DESCRIPTION

สไลด์ประกอบการบรรยายให้กับกลุ่มผู้เข้าอบรมโครงการ ส่งเสริมผู้ประกอบการใหม่ (NEC) มหาวิทยาลัยบูรพา เมื่อวันที่ 20 ธันวาคม 2551

Citation preview

Page 1: IT for Production & Manufacturing

IT for Productions& Manufacturing

Pantit Sirapobthada

Page 2: IT for Production & Manufacturing

Material Requirement Planning (MRP-1)

Page 3: IT for Production & Manufacturing

Material Requirement Planning (MRP-1)

Types Of Techniques

PUSH PULL

MRP1 JITMRP2 KANBANDRP1DRP2

Page 4: IT for Production & Manufacturing

HAPPY CUSTOMER. HAPPY SUPPLIER…..

Page 5: IT for Production & Manufacturing

Major Problem

Dependent on Accurate Forecasting

Only Solution…

Buy ‘Just Enough’ Stock

Page 6: IT for Production & Manufacturing

Material Requirement Planning (MRP-1)

Introduction of MRP in 1960’s by Dr Joseph Orlicky.

Definition :MRP is a software based production, planning and inventory control system used to manage the manufacturing process.It is a computer based system in which the given Master Schedule is exploded with Bills Of Material, into the required amount of raw material, parts and subassemblies needed top produce the final products in each tome period of say a week or month (called as “Buckets”)

Page 7: IT for Production & Manufacturing

MRP 1 - Functions

ForecastingOrder, Planning and ControlPriority Planning and ControlPlanning Capacity Requirement and

Development of Broad Business Plans

Page 8: IT for Production & Manufacturing

Objectives

Ensure The Availability of Material Components and Products For Planned Production and Customer Delivery.

Maintain The Lowest Possible Inventory Level. Plan Manufacturing Activities, Delivery

Schedules and Purchasing Activities.

Page 9: IT for Production & Manufacturing

Key Elements Of MRP 1 Demand Forecasting:-

It is the quantity demanded per year or per unit time which indirectly helps in knowing quantity to be supplied.

Master Production Schedule (MPS):-MPS is a series of time phased quantities for each item that a company manufactures. It gives the details of the products to be manufactured over the given space of time.-

Page 10: IT for Production & Manufacturing

Example of MPS

Forecast requires 10 desks in May

20 desks in June

Material Required 880 screws 40 handles 240 planks 10 tops and 40 legs 5.55 tubes of glue

1760 screws 80 handles 480 planks 20 tops and 80 legs 11.1 tubes of glue

Page 11: IT for Production & Manufacturing

Bills Of Material (BOM):-BOM is the document generated at design stage. It gives the details of the structure of the product by dividing the final assembly into major assemblies and sub-assemblies. BOM provides details such as part name, part no., description, quantity required material, etc.

Page 12: IT for Production & Manufacturing

88M e ta l S c re w s

4H a n d les

24P la n ks

4 d ra w e rsR e q u ire

1top

4le gs

5 /9tu be o f g lue

M a in D e skR e q u ires

O ffice D e skO a k F in ish4 d ra w e rs

Page 13: IT for Production & Manufacturing

Inventory Status File (ISF):-

ISF reports the inventory on hand. It allows the company to subtract existing inventory from gross requirements, so net requirements can be ordered. The ISF also reports on safety stock needs and lead times for each item.

Page 14: IT for Production & Manufacturing

MRP Program:-This is a computer software programme. First, it explodes the finish product’s demand into gross requirement for parts. Second, the package determines net requirements based on the ISF. Third, it place orders to meet the net quantities needed and lead times.

Page 15: IT for Production & Manufacturing

Material Requirements Planning MRP1

MasterProductionSchedule

MRPMaterial

requirement planning

Material plans

Customer orders

Bill of materials

Purchase orders

Demand forecast

Inventory records

Works orders

Page 16: IT for Production & Manufacturing

Outputs And Reports:-

The MRP 1 package generates many reports such as action notices, priority reports, inventory status information.

Page 17: IT for Production & Manufacturing

Advantages of MRP

Improved Business Results Improved Manufacturing Results More Accurate And Timely Information Less Inventory Less Materials Obsolescence Time Phased Ordering Of Materials

Page 18: IT for Production & Manufacturing

Higher Reliability More Responsiveness To Market Demand Reduced Production Cost

Page 19: IT for Production & Manufacturing

Disadvantages

Increase In Material Acquisition Cost

Higher Transportation Costs And Higher Unit Cost

Potential Hazard Of A Production Slowdown Or Shutdown

Page 20: IT for Production & Manufacturing

Use Of Standardized Software Packages

Does not Take Into Account Plant Capacity And Distribution Capacity

High Stock-Out Costs.

Page 21: IT for Production & Manufacturing

Manufacturing Requirement Planning(MRP II)

Page 22: IT for Production & Manufacturing
Page 23: IT for Production & Manufacturing

Manufacturing Resource Planning (MRP II)

is defined as a method for the effective planning of all resources of a manufacturing company. Ideally, it addresses operational planning in units, financial planning in dollars, and has a simulation capability to answer "what-if" questions and extension of closed-loop MRP.

Page 24: IT for Production & Manufacturing

MRP• Manufacturing-centric/Push mgt.• Master production schedule• Final production schedule• Inventory management• Bill of materials• Gross requirement generation• Net requirement generation• Reorder point calculation• Automatic replenishment

MRP I I• Capacity requirement. planning• Production control• Marketing interface• Accounting interface• Financial interface• Personnel interface• Supplier interface• Customer interface

Page 25: IT for Production & Manufacturing
Page 26: IT for Production & Manufacturing
Page 27: IT for Production & Manufacturing

Major Developments From MRP

Feedback

Allocating reserves

Matching the requirements

Software extension programmers

Data accuracy

Page 28: IT for Production & Manufacturing
Page 29: IT for Production & Manufacturing

Significant Payback Achieved By Coca-cola

Page 30: IT for Production & Manufacturing

Coca Cola: "Always" Class A MRP II Inventory levels: down Productivity: up Customer delivery performance:

improved Supplier delivery performance: better Business Processes: improved Data integrity: high Cost of goods: down Team Spirit: high

Page 31: IT for Production & Manufacturing

Benefits In Different Levels

Page 32: IT for Production & Manufacturing

For Management An accurate, consistent and effective way to

run the whole business

The ability to manage orderly growth

The ability to cope with difficult economic conditions

Page 33: IT for Production & Manufacturing

For Management Information

Quicker, better information on which to base decisions

Consistent information at all levels, in all departments

Accurate records for internal and external use

Page 34: IT for Production & Manufacturing

For Sales / Marketing Improved on-time deliveries to customers

Faster, more accurate delivery promising

Improved responsiveness to customer needs

Page 35: IT for Production & Manufacturing

For Production Improved productivity and resource utilization

Increased through output

Better reliability of production plans

Page 36: IT for Production & Manufacturing

For Materials Management Better control of inventories

Improved scheduling

Productive relationships with suppliers

Page 37: IT for Production & Manufacturing

For Design / Engineering Improved design control

Better quality and quality control

Page 38: IT for Production & Manufacturing

For Financial and Costing Reduced working capital for inventory

Improved cash flow through quicker deliveries

Accurate inventory records

Timely and valid cost and profitability information

Page 39: IT for Production & Manufacturing

For And Against MRPII

Page 40: IT for Production & Manufacturing

FOR Long term planning tool for complex products

Can give accurate completion date at time of order

Fits in with conventional accounting

Progress of manufacture available at all times

Inventory size available at all times

Control of work orders and changes is tight

Many types of software available

Page 41: IT for Production & Manufacturing

Against File/database accuracy must be maintained

Inventory accuracy is vital (99% accuracy is a typical requirement)

Highly computer based

Does not affect quality management, line balancing, or other production management issues

Inflexible and relies on forecast. Temptation exists to over-ride and go manual

Page 42: IT for Production & Manufacturing

Distribution Requirements Planning (DRP – I)

Page 43: IT for Production & Manufacturing

Distribution Requirements Planning (DRP I)

DRP is the application of MRP principles to the distribution environment. It integrates the, special needs of distribution. It is a dynamic model which looks at a time-phased plan of events that affect inventory.

Page 44: IT for Production & Manufacturing

What is DRP?

DRP provides the basis for integrating supply chain inventory information and physical distribution activities with the Manufacturing Planning and Control system.

Page 45: IT for Production & Manufacturing

What is DRP?

Managing the flow of materials between firms, warehouses, distribution centers.

DRP helps manage these material flows. Just like MRP did in Manufacturing.

Links firms in the supply chain by providing planning records that carry demand information from receiving points to supply points and vice versa.

Page 46: IT for Production & Manufacturing

DRP Menu Items Component Description Purpose in DRP

Material Master Creates stock items and controlling elements of items, locations and policies that are used in the deployment process.

Inventory Management Tracks inventory availability in all stock categories and supply and demand for an item.Also allows for the physical movement of inventory.

Sales Planning, Forecasting and Demand Management

Creates forecasts of customer demand which results in the creation of independent requirements at the distribution center.These independent requirements are later consumed by actual customer orders.

Purchasing Creates quota arrangements that control the supply relationships in the network.

Materials Requirements Planning Determines net supply and demand resulting in a proposal for the transfer of inventory from the plant to the distribution center.

Page 47: IT for Production & Manufacturing

Marketing Benefits

Increases service level and decrease customer complaints.

Improve inventory coordination. Enhances ability to offer customer a coordinated

inventory management service.

Page 48: IT for Production & Manufacturing

Logistical Benefits

Reduces freight costs. Reduces inventory level. Decreases warehousing space. Reduces customer freight cost. Enhances budgeting capitability.

Page 49: IT for Production & Manufacturing

Constraints of DRP

Inventory planning systems require accurate and coordinated forecasts for each distribution center.

Integrated planning is subject to system nervousness and frequent rescheduling, because of production breakdowns and delivery delays.

DRP is not the universal solution for inventory management.

Page 50: IT for Production & Manufacturing

Distribution Resource planning(DRP-II)

Page 51: IT for Production & Manufacturing

Distribution Resource planning

Distribution resource planning [DRP II] is an extension of DRP I.Distribution resource planning applies the time phased logic of DRP I to replenish inventories in multi echelon warehousing systems.Distribution resources planning extends DRP I to include the planning of key resources in a distribution system – warehouse space, equipments, labors, transport capacity [e.g trucks,rail cars] and financial flows

Page 52: IT for Production & Manufacturing

Objectives Of DRP II

The objective of Distribution Resource Planning are, To improve customer service levels by anticipating customer

demand at distribution centers and providing finished products at the correct location when customer needs arise.

To provide an accurate requirements plan for manufacturing. To optimize the distribution of available stock in the distribution

network using the deployment function.

Page 53: IT for Production & Manufacturing

DRP II Provides a framework

Distribution resource planning provides a framework for determining the need to replenish inventory by:

Linking market requirements with manufacturing and demand management.

Relating current inventory positions and demand forecasts to production scheduling.

Matching material supply to manufacturing demand, and customer demand to product supply.

Page 54: IT for Production & Manufacturing

Factors needed for Implementing DRP II

Before the use of DRP for planning and deployment, we must set up a distribution network. A distribution network represents possible delivery relationships between the supplying plants and the distribution centers. DRP entails planning the supply chain from sales planning through delivery to the distribution centers, assuming there are sales orders or that sales forecasts are available. The primary aim of planning is to determine the quantities required on specific dates,including the lead times of the distribution lanes. The distribution network defines the normal supply method for execution.

Page 55: IT for Production & Manufacturing

CUSTOMERS

DISTRIBUTION CENTER

DISTRIBUTION CENTER

DISTRIBUTION CENTER

DISTRIBUTION CENTER

REGIONALWAREHOUSE

DISTRIBUTION CENTER

DISTRIBUTION CENTER

REGIONAL WAREHOUSE

PLANT WAREHOUSE

FINAL ASSMEBLY(MANUFACTURING)

SUB ASSEMBLY B SUB ASSEMBLY C SUB ASSEMBLY D

SUB ASSEMBLY A PART C PART D PART E

PART A PART B

RAW MATERIALS

Page 56: IT for Production & Manufacturing

Difference between DRP and MRP   MRP DRP

Scope Inbound logistics Outbound logistics

Guiding factor Guided by production schedules

Guided by customer demand

Control of the firm Under control of the firm

Not under control of the firm

Demand situation Operates in dependant demand situation

Operates in independent demand situation

Area of operation & coordination

Coordinates scheduling & integration of materials into finished goods

Coordinates demand between outlets & supply sources

Stage of functioning Controls inventory until manufacturing & assembly is complete

Controls inventory after manufacturing & assembly of finished goods

Planning availability of stock at?

Market[retailers] & warehouses

Raw materials stores,conversion process & finished goods store

Page 57: IT for Production & Manufacturing