OUTLINE OF PRESENTATION
I. Purpose of Access Audits
II. Key Considerations
III. Doing the Access Audit
Access Audits by Arch. Armand Michael R. Eustaquio
III. Doing the Access Audit
I. PURPOSE OF ACCESS AUDITS
1. To Determine How Accessible aBuilding is in Terms of Access& Ease of Use by a Wide Rangeof Potential Users:
���� Persons with Disabilities
Access Audits by Arch. Armand Michael R. Eustaquio
���� Persons with Disabilities
���� Elderly Persons
���� Pregnant Women
���� Mothers w/ Baby Strollers
���� People with Luggage
Source: Asia Pacific Development Center on Disability
2. To Identify Areas for
Improvement
3. To Monitor the Progress of
I. PURPOSE OF ACCESS AUDITS
Access Audits by Arch. Armand Michael R. Eustaquio
3. To Monitor the Progress of
Compliance with BP 344
Source: Asia Pacific Development Center on Disability
1. The Built Environment Outside
& Around the Building
2. Furniture & Equipment
3. Fixtures & Fittings
II. KEY CONSIDERATIONS
Access Audits by Arch. Armand Michael R. Eustaquio
3. Fixtures & Fittings
4. How the Building is Used &
Managed
Source: Asia Pacific Development Center on Disability
A. Composition of the Team
People involved in the Design,
Construction, Management, & Use
of a Building
���� Architects
III. DOING THE ACCESS AUDIT
Access Audits by Arch. Armand Michael R. Eustaquio
���� Architects
���� Interior Designers
���� Engineers
���� Building & Facilities Managers
���� Local Access Groups/Persons
with DisabilitiesSource: Asia Pacific Development Center on Disability
Responsibilities of each team member���� TEAM LEADER���� MEASURER: Take Measurements���� RECORDER: Record Measurements,
III. DOING THE ACCESS AUDIT
A. Composition of the Team
Access Audits by Arch. Armand Michael R. Eustaquio
���� RECORDER: Record Measurements, Make Sketches or Drawings
���� REPORTER: Report Findings���� PHOTOGRAPHER: Take Photos
Source: Asia Pacific Development Center on Disability
Preparation
� Approval from Bldg. Owner/Admin.
� Checklist (BP 344)
B. Preparing for the Access Audit
III. DOING THE ACCESS AUDIT
Access Audits by Arch. Armand Michael R. Eustaquio
� Floor Plan(s)
� Measuring tape (at least 2-meters long)
� Knowledge of the building and its use
Source: Asia Pacific Development Center on Disability
1. Information Gathering
1.1 Attention to Detail
1.2 Meticulous Observing and Recording
C. Conducting the Access Audit
III. DOING THE ACCESS AUDIT
Access Audits by Arch. Armand Michael R. Eustaquio
and Recording
Source: Asia Pacific Development Center on Disability
General Sequence
a. Approaching the building
b. Entering the building
c. Moving inside and around
C. Conducting the Access Audit
III. DOING THE ACCESS AUDIT
Access Audits by Arch. Armand Michael R. Eustaquio
and using its facilities
d. Getting out of the
building
e. Building Management
Source: Asia Pacific Development Center on Disability
2. Results & Recommendations
2.1 Prioritize Areas for
Improvement
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
Access Audits by Arch. Armand Michael R. Eustaquio
Improvement
2.2 Collaborative not
Adversarial
3. Follow-up & Monitoring for Action
Source: Asia Pacific Development Center on Disability
1. Approaching the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
1.1 Ramps
Access Audits by Arch. Armand Michael R. Eustaquio
1
121:121:12
REMINDER: Measure Horizontal Distance
NOT the diagonal distance
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
1.1 Ramps1. Approaching the Building
Access Audits by Arch. Armand Michael R. Eustaquio
1. Approaching the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
1.1 Ramps
Access Audits by Arch. Armand Michael R. Eustaquio
1. Approaching the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
1.1 Ramps
Access Audits by Arch. Armand Michael R. Eustaquio
Source: Batas Pambansa Bilang 344 and its Implementing Rules & Regulations
1. Approaching the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
1.1 Ramps
Access Audits by Arch. Armand Michael R. Eustaquio
1
12
?
1. Approaching the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
1.1 Ramps
Access Audits by Arch. Armand Michael R. Eustaquio
Source: Batas Pambansa Bilang 344 and its Implementing Rules & Regulations
1:12?
?
Access Audits by Arch. Armand Michael R. Eustaquio
1. Approaching the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
1.1 Ramps
Access Audits by Arch. Armand Michael R. Eustaquio
1. Approaching the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
1.1 Ramps
Access Audits by Arch. Armand Michael R. Eustaquio Source: Americans with Disabilities Act
1. Approaching the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
Access Audits by Arch. Armand Michael R. Eustaquio Source: Batas Pambansa Bilang 344 and its Implementing Rules & Regulations
1. Approaching the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
1.2 Signage
Access Audits by Arch. Armand Michael R. Eustaquio
Source: Batas Pambansa Bilang 344 and its Implementing Rules & Regulations
1. Approaching the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
1.3 Parking 3.70 meters
Minimum Width
of Parking Slot
Access Audits by Arch. Armand Michael R. Eustaquio
Source: Batas Pambansa Bilang 344 and its Implementing Rules & Regulations
Signage using
Universal Symbol
of Access
1. Approaching the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
1.4 Non-Skid Surfaces
Access Audits by Arch. Armand Michael R. Eustaquio
1. Approaching the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
1.4 Non-Skid Surfaces
Access Audits by Arch. Armand Michael R. Eustaquio
2. Entering the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
Handrails on
Both Sides
6 Meters
Maximum
Run
1.50 Meter
2.1 Ramps
Access Audits by Arch. Armand Michael R. Eustaquio
1.50 Meter
Landing every 6 meter
run,
Source: Batas Pambansa Bilang 344 and its Implementing Rules & Regulations
1:12 Maximum
Slope(can be 1:14, 1:16)
2. Entering the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
2.1 Ramps
Access Audits by Arch. Armand Michael R. Eustaquio
2. Entering the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
2.1 Ramps
Access Audits by Arch. Armand Michael R. Eustaquio
Source: Batas Pambansa Bilang 344 and its Implementing Rules & Regulations
0.90
Mts.
0.70
Mts.
2. Entering the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
2.2 Signage
Access Audits by Arch. Armand Michael R. Eustaquio
Source: Batas Pambansa Bilang 344 and its Implementing Rules & Regulations
2. Entering the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
2.2 Signage
Access Audits by Arch. Armand Michael R. Eustaquio
2. Entering the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
2.2 Signage
Access Audits by Arch. Armand Michael R. Eustaquio
2. Entering the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
2.2 Signage
�“United Nations” Blue
Background Color
Access Audits by Arch. Armand Michael R. Eustaquio
Source: Batas Pambansa Bilang 344 and its Implementing Rules & Regulations
Background Color
����White Graphics
1. Approaching the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
1.2 Signage
Access Audits by Arch. Armand Michael R. Eustaquio
2. Results &
Recommendations
2.1 Prioritize Areas for
Improvement
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
Access Audits by Arch. Armand Michael R. Eustaquio
Improvement
2.2 Collaborative not
Adversarial
Source: Asia Pacific Development Center on Disability
3. Follow-up & Monitoring for
Action
a. Commitment to make
Changes
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
Access Audits by Arch. Armand Michael R. Eustaquio
Changes
b. Time Table for Compliance
c. Schedule the Next Access
Audit/Follow-up Access
Audit
Source: Asia Pacific Development Center on Disability
3. Moving Inside the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
3.1 Lavatories
0.60-0.70M
(Min Clr.)
Access Audits by Arch. Armand Michael R. Eustaquio
(Min Clr.)
Source: Batas Pambansa Bilang 344 and its Implementing Rules & RegulationsAccess Audits by Arch. Armand Michael R. Eustaquio
3. Moving Inside the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
3.1 Lavatories
Access Audits by Arch. Armand Michael R. Eustaquio
3. Moving Inside the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
3.2 Toilets
Access Audits by Arch. Armand Michael R. Eustaquio
Source: Batas Pambansa Bilang 344 and its Implementing Rules & Regulations
3. Moving Inside the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
3.2 Toilets
Access Audits by Arch. Armand Michael R. Eustaquio
3. Moving Inside the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
3.3 Urinals
Access Audits by Arch. Armand Michael R. Eustaquio
Source: Batas Pambansa Bilang 344 and its Implementing Rules & RegulationsAccess Audits by Arch. Armand Michael R. Eustaquio
3. Moving Inside the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
Access Audits by Arch. Armand Michael R. Eustaquio Source: American Association of Retired Persons
3. Moving Inside the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
3.4 Non-Skid Surfaces
Access Audits by Arch. Armand Michael R. Eustaquio
Source: Batas Pambansa Bilang 344 and its Implementing Rules & Regulations
4. Getting Out of the Building
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
Access Audits by Arch. Armand Michael R. Eustaquio
5. Building Management
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
Access Audits by Arch. Armand Michael R. Eustaquio
Access Audit Exercise #4
Access Audits by Arch. Armand Michael R. Eustaquio
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
6. Other Considerations
Access Audits by Arch. Armand Michael R. Eustaquio
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
2.00 Meters Clear
6. Other Considerations
Access Audits by Arch. Armand Michael R. Eustaquio
2.00 Meters Clear
6. Other Considerations
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
Access Audits by Arch. Armand Michael R. Eustaquio
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
6. Other Considerations
Access Audits by Arch. Armand Michael R. Eustaquio
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
6. Other Considerations
Access Audits by Arch. Armand Michael R. Eustaquio
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
6. Other Considerations
Access Audits by Arch. Armand Michael R. Eustaquio
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
6. Other Considerations
Access Audits by Arch. Armand Michael R. Eustaquio
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
6. Other Considerations
Access Audits by Arch. Armand Michael R. Eustaquio
Source: Asia Pacific Development Center on Disability (APCD)
III. DOING THE ACCESS AUDITC. Conducting the Access Audit
6. Other Considerations
Access Audits by Arch. Armand Michael R. Eustaquio
Source: Avila-Kono, Adela: Universal Barrier Free Design
Committee on Accessibility
United Architects of the Philippines
Arch. Jaime G. Silva, fuap
Chairman
Tel No. (02) 889-8861
E-Mail: [email protected]
Access Audits by Arch. Armand Michael R. Eustaquio
E-Mail: [email protected]
Arch. Armand Michael R. Eustaquio,uap
Deputy Chairman
Mobile: 0922-888-7873; 0919-640-9746
e-Mail: [email protected]