SE is rapidly growing consultancy, specialized in Geotechnology (pile & foundation) and Value Engineering. SE holds over 90 international patents regarding construction methods and recently SE’s SAP method recently certified NET (New Excellent Technology) by Ministry of Land, Infrastructure and Transport of Korea, and it's now the only finalist as construction area technology in ‘Korea Technology Awards’ by Ministry of Knowledge & Economy 2013. As I take the responsibility of new market development, I am looking for partnership with global engineering & construction industry leaders for below patented methodologies. - EXT pile method : Extended endpoint pile which significantly improve performance of PHC pile (Pretensioned spun High-strength Concrete pile) - SAP pile method : Multi-purpose small diameter pile which is suitable for urban redevelopment and building reinforcement ('NET' certified) - GCB methods : Eco-friendly & multi-purpose structure repair / reinforcement material & its application - PF (Point Foundation) method : A perfect soft soil solution for buildings construction which optimize cost & bearing capacity

Citation preview

Page 1: SE corporate brochure

Foundation and Soil Technology Expert for Architecture, Civil and Industrial Plant Construction

14F, GBC, 165, Gasan Digital 1Ro, Geumcheon Gu, Seoul, 153-803, South KoreaTel. +82-2-6326-5571~3Fax. +82-2-6326-5570Website. www.extpile.com

Page 2: SE corporate brochure

Contents

CEO Message

Vision & Core Value

SE History

Business Overview

Research & Development

Value Creation

Eco-Friendly Green Business

Consulting System

Ext Pile Introduction and Construction Achievements

SAP Introduction and Construction Achievements

P.F. Method Introduction and Construction Achievements

GCB Introduction and Construction Achievements

04

06

08

10

12

14

16

18

22

26

30

34

Page 3: SE corporate brochure

CEO Message

We’re living in the era of speed. The speed of environmental change and technology innovation is remarkable. When everything changes constantly, we need to pay more attention to core values of our society such as dignity of human rights, improving quality of life, love and trust of family, friendship, healthy society, and environment preservation. Core values in construction world are very clear: Cost reduction, improving construction quality, shortening project period, and improving productivities. At SE, we believe these values are shaping the business objective and defining the character of our company.

SE is an expert soil and foundation technology company specialized in design and consulting for all types of ground condition for buildings and structures. Since we developed cost effective Ext Pile in 2004, our R&D team has committed itself to develop state of the art pile technology and foundation design methods which guarantee cost savings and shorten construction period. SE’s innovative technology and engineering capability, together with the consulting services leveraging extensive field experience of various soil conditions, allow us to provide our clients with top-notched VE techniques which contribute to reduce project costs and give a positive impact on construction schedules.

We believe that development and environment protection are two sides of the same coin. As constructions engineer, we change the world by enhancing challenging environmental conditions, and as a global citizen, we always try to minimize the potential impact that our ground/soil technology could have on the environment.

At SE, we believe that R&D is the most important to distinguish ourselves in this industry. Our never-ending efforts in R&D were rewarded by awards from Korea government and compliments from major construction companies. We’re proud that we already registered over 100 intellectual properties, including patents and utility models, in Korea and other countries.

SE manages to keep one step ahead of our revolutionary technology by constantly predicting future construction industry needs. We believe only the best quality solutions and service will guarantee our success. With the best in breed technology, we would like to enjoy continous growth with our precious clients.

CEO Song, Gi Yong

SE keeps striding to develop innovative soil & foundation technology

05

04

Page 4: SE corporate brochure

SE researches ground, the earth’s skin. We want to keep the skin beautifully by minimizing environmental impact and maximizing productivitySE is passionate to develop and improve construction technologies and methods which work beautifully with the ground, the earth’s skin.

As a company based in Korea, a relatively small country, we could equip ourselves by dealing with tough ground and construction conditions. By taking up challenges with enthusiasm, we could accomplish more than what we can imagine. Our efforts converged into revolutionary solutions. We provide a comprehensive range of geotechnical engineering solutions: easy & fast foundation methods for soft soil, jobsite with limited access and building construction nearby railway facilities.

SE‘s construction methods, such as Ext Pile, SAP, PF, GCB/Bindearth, are realizing the concept of ‘The less the better.’ Our R&D team put priority on reducing the number of piles, the size of pile diameter and equip-ment, and construction noise. Also we try to shorten project time and cut total construction cost. In the meantime, by deploying our methods into construction site, our clients could enjoy maximized productivity, enhanced durability and eco-friendly construction delivery. Never ceasing in the research and development of new technology, SE reinforces leadership in the areas of geotechnical engineering. We’re growing with our clients as a trusted partner by adding value to every project we involve.

Vision & Core Value

SE History

Business Overview

Research & Development

Value Creation

Eco-Friendly Green Business

Consulting System

07

06

Let’s make the earth’s skin

Dedicate to

the Society through

Value-added Technology

Management Objectiv

e

Motto of SE

Value Focused Management

‘Practice’

Add Great Value to People and Environment

Core Values

Vision

SE P

eopl

e

No. 1 Geotech Consulting

Company

Expand Our Capabilit

ies

to Global Market

Fulfill the Appointment

Honest and Faithfull Attitude

Pioneer of the Future

Peop

le w

ith T

rust

Te

am P

laye

rs

Wis

dom

than

Kno

wle

dge

Page 5: SE corporate brochure

0808

09

2011

2010

2009

2004 ~ 2007

2012 2013

2014

Ext-ST1 development (Site welding type)

GCB

SAP

EXT

P.F.

tudy:Industry-University Cooperative st• Hyundai Development• Halla E&C• Korea University• Sungkyunkwan University

Ext-R development(High capacity–factory fabrication type)

Ext-S development(Bolt connection type)

SAP development (Early stage model)

G-Star development(Soil solidification agent)

Obtained GCB Patent(Geo Ceramic Mat method)

Geo Ceramic Shot method development

PF method equipment development

PF (Point Foundation) method development

SAP Pile development(Tension type)

Hyper strength extension pile development HD-Pile (hammer driven type)

Compact equipment development

SAP Pile development(Compression type)

Binders development

Vision & Core Value

SE History

Business Overview

Research & Development

Value Creation

Eco-Friendly Green Business

Consulting System

2013 New Excellent Technology (NET) certificate from Ministry of Land, Infrastructure and Transport of Korea.

2012 Korean Structural Engineer’s Association Technology Certification : SAP Construction Method

2011 Governor Prize from Jeju Province, Korea, on Water Management Symposium

2010 Technology Innovation Prize on Water Industry Future Vision Forum

2009 Korean Structural Engineer’s Association Technology Certification : Ext-PHC Pile Method

2009 Prime minister’s award, Korea SME technology innovation awards

2008 Minister Prize from Korea Ministry of Knowledge Economy on Patented Technology Transfer Success Case Exhibition

2008 Grand Prize in Korean Construction Technology Award

2007 Construction Productivity Improvement Certificate

2007 Korea Construction Technology Award from The Korea Land Daily

2006 Special Prize in Korea Construction Culture Award from Korean Housing Corporation

2006 Premium Technology Award, World Premium Brand Awards from The Korea Economic Daily

2005 Quality Management Award from Hyundai Engineering & Construction

Through sheer creativity and dedicated practice, SE is growing to a pioneer of the futureSince established in 2004, SE created success stories through continuous R&D,problem-solving consultancy and exhaustive construction supervision.Today, as a pioneer of soil & foundation engineering, SE enjoys continuous growth with our clients.

Page 6: SE corporate brochure

11

10Vision & Core Value

SE History

Business Overview

Research & Development

Value Creation

Eco-Friendly Green Business

Consulting System

SE Business Areas

Cost Reduction-Type Extended End Pile

Reduce pile quantity

Reduce project cost

Shorten project period

Reduce construction waist

Prevent civil complaints

Multi-purposeSmall Diameter Pile

Drill and install simultaneously

Used in foundation & slope reinforcement, and earth retaining

Improved compression and tension construction using compact equipment

Eco-friendly Repair, Maintanence& Waterproof

New material for waterproofing, repair and reinforcement

Eco-friendly material

Structure reinforcement and high durability

SE leads geotechnical engineering industrywith revolutionary technologies, best of the breed construction methods and quality consulting services.Every single step of our business, we think of innovation. What we changed and improved today?It’s the golden question to lead SE’s success in competitive environment.

We always try to think out of the box.SE’s revolutionary construction methods and new materials come out of our everyday efforts to improve the way we work.

SE feel proud to provide the best technologies and consulting services to our clients to build win-win partnership.Our qualified engineers, with creative thinking and dedication, make a differentiated result in the construction field.

Soft Ground Improvement, Eco-friendly Solidification Agent

Eco-friendly materials to utilize in-situ soil

Reduce cement amount used

Surface layer improvement, soil bearing capacity foundation and mid-deep layer improvement

Soft Ground Reinforcement Construction Method

Use high-functional and high solidifying materials ’BindEarth’

Significantly reduce slime waste as it’s highly permeable to soil particles

Efficient, economical and eco-friendly construction method

Stabilize arrangement between soil particles, solidification effect

Secure same strength with smaller amount than cement

Page 7: SE corporate brochure

1212

13

Vision & Core Value

SE History

Business Overview

Research & Development

Value Creation

Eco-Friendly Green Business

Consulting System

Production Related Patents

Construction Related Patents

Equipment Related Patents

Design Related Patents

Design Patents

Trade Mark Registration

SE Status ofIntellectual Property Rights

Intellectual properties are key assets of which SE feels proud.

In 2013, the number of SE’s patents and trademarks related to construction methods and new materials, registered in Korea and other countries, reaches over 100 including pending status.

Technology innovation is all about SE’s success.SE is a little giant with international patents of design, construction, new materials and construction equipment.SE puts emphasis on ‘practice’.We challenge our limitation, and are never afraid of a failure.That’s the way we developed new technologies and construction methods, which are essential for our success.

As knowledge based technology firm, SE keeps the efforts to encourage our engineers to challenge existing methodology way and improve our capabilities.With technology excellence, we accomplish sustainable growth with our clients and partners.

SAP (Screw Anchor Pile) is multi-purpose small diameter pileeffective for structural reinforcement for foundation of remodeled building, railway station complex development and decrepit bridge.

The development of SAP method was started in 2009, as an academic-industrial cooperative study with SE, Hyundai Development, Hanra Construction, Korea University and SungKyungKwan University in Korea. This project was completed and applied to the real construction site in 2011.

SAP method got Technology Certificate from Professional Architectural Structure Engineers’ Association in 2012, and registered as a Construction New Technology (Reg. No.684) from Ministry of Land, Infrastructure and Transport of Korea, in 2013.

Construction Technology Certificationand Other Certification Details

Page 8: SE corporate brochure

Earth’s Radius 6,400km

15

14Vision & Core Value

SE History

Business Overview

Research & Development

Value Creation

Eco-Friendly Green Business

Consulting System

SE’s representative product, Ext Pile, has accumulated a total of 8,000Km construction deployment over the past 10 years. This length equals to reaching the summit of Mt. Everest around 1,000 times, and it’s longer than earth’s radius.

Total Length of Piling

Construction Cost Reduction

Total $300 Mil

Year

0.02 2.1 7.2

29.1

43.3

20.4

47.7

27.3

46.0

60.0

* Cost reduction and shortening project time are key drivers for construction company’s success.

Ext Pile reduces the number of pile over 30% comparing to legacy pile solutions.

Reduced number of piles directly affects to cost reduction, project schedule shortening and eco-friendly construction.

Moreover this pile system gets the positive feedback with increased construction feasibility and durability.

Shortened Project Period

Total 30 Year

Year

1

145

575 754

1,694

2,013

1,228

2,070 2,000

615

Total Length of piling

8,000km

Year

Million Dollar

Construction cost saving reaches USD 300,000,000.Work time has been reduced around 30 years.SE’s extended end pile (Ext Pile) kills two birds with one stone by reducing construction costs and shortening project time.

This construction method has received positive feedback from engineers in many construction sites in Korea and global fields. With extended endpoint, bearing capacity is maximized. Meaning, you can complete piling work with reduced number of piles and expect same strength.

With this method, you can save not only pile cost, but also labor cost. Another benefit of deploying Ext Pile is shortening project time. In the last 10 years, Ext Pile contributed to reduce project time over 30 years in total.

SE feels proud that our technology innovation directly translated into our client’s benefit.

Page 9: SE corporate brochure

16

17

Vision & Core Value

SE History

Business Overview

Research & Development

Value Creation

Eco-Friendly Green Business

Consulting System

Over 10 years, SE devoted to reduce 430,000 tons of CO2,same effect to plant around 150,000 treesThere is ongoing global concern of reducing greenhouse gas emission such as CO2.Eco-friendly management is not only our responsibility as a global citizen but also the key drivers for sustainable growth. As an expert in soil improvement and foundation engineering technology,we feel proud that every single step of our technology innovation and improvement in construction method contributed to minimize environmental impact.

For us, eco-friendly technology means construction completion with less material and smaller equipment within relatively short time.

At SE, we strive for developing new and more effective solutions for “greener” construction support.

One tree absorbs 3kg of CO2 according to the environment reports. We reduced 430,000 tons of CO2 emission in our construction projects over 10 years, equivalent to the effect of 150,000 trees being planted.

This is accomplished by SE’s innovative construction methods designed to reduce number of piles necessary for construction and shorten project time. Project could be done with smaller equipment. All of these elements are affecting to not only cost saving but also keep earth green.

Page 10: SE corporate brochure

19

18Vision & Core Value

SE History

Business Overview

Research & Development

Value Creation

Eco-Friendly Green Business

Consulting System

Design-Stage Service

Operation Flow Construction Company/ Design Company

Customer Needs Design Documents Delivery Concept Setting

• Foundation review• Workability review

• SE methods & other methods

• Bearing-capacity review• Foundation RC design• Pile spacing and arrangement

Geotechnical Analysis

Construction Method Review

Preliminary Design

Construction Cost Analysis

Optimum Foundation Selection

• Consideration of project economics and workability

• Cost reduction proposal• Bearing-capacity report• Structural calculation report

Optimum Construction Method Selection

Construction MethodSuggestion

Construction Method Consultation

Detailed Foundation Design

Improvement ReviewValue Engineering

SE provides one-stop service from

design proposal to onsite

consultation. Talented engineers

specialized in ground engineering,

structure and value engineering will

provide systematic and efficient

service.

• Ground investigation• Structural investigation

• Quality check. • Technical support

• Government-related business• Problem solving

Inspection Team

Contractor

SubContractors

At SE, professional engineers in soil, foundation, structure and value engineering work together to deliver best solutions for challenging subsurface conditions.SE is dedicated engineering firm focusing on soil and foundation technology. Because 80% of our employees are specialists in technology and research,a diverse array of revolutionary solutions can be offered.

Our team of experts always try to deliver optimum suites of construction methods and materials with sophisticated consultancy in foundation review, optimum piling type and construction method selection, bearing capacity review and pile spacing and arrangement.

From the initial proposal to the onsite consulting, you’ll be covered with our extensive field experience, professional expertise and enthusiasm.

Site Management and Support

Page 11: SE corporate brochure

20

21

Main Business AreaExt Pile Ⅰ SAP Ⅰ P.F. Ⅰ GCB

Page 12: SE corporate brochure

Construction Method Concept

Approximately 60% of the pile’s strength is being used

in the design bearing capacity, and the rest is simply residing

in the ground

(i.e.) PHC Pile D500

Pile strength(173t : 100%)

Design Bearing Capacity

(110t : 63.5%)

Ground bearing power is needed to increased

to reduce waste element of pile strength

Both end pointbearing capacity and

pile strength of increased

Ext-R

End point bearing capacity increased

Ext-S

EndpointExtension

EndpointExtension

+ Thickness(cylinder)Increased

Selecting efficient way to reclaimbearing powerwasted inside

of the land

Q : Structure loadA : Strength of the pileB : Construction bearing capacity (qu,b + qu,s)

Bell-type In-Situ pile Steel Frame Base Plate

Basic Pile Ext Pile Ideal Pile

A >> B > Q A > B > Q A = B > Q

1) Pile Quantity Reduction Principle Fp = A x σ Fp : Allowable bearing capacity, A : Pile endpoint area, σ : Bearing capacity of ground

2) RC amount Reduction Principle a) Isolated foundation case b) Wall foundation case

Existing Pile Ext Pile

Extended end plate

Ext PileExisting Pile

Site Management and Support

22

23

Ext Pile

SAP

P.F.

GCB

Ext Pile Ext Pile is a new generation extended end pile system. With extended endpoint, Ext Pile maximizes end bearing capacity

and reduces waste elements of pile strength.This way, Ext Pile contributes to reduce the cost and project time.

Quality Management Activity

ClassificationDelivery of

product Non-residential

support Residential

support

Consulting Plan (Ground Analysis / Construction Method Decision) ▵ ◦ ◦

Setting of Quality Management Standard ◦ ◦ ◦

Consulting Report (CR) During Project Period × × ◦

Structure Engineering Support and Certified Engineer’s consultation (when needed) × ◦ ◦

Construction Completion Status Report × ◦ ◦

Additional Cost Reduction Measure Review & Recommendation × × ◦

Inspector / Government Related Support (Regarding Piling Work) × ◦ ◦

Quality Management Cost × ▵ ◦

Pile Specialist‘s Onsite Support and Quality Management × Non-residential support

Residential support

※ If the 3rd option. (product with residential support) is the option chosen, additional cost reduction review will be performed including piling work and bulk cement amount..

SE’s Ext Pile is available in three types:

1. Product (end plate) only, 2. Product with non-residential site support or 3. Product with residential support.

Clients may choose their preferred option.

Product Performance

ClassificationExisting Pile (General PHC) Alteration (Ext-S Pile) Bearing Capacity

IncreasedDesigned Bearing Capacity (kN/ea) Designed Bearing Capacity (kN/ea)

Applicable Method

Hammer Driven Method,Pre-boring & Light Hammering Pre-boring & Light Hammering Method

D400 600 ~ 800 950 ~ 1,050 42%↑

D450 800 ~ 1,000 1,150 ~ 1,300 33%↑

D500 1,000 ~ 1,200 1,500 ~ 1,650 45%↑

D600 1,400 ~ 1,600 2,000 ~ 2,100 40%↑

Ext-S Pile

Classification

Existing Pile (General PHC) Alteration (Ext-R Pile)Bearing Capacity

IncreaseThickness(mm)

Concrete Cross-

sectional Area (cm2)

Allowable Axial

Load(kN)

DesignBearing Capacity (kN/ea)

Thickness(mm)

Concrete Cross-

sectional Area (cm2)

Allowable Axial

Load(kN)

DesignBearing Capacity

(kN/ea)

ApplicationConstruction

Method

Type Construction Method,Pre-boring &

Light Construction Method

Pre-boring &Light Construction Method

D500 80 1,056.0 1,730 1,000 ~1,200 100 1,256.4 2,012 1,700 ~ 1,900 63.6%↑

D600 90 1,442.0 2,360 1,400 ~1,600 110 1,693.3 2,719 2,400 ~ 2,600 66.6%↑

Ext-R Pile

Page 13: SE corporate brochure

Ext Pile

Target Market Construction Achievement

24

25

Ext Pile

SAP

P.F.

GCB

High–Rise Building Bridge Over Land

Residential-Commercial Complex

Industrial Plants

Large Diameter Pile

Steel Pipe Pile In-Situ Pile

General PHC Pile

As an Alternative

Method

ConstructionField

Doosan We’ve apartment complex, Pohang city, Korea Prujio apartment complex, Incheon city, Korea

•Contractor: Daewoo E&C •Construction volume: 4,141 units / 135,000m

•Project detail: Ext-R Method as an alternative of RCD

•Cost savings: USD 5.7 million

•Reduced project time: 28 days

I`PARK apartment, Masan city, Korea

•Contractor: Hyundai Development Company

•Construction volume: 3,848 units / 151,878m

•Project description: coastal border area

•Cost savings: USD 2.9 million

•Reduced project time: 41 days

Hoban Berdium apartment complex, Busan city, Korea

•Contractor: Hoban construction

•Construction volume: 2,201 units / 123,256m

•Project description: foreshore reclamation area

•Material used: HD Pile

•Cost savings: USD 2.4 million

•Reduced project times: 36 days

Samsung electronics material search complex, Suwon, Korea

•Contractor: Samsung C&T

•Construction volume: 5,607 units / 100,055m

•Project detail: Large compex

•Cost savings: USD 0.7 million

•Reduced project time: 20 days

•Contractor: Doosan E&C

•Construction volume: 5,793 units / 98,807m

•Project detail: Mudstone Stratum (Alternative to RCD)•Cost savings: USD18 million

•Reduced project times: 66 days

•Contractor: Hyundai engineering & construction •Construction volume: 7,727 units / 151,615m

•Project detail: Large residential complex

•Cost savings: USD 2.2 million

•Reduced project time: 34 days

Hill State apartment, Gwang-kyo, Suwon city, Korea

Dome-shaped baseball park, Seoul, Korea

•Contractor: Seoul metropoilitan city

•Construction volume: 1,183 units / 26,878m

•Cost savings: USD 0.4 million

•Reduced project time: 36 days

Multifunctional administrative city, Sejong city, Korea

•Contractor: Ministry of security & public administration

•Construction volume: 932 units / 16,600m

•Cost savings: USD 0.4 million

•Reduced project time: 22 days

Page 14: SE corporate brochure

SAP

Piling Equipment and Procedure

26

27

26Ext Pile

SAP

P.F.

GCB

Compact Equipment

Equipment for Narrow-Space

- Dimension: 0.8 x 3.1 x 2.3m- Weight: 2.7tons- Construction Length: 1.0~2.0m/unit

Compact Equipment / Remote ControlPiling work is possible anywhere!

SE-SAP MR13

SAP, screw anchor pile, is a revolutionary construction method.With this multipurpose small-diameter pile,

installing and drilling job could be done simultaneously. This method is especially effective for foundation construction in narrow space;

railway station complex building and building remodeling in the city.

Construction Method Concept

Grouting

Screw

Soil

Non-displacementpenetration Grouting Insertion

Grouting

End Bit for drilling

Grouting Injection Hole

Screw(SS400)

High-Strength Steel Pip (API5CT/Φ73,9.5t)

Free section(without friction )

End section

Bonding section(with friction)

D

2D

• Concept : ‘Boring rod = Pile’ → 2X faster piling work than competing method

•Compact equipment → Narrow-space construction available

•Determination of screw length (bonding section) according to ground condition → Economical and optimal design available

Pile Materials and Performance

Screw

High-Strength Steel Pipe

Screw-Tab connection

Reinforced connection(Anti-buckling)

Grade Yield load (MPa)

Tensile load

(MPa)

External diameter

(mm)

Thick-ness(mm)

Cross Section

Area (cm2)

AlloableLoad of

material(kN/ea)

N80 552 689 73 11 21.42 705.3

P110 758 862 73 9.5 18.95 856.6

P110 758 862 73 11 21.42 968.5

• High-strength material (API5CT) certified by American Petroleum Institute

• Production in 1~3m unit depending on the work space condition

• Delivery to the site after factory production

• Use of existing crawler drill is available. In case of narrow spaces, we recommend to use compact size equipment which SE developed.

• Working Space: Narrow space with 0.8~1.0m width, minimum height 2.3m ⇒ Enables piling in the most narrow working space.

Air (water) boring

Underground work: 1m -2m unit pilingAbove ground work: 3m unit piling Screw-tab connection

Pile Installation (Hydraulic rotary drilling)1

Water-cement ratio (W/C): Less than 65%7-day strength: 12Mpa28-day strength: 25Mpa

Overflow check

Injection through SAP

Grouting

Grouting (Injection through pile with stirring)2

Plate: cap-type, rib-type Welding at site

Plate

Pile Cutting Work (welding followed)3

Construction Procedure• After hydraulic rotary drilling (no vibration, no noise), grouting work (through steel pipe) is followed ⇒ Simultaneous drilling and installing

• �Construction Speed: basement (narrow space) 100m/day (1m unit construction), general condition 200m/day (3m unit construction)

Page 15: SE corporate brochure

SAP

Project Construction Order from

Designed Load(tf/ea)

Passage bridge across Goyang Lake (Hosu-ro) Go-yang city, Korea 55

Korea East-West Power’s headquarter construction

Korea East-West Power 50

Chongkundang factory remodeling Chongkundang 40

Double train track guardwall between Seongnam-Yeoju Samsung C&T 60

Jindalrae apartments reconstruction - ancillary facilities Samsung C&T 60

Cheongdamdong I’Park apartments remodeling

Hyundai Development Company 60

Hyundai Motors Namyang research centre construction Hyundai motors 60

Jinju Gyeongsang university hospital construction Daerim industries 60

Incheon Songdo Central Park Hotel reinforcement construction

Daeya industry development 75

Chungju G-Well City construction Doosan construction 60

Passage bridge across Goyang Lake Chung-ju G-Well CityIncheon Songdo Central Park Hotel (Basement floor reinforcement)

Seoul Cheong-dam I’PARK (Basement expansion with floating-structure method)

Basement Extension Case Study (Apartment Remodeling)

28

29

Ext Pile

SAP

P.F.

GCB

SAP Benefits

Noise comparisonSo

und

Mea

sure

men

t Val

ue (d

B(A

))

Measured from 7m distance

Measured from 14m distance

28%Noise

reduction

No crashing noise of hammering with hydraulic rotary drill

Low noise and eco-friendly construction method.

Perfect for Metro area construction - narrow and sensitive to

construction noise.

1) Reference: “Sandy ground boring operation” research, the National Environmental Protection Institute, Korea

Con

stru

ctio

n Pe

riod

(day

s) Speed of Construction

At least 1.6 times faster

Construction period comparison(Basement floor 2.4m, 1m unit piling)

Application Area

SAP construction method to support 19-storey apartment building while excavating the third basement floor space.

Anti-bucklingreinforcement for columnPile connection

with Column

Existing structure (B2F)

Newly extended section(B3F)

Piling under staircase

Piling work in horizontal extension area

Anti-buckling reinforcement forexposed SAP

① Ground floor extension : 19 f ⇒ 20 floors

② Horizontal extension: veranda area

③ Basement extension: 2 ⇒ 3 basement floors

1st Basement Parking

2nd Basement Parking

3rd Basement Parking

•Vertical extension from 2 basement floors to 3 basement floors ⇒ Support upper structure with SAP construction method

•SAP piling in 2nd basement ⇒ 3rd basement excavation ⇒ anti-buckling reinforcement ⇒ concreting 3rd basement

Horizontal ExtensionExistingBuilding

Existing Building

417piles (Average 11.5m) 417 piles (Average 10.0m)417 piles

(Average 10.7m)

ConstructionMethod B

SAP Method

Construction cost comparison(Basement floor height 2.4m, 1m unit piling)

417piles (Average 11.5m) 417 piles (Average 10.0m)417 piles

(Average 10.7m)

ConstructionMethod B

SAP Method

Con

stru

ctio

n C

ost (

1,00

0 U

SD) 122% 133%

22~33%Down100%

Construction Cost

Materials Cost

ConstructionMethod A

ConstructionMethod A

67days

119days

40days

Drillmaster 1) M/P Method SAP Method

Page 16: SE corporate brochure

P.F.

Application for global site

30

31

Ext Pile

SAP

P.F.

GCB

The PF construction method is for medium/high-rise structures in soft soil. With this foundation method,stable bearing capacity is secured.

•Processing Depth : Less than 3m (approx.)•Ground Status : Stable soil (sandy soil) with steady stratum Processing depth is consistent•Equipment : Only back hoe is necessary

•Processing Depth : 3m~8m•Ground Status : Soft Soil (sandy soil,clay, silt, etc.) Stratum and processing depth is irregular•Equipment: Boring by back hoe, specialized stirring rod

•Processing Depth : 8 - 40m•Ground Status : Soft soil (sandy soil, clay, silt, etc.) Stratum and processing depth is irregular•Equipment : Boring equipment, specialized stirring rod

[ PF-M ] Middle Layer [ PF-D ] Deep Layer[ PF-S ] Surface Layer

Application Area

Construction Method & Source Materials

• Advanced, Eco-friendly Construction Method

• Distribution Cost Reduction

• Consideration of Local Conditions

Local procurement in each country

•Secure same strength with smaller amount comparing to existing soil cement

•By exporting source technology and additive only rather than mixed materials, distribution cost is saved

Concept of PF Method

Upper Layer

Lower Layer

(N 5~15)

(N 20~30)

Soft Stratum

Supporting Stratum

Underlying Rock

Uniform Bearing Capacity

PF (Point Foundation) construction method is applied to soft soil which has risks of settlement & liquefaction. By substitution of soft soil, allowable bearing capacity of ground is attained (PF-S method). With our specialized design stirring equipment, bearing capacity is secured by cone part in upper layer, as well as settlement control by tail part in lower layer (PF-M, PF-D)

D 1.0 ~ 2.0m

D 0.3 ~ 1.0m

BD 5000 For GlobalCustomers

(Additive Type)

BD 5000 + Cement total + Soil

(Local Site Procurement)

BD 6000 For Local Customers

(Mixture Type)

BD 6000 + Soil

Customized strength realization through mix design and W/C ratio variation

Bindearth is an eco-friendly high-solidifying admixture. It shows excellent solidification performance for soft soil improvement, point foundation, soil cement wall, and surface layer solidification.Two types of products are available: BD5000 is additive type product for remote customer. It specially designed to reduce distribution cost. BD6000 is provided in mixture type for local customers. Bindearth received Green Mark from Ministry of Environment in Korea, and meets waste processing test standard.

Soil Admixture

Cone

par

tfo

r be

arin

g ca

paci

ty

Tail

part

fo

r se

ttle

men

tco

ntro

l

Page 17: SE corporate brochure

P.F.

Application Area & Construction Achievement

Soil bearing capacity foundation construction

• Ordering rarty: Korea Hydro & nuclear power

• Construction company: Halla construction

• Project description: gravel and boulder layer

• Cost saving: 22.2%

New construction of employee residence for sinwolsong nuclear power station

• Ordering party: Hanil

• Construction company: Tae-sung construction

• Project description: marine clay

• Cost saving: 27%

New construction of Songdo Hanil scientific research centre

• Ordering party: Korea circuit

• Construction company: Yungpoong construction

• Project description: no noise & vibration

• Cost saving: 18.5%

Korea circuit facility extension construction

• Ordering party: Asan city hall

• Construction company: Taeyang construction

• Project description: government-ordered construction

• Cost saving: 40%

New construction of Onyang 6-dong citizen’s centre

Overseas construction projects

• Ordering party: Vietnam Ho Chi Minh city

• Construction company: ENC Plus

• Project description: Soft-soil replacement

• Cost saving: 35%

Ho Chi Minh city waste landfill facilities, Vietnam

• Ordering party: Vietnam Vung Tao city

• Construction company: Alpha Hwasung

• Project description: Soft-soil replacement

• Cost saving: 23%

New construction of Vung Tao waste landfill facilities, Vietnam

Application for waste landfill and retaining wall

• Ordering party: Gunsan city / Ulsan city

• Construction company: Goldenpow

• Project description: marine clay

• Cost saving: 12.0%

New construction of Gunsan / Ulsan waste landfill facilities (waste facilities water repellecy)

• Ordering party: Woomi construction

• Construction company: Woomi construction

• Project description: marine clay

• Cost saving: 18.5%

New construction of Mokpo Okam district Fahrenheit apartment

Surface-Layer Processing Case

32

33

Ext Pile

SAP

P.F.

GCB

Bulb Formation and Surface-Layer ProcessingFoundation Plan Schematic (Bulb + Surface)

Bearing Capacity Check (platy load test)Completed Research Facilities

Cost Down

25%

• Construction of four-story research facilities in soft ground of coastal reclaimed land ⇒ Bearing capacity more than 150kN/m2 is secured

• Heavy equipment access was not possible because of the soft ground (<N5) and temporary facility interference ⇒ Bulb formation and surface-layer substitution applied

Construction outline

Middle-Layer ProcessingBird-eye View

Surface-Layer ProcessingBearing Capacity Check (platy load test)

Cost Down

35%

Mid-deep Processing Case

• Construction of 27 house building on fill-up ground of colluvium )40% of gravel and boulder mixture) ⇒ Bearing capacity more than150kN/m2 was the requirement

• In cas of piling, 35m SDA+T4 construction could be applied ⇒ Mid-layer processing and surface-layer substitution was actually applied

Construction outline

Page 18: SE corporate brochure

GCB 34

35

34Ext Pile

SAP

P.F.

GCB

GCB is eco-friendly material ideal for repair/reinforcement of concrete structure and plant facilities.

Construction Method Concept

GCB is the structure repair, maintenance and waterproof technology to form long lasting unified structure. By utilizing slurry state of Geo Ceramic Binder (GCB + water) with geosynthetic mat or form, it is possible to leverage mechanical characteristics and strengths of geosynthetics - flexibility, and wide range of specific surface area.

About GCB (Geo Ceramic Binder)

Easy

Speed Eco-Friendly

Product Composition

Permeation TypeCeramic Binder

GCB 4000

•High permeability

•Good adhesiveness

•High fluidity

•Shock resistance

•Chemical resistance

Section-Restoration TypeCeramic Mortar

GCB 4400

•Section restoration

•Workability

•High strength

•Durability

Acrylic Emulsion

GCB 4200L

•Coating

•Alkaline recovery

•Waterproof

•Workability

•Durability

High-StrengthCeramic Binder

•High strength

•High bending strength

•Waterproof

•Wear resistance

•Shock resistance

GCB 4200

• Large specific surface area and superior adhesiveness between old and new structures

• High strength, wear resistance and shock resistance

• High workability and superior eco-friendly method

• Wide range of application

• Excellent for structure repairing and reinforcing for public works, buildings, industrial plants and environmental facilities

• Excellent waterproofing capabilities of coating

Construction Method Characteristics

Minimize maintenance cost!

Use eco-friendly materials!

Permeation Type

High- Strength

Cross- Sectional

Restoration Type

Surface Coating

[Geo Ceramic Binder for Eco-friendly Repair Maintenance and Waterproof]

Mat type GCB method with geosynthetics

Geo Ceramic Shot (GCS)

Geo Ceramic Mat (GCM)

• Significantly reduce man-hour and equipment

• No need to dry out the surface.

• Applicable to various types of structure

• Available for narrow space construction

• No detection of toxic substances

• Odorless and non-toxic, possible to work in closed space

Spray-type GCB method withpolyvinyl fiber

Page 19: SE corporate brochure

GCB 36

37

Ext Pile

SAP

P.F.

GCB

Application Area

Public Works Structure

Artificial Sculpture

Rooftop Garden

Industrial Plant Structure

Tunnel Maintenance

Concrete Structure

As Method

•Complex water prevention construction : waste landfill

•Structural facility waterproofing : dam, reservoir, pond, stream, dyke, agriculture and water passage

Waterproofing/Water Prevention

•Public works structure reinforcement : subway, power plant, cable tunnel, drainage facilities, bridge and port facilities

•Building structure reinforcement : concrete structure

•Industrial Plant structure : old pipeline, water & sewage, and cold/hot drainpipe

Structure Reinforcement

•Condensation protection

•Exterior wall finishing : internal plastering work finishing, waterproofing

•Insulation

•Floor shock absorbing finish

Finishing Material

•Integration of exterior finish works

•Leveraging high-adhesion : roof planting, tile/wood works

Eco-friendly Application

As Material

Construction Example

Structure Repair

Structure Repair - Before

Basic structural damage and water leak cracks

Structure Repair - After

GCB-usage for repair and outside waterproofing

③ Coating (GCB4000+GCB4200L) ② Geo Ceramic Mat (GCM)

① Crack Repair and Cross-Section Restoration (GCB4400)

① Surface pre-processing work (removal of cracked part)② Application of Geo Ceramic Binder construction method, cross-sectional restoration and application of permeable alkaline recovery agent

③ Final surface coating

Plant Repair

Pipe repair - Before

Bypass pipe water leak

Pipe repair - After

GCB-usage for non-watercut repair

① Surface pre-processing Work (removal of cracked part)② Application of Geo Ceramic Binder construction method, cross-sectional restoration and application of permeable alkaline recovery agent

③ Final surface coating

① Alkaline Recovery Agent

③ Coating (GCB4000+GCB4200L)

② Geo Ceramic Mat (GCM) Existing Steel Structure

General Construction

Method

Page 20: SE corporate brochure

Value adding technologies for the FutureSE, with the extensive field experience and reputation in Korea, takes a big step to the global market.

We believe that our innovative technology and advanced construction methods will provide effective solutions for challenging construction issues in global field of construction.

With passion and endless innovation,we will expand our technology domain to the world.

We’ll keep the earth’s skin sturdy and beautiful.