INTEGRATED GEOLOGICAL HAZARD MANAGEMENT SYSTEM
Kirk D. BeachOhio Department of Transportation
Robert Y. Liang, Ph.D., P.E.University of Akron
Frank FengAcetek Ltd.
Ohio’s Geological HazardsAbandoned Underground MinesRockfallsLandslidesKarstShoreline Erosion
Development of a Geologic Hazard Management System
History1998
Abandoned Underground Mine Inventory & Risk Assessment2000
Developed a database application for AUMIRA Initiated inventory of AUMIRA sites
2001 Research work conducted to develop the Rockfall Inventory
2003 Research work began on the Landslide Inventory
2004 Development of a Remediation Cost Database Application
Development of a Geologic Hazard Management System
History2005
Implemented statewide Rockfall Inventory2008
Initiated an inventory of Landslide sites across the state2009
Integrated the Geohazard Inventories with the RCDA and DocMS
2010 Completed the statewide inventory of AUMIRA sites Completed the Integration of the Geological Hazard
Management System
DocMS• Document
Management System
LIMs • GeoLIMsGSMP
• Geologic Site Management Program
RCDA
• Remediation Cost Database Application
GHMS
• Geological Hazard Management System
Geotechnical Data Management
System
Enterprise Database
Pictures, Files,
Diagrams
Field Data
Laboratory Test Data
Xplore ix104c
Field Data InputConsistency
Project location informationFunctionalityEquipment compatibility
Multiple data input modesBluetoothSerial portsOther manual methods
Field & Office Data CollectionTier 3 & 4
Tier 2
Tier 1
6.2-hrs
1.58-hrs
0.83-hrs
5.17-hrs
Bluetooth…
Pictures
Field Operation
s
Server
Office
Geological Hazard Management SystemData Management
Part APart BPart C
GIS MapData Management
System ManagementUser ManagementGroup ManagementRole ManagementUser ApprovalSystem Tools
Geological Hazard Management SystemData Management Extension
ExportsGenerating ReportsDocuments and PicturesCost of RemediationInspectionValidation Settings
User ForumReporting BugsProviding Suggestions
NotificationGeohazard Report
Status of Statewide InventoriesAbandoned Underground Mine Inventory
Complete with 1776 site reviews with 1171 Inventoried Sites
Represents 495 lane miles Estimated remediation cost of $875 Million for 555 Priority
Sites Rockfall Inventory
47% complete5000 sitesEstimate 1.5-yrs to complete
Landslide Inventory23% complete5100 sitesEstimate 3-yrs to complete
Thank you!