PROJECT TITTLE
By:-Gogdfrey Mgaya
PROPOSED FLEXIBLE RESIDENTIAL APARTMENT
BLOCK …D…. ON PLOTS …300… ALONG NEW BAGAMOYO ROAD
DAR ES SALAAM
CLIENT:NATIONAL HOUSING CORPORATIONP O BOX 2977DAR ES SALAAM
Site
- Site Location : Victoria, Dar es Salaam, Tanzania
- Site Area : 2065.475m2
-Charicteristics: The site topography relative flat, currently not developed.
Tanzania
Dar es salaam
SITE
1: SITE MAPS AND LOCA-TIONS
LOCATION
N
SITE LOCATION
Tigo Headquarters Kijiji cha Makumbusho
PEDF tower Millennium Towers
THE SITE IS LOCATED• 759.12m from Tigo Headquarters•. 630.15m from Hubert Kairuki Hospi-tal.•881.86m from Millennium Towers.•1.4km from Airtel Headquarters.•737.5m from Makumbusho•388.86m from PEDF towers.
SITE
N
1: SITE MAPS AND LOCA-TIONS
NEIGBHOURHOOD AND ACCESSIBILITY
Kairuki Hospital
BMTL building/ NBC bank
The site located close to the New Bagamoyo road, Filling station and the road to Hubert Kairuki Hospital, BMTL building/NBC bank. which means the site well accessible and close to services.
Bagamoyo road
ALPA Hotel
2: SITE BOUNDARIES AND REFERENCE POINTS
SITE features
-Existing features on Site -There is a very small vegetable garden on site and a section whereThere are bushes and small sizedtrees along the site boundaries-There are piles of aggregate and a small corn farm.
SITE
3: VEGETATIONS AND PLAN-TATIONS
Fuel filling station
Road against SITE
-Services
The site is surrounded with services
At all sides; Bagamoyo road, Filling
station and the road to Hubert
Kairuki Hospital, NMB bank. which
means the site well accessible and
close to services.
Knight support
Victoria, SITE
4: SERVICES AND INFRA-STRUCTURES
MACRO - CLIMATIC ANALYSIS
SunshineHumidity
Wind speedPrecipitation
Rainy daysTemperature
Water temperature
SE – wind direction
NE – wind direction
CLIMATIC ANALYSIS OF THE SITE
Wind pressure, pat-tern and direction
Sun – path ( east to west)
CLIMATIC ANALYSIS OF THE SITE
Annually sun-path
SITE
KAIRUKI ROAD
BAGAMOYO ROAD
BMTL
EXISTING STRUC-
TURES
APLE HOTEL
Annually sun-path passes on top of the
site from east to west
CLIMATIC ANALYSIS OF THE SITE
Daily sun-path
Daily sun-path passes on top of the site from east to west
SITE
KAIRUKI ROAD
BAGAMOYO ROAD
BMTL
EXISTING STRUC-
TURES
APLE HOTEL
SELECTED DESIGN STRATEGIES Passive solar heating Thermal mass effectsDehumificationNatural ventilation orientation of the building 12.5° from north
Construction materials:
Suggested materials include glass, treated timber, cement
product, Bricks, stones, concrete, Gypsum, Steel
beams, floors, columns should be able to resist fire for
not less than two hour
Floor finishing materials include terrazzo, sand cement
screed, and tiles
DESIGN RECOMMENDA-TIONS
Building layout and orientation on site:
Buildings will be organized to allow a clear air circulation and
natural light to every space. And oriented at an angle of 12.5°
from north
Roofs:
Fire resistant timber or steel trusses to be applied and tiles roof
covering material to control heat gain/lost
Climatic and environmental considerations:
Building elements like doors and windows should be positioned
to the building to encourage natural ventilation.
Also the use of shading device should be employed where
necessary
CASE STUDIES SELECTED CASES
Hints:
Site layout and planning
Spatial planning treatment
Architectural concepts
Room relationships and hierarchy
Building technology and construc-
tion
Finishing materials and usage
Building grouping and arrange-
ments
Building forms and architectural
style.
CASE STUDY
GRIESHOFGASSE, by HELMUT WIMMER
MAISON LOUCHEUR
(1928-9)
VIVA TOWER: Dar-es-salaam
KANCHANJUNGA APARTMENTS: India
CASE STUDY
Address: Grieshofgasse, by Helmut Wimmer
Work Type: new built
Context: urban
Number of Storeys:
5-storey
Type of Building:
tenement / apartment house
Number of Units:
9
Grieshofgasse, Helmut Wimmer, 1996. Typical of an approach that provides a cellular layout with undesignated uses. Extra flexibility is given in this case by the connections across the central hall.
CASE STUDY and prototype design Case 1: GRIESHOFGASSE, by
HELMUT WIMMER
ANALYSES OF PLAN
The building have been planed in east
and west orientation..
but orientation toward hot sun and
heavy rain, the orientation can be rotate
that may be give positive value.
also the building have good access of
day light and breeze through terrace
garden and window the building have 4
different types of house, that is of
variations expressed externally by shear
end walls that hold up the cantilevers.
The surfaces cut away to open up
double height terrace gardens at the
corners is the nice idea.
Case 2:KANCHANJUNGA APARTMENTS
CASE STUDY CASE STUDY and prototype design
Case 3: VIVA TOWER:
A mixed used building found in Dar es salaam situated
near city center Posta and near another mixed use
building Uhuru heights along Bibi Titi road
this building is
located along the road
just as the proposed
site for the proposed
Victoria project at
Victoria.
viva towers has
parking spaces within
the building which
allow many of its users
to park their cars
Maison Loucheur (1928-9)
designed by Le CorbusierA combination of folding
furniture and sliding walls allows different configurations for day and night.
Le Corbusier argues that the purchaser is paying for 46m2 of space but through the cleverness of the design is actually getting 71m2 of effective space.