Page 35: HB264 significant changes

Posibilities

Page 36: HB264 significant changes

Section 16

• Wind and Solar Project information– Ohio Department of Development/ Office of

Energy Efficiency (ODOD/OERD) based process

– Stand alone document useful for anyone considering energy generation and a service provider

Page 37: HB264 significant changes

Section 17 (ref. Section 8)

• Operations and Maintenance Information– Summarize manufactures O&M

requirements– Recommend input into CMMS– District guidance

• Identify task for and requirements of the district• Update OSFC maintenance plan

– Back up information for claimed savings

Page 38: HB264 significant changes

Section 18

• Measures with no claim of cost savings– Required annual reporting (Must include

into project cost)– 3RD party commissioning

• Project development• Post project retro-commissioning

– Facility staff training (including BOC)

Page 39: HB264 significant changes

Section 18 (continued)

• Measures with No Claim of Cost Savings– Energy performance related tasks

• Energystar label• Dashboards• Sub metering• Performance Monitoring

– New service contract tied to ECMs– IAQ or EQ projects or programs

Page 40: HB264 significant changes

Section 19

• All Other Work– Any current of future work outside of the

project scope as proposed– Provide clarity– Avoids confusion

Page 41: HB264 significant changes

Section 20

• Equipment Cut Sheets

Page 42: HB264 significant changes

Section 20

• AppendixA. Opportunities Assessment Certification

StatementB. Wind/Solar Project Technical Worksheet

Page 43: HB264 significant changes

Project Payback Period

• OSFC Look Back Program• Required district annual performance report• OSFC responsibilities

Page 44: HB264 significant changes

Recommendations

• Professional with at least three years of recent direct relevant experience

• Certified Energy Manager or equivalent• References

– Projects posted on OSFC website– OSFC project reports

• 3RD Party Independent

Page 45: HB264 significant changes

Self performance

• A district may develop and/or self perform a H.B. 264 project– Proposal must meet same standards– Must show ability to insure success

• Staff expertise• District commitment• A plan

– Cannot include labor savings

Page 46: HB264 significant changes

Future

• Continue the OSFC Look Back Project– 2002 and 2003 completed– 2004 in progress– All districts with active projects (payback

period)• Web based process

Page 47: HB264 significant changes

Your Caption Here

Page 48: HB264 significant changes

House Bill 264 Projects

• Look Back Information

Ohio Energy Resources Division

Page 49: HB264 significant changes

OSFC H.B. 264 Look Back

• Two years of data following the year the project was approved– Approved in 2005: require data for 06 & 07

• All active payback years will be reviewed

Page 50: HB264 significant changes

OSFC Look Back Process

1. Letters will be sent out to school districts2. Letters will be sent out to vendors3. A deadline will be given and all data must be

submitted prior to the date4. You may submit by mail or email5. MUST BE RECEIVED BY THE DEADLINE!6. After the data has been reviewed school

onsite visits will be scheduled.

Page 51: HB264 significant changes

OSFC Look Back Process

7. The vendor, school, OSFC, & OERD will attend

8. Not all schools will be visited9. OSFC/OERD will look at ECM’s, feedback, &

take pictures10.All information will be reported to the

Commission

Page 52: HB264 significant changes

OSFC H.B. 264 Look Back

• The minimum data required will need– Usage & cost total for each building for each

year• kWh• MCF• CCF• Sqft per building

– Do not only send savings or adjusted saving

Page 53: HB264 significant changes

Report Analysis

• KBtu's/ Sqft• Costs / Sqft• kWh, MCF, CCF, MMBTU, costs

– Baseline vs. proposal – Proposal vs. actual – Baseline vs. actual

Page 54: HB264 significant changes

Report Analysis

• Variance between the comparisons• Reports will be in terms of real figures

(savings & use) and percentages• Reports will be compared to other schools• Performance by vendor will be compared• Results are public record & posted online

Page 55: HB264 significant changes

Look Back Payback Period

• Look at the proposal– Actual performance– Actual performance with O&M– Actual performance with O&M and

adjustments to the savings• The rate (baseline) will be multiplied by energy

savings and then added to the actual performance with O&M

Page 56: HB264 significant changes

Look Back Template (example)

Page 57: HB264 significant changes

Look Back Payback Period

Further investigation or action will be taken if the project has not shown a payback period of 15 years or less

Page 58: HB264 significant changes

Thank you

Questions?

Page 59: HB264 significant changes

Questions After the [email protected]