5
Proposed Concealed Installation and New Ingress Point Location Fiber To The Home Installation Proposal Fiber To The Home Installation Proposal Fiber To The Home Installation Proposal Fiber To The Home Installation Proposal For For For For Santuary Santuary Santuary Santuary Green (191 Green (191 Green (191 Green (191 Tanjong Tanjong Tanjong Tanjong Rhu Rhu Rhu Rhu Road) Road) Road) Road)

OpenNet to the Home

Embed Size (px)

DESCRIPTION

Presentation shared by OpenNet to residents of Sanctuary Green about how the new fire broadband will be installed to apartments.

Citation preview

Page 1: OpenNet to the Home

Proposed Concealed Installation and

New Ingress Point Location

Fiber To The Home Installation ProposalFiber To The Home Installation ProposalFiber To The Home Installation ProposalFiber To The Home Installation ProposalFor For For For SantuarySantuarySantuarySantuary Green (191 Green (191 Green (191 Green (191 TanjongTanjongTanjongTanjong RhuRhuRhuRhu Road)Road)Road)Road)

Page 2: OpenNet to the Home

2

2) Trunking installation Methods

Once the optical fibre reaches the resident’s Unit from the outside, these are the following methods to choose for installing to the Ingress point.

(a) Existing Trunking/conduit or

(b) New Trunking (supplied by OpenNet) along Cornice/Ceiling

New trunking of about 1 inch in width

Page 3: OpenNet to the Home

OpenNet FTTH installation Proposal

Proposed new ingress point above false ceiling

Proposed cable routing with flexible conduit above false ceiling

(Conceal)

Riser

From riser

From riser

Proposed

Ceiling

OpeningProposed

Ceiling

Opening

Unit 1 Unit 2

300mm

300mm

300mm

300mm

Page 4: OpenNet to the Home

OpenNet FTTH installation Proposal

Proposed cable routing with flexible conduit above false ceiling

(Conceal)

Proposed

Ceiling

Opening

From riser

300mm

300mm

Page 5: OpenNet to the Home

OpenNet FTTH installation Proposal

Proposed new ingress point above false ceiling

Proposed cable routing with flexible conduit above false ceiling

(Conceal)

From riser

Proposed

Ceiling

Opening

From riserFrom riser

Proposed

Ceiling

OpeningProposed

Ceiling

Opening

300mm

300mm

300mm

300mm

300mm

300mm

Unit 4Unit 3