PROJECT TITTLE By:-Gogdfrey Mgaya PROPOSED FLEXIBLE RESIDENTIAL APARTMENT BLOCK …D…. ON PLOTS …300… ALONG NEW BAGAMOYO ROAD DAR ES SALAAM CLIENT: NATIONAL HOUSING CORPORATION P O BOX 2977 DAR ES SALAAM

site analysis

Embed Size (px)

Citation preview

PROJECT TITTLE

By:-Gogdfrey Mgaya

PROPOSED FLEXIBLE RESIDENTIAL APARTMENT

BLOCK …D…. ON PLOTS …300… ALONG NEW BAGAMOYO ROAD

DAR ES SALAAM

CLIENT:NATIONAL HOUSING CORPORATIONP O BOX 2977DAR ES SALAAM

Site

- Site Location : Victoria, Dar es Salaam, Tanzania

- Site Area : 2065.475m2

-Charicteristics: The site topography relative flat, currently not developed.

Tanzania

Dar es salaam

SITE

1: SITE MAPS AND LOCA-TIONS

LOCATION

N

SITE LOCATION

Tigo Headquarters Kijiji cha Makumbusho

PEDF tower Millennium Towers

THE SITE IS LOCATED• 759.12m from Tigo Headquarters•. 630.15m from Hubert Kairuki Hospi-tal.•881.86m from Millennium Towers.•1.4km from Airtel Headquarters.•737.5m from Makumbusho•388.86m from PEDF towers.

SITE

N

1: SITE MAPS AND LOCA-TIONS

NEIGBHOURHOOD AND ACCESSIBILITY

Kairuki Hospital

BMTL building/ NBC bank

The site located close to the New Bagamoyo road, Filling station and the road to Hubert Kairuki Hospital, BMTL building/NBC bank. which means the site well accessible and close to services.

Bagamoyo road

ALPA Hotel

2: SITE BOUNDARIES AND REFERENCE POINTS

SITE features

-Existing features on Site -There is a very small vegetable garden on site and a section whereThere are bushes and small sizedtrees along the site boundaries-There are piles of aggregate and a small corn farm.

SITE

3: VEGETATIONS AND PLAN-TATIONS

Fuel filling station

Road against SITE

-Services

The site is surrounded with services

At all sides; Bagamoyo road, Filling

station and the road to Hubert

Kairuki Hospital, NMB bank. which

means the site well accessible and

close to services.

Knight support

Victoria, SITE

4: SERVICES AND INFRA-STRUCTURES

CLIMATIC ANALYSIS OF THE SITE

MACRO - CLIMATIC ANALYSIS

SunshineHumidity

Wind speedPrecipitation

Rainy daysTemperature

Water temperature

MICRO - CLIMATIC ANALYSIS OF THE SITE

SE – wind direction

NE – wind direction

CLIMATIC ANALYSIS OF THE SITE

Wind pressure, pat-tern and direction

Sun – path ( east to west)

CLIMATIC ANALYSIS OF THE SITE

Annually sun-path

SITE

KAIRUKI ROAD

BAGAMOYO ROAD

BMTL

EXISTING STRUC-

TURES

APLE HOTEL

Annually sun-path passes on top of the

site from east to west

CLIMATIC ANALYSIS OF THE SITE

Daily sun-path

Daily sun-path passes on top of the site from east to west

SITE

KAIRUKI ROAD

BAGAMOYO ROAD

BMTL

EXISTING STRUC-

TURES

APLE HOTEL

CLIMATIC ANALYSIS OF THE SITE

Confortability

DB 24.4 cRh 26.9 %

Ah 5.2 g/kgWB 13.4 C

SELECTED DESIGN STRATEGIES Passive solar heating Thermal mass effectsDehumificationNatural ventilation orientation of the building 12.5° from north

Construction materials:

Suggested materials include glass, treated timber, cement

product, Bricks, stones, concrete, Gypsum, Steel

beams, floors, columns should be able to resist fire for

not less than two hour

Floor finishing materials include terrazzo, sand cement

screed, and tiles

DESIGN RECOMMENDA-TIONS

Building layout and orientation on site:

Buildings will be organized to allow a clear air circulation and

natural light to every space. And oriented at an angle of 12.5°

from north

Roofs:

Fire resistant timber or steel trusses to be applied and tiles roof

covering material to control heat gain/lost

Climatic and environmental considerations:

Building elements like doors and windows should be positioned

to the building to encourage natural ventilation.

Also the use of shading device should be employed where

necessary

CASE STUDIES SELECTED CASES

Hints:

Site layout and planning

Spatial planning treatment

Architectural concepts

Room relationships and hierarchy

Building technology and construc-

tion

Finishing materials and usage

Building grouping and arrange-

ments

Building forms and architectural

style.

CASE STUDY

GRIESHOFGASSE, by HELMUT WIMMER

MAISON LOUCHEUR

(1928-9)

VIVA TOWER: Dar-es-salaam

KANCHANJUNGA APARTMENTS: India

CASE STUDY

Address: Grieshofgasse, by Helmut Wimmer

Work Type: new built

Context: urban

Number of Storeys:

5-storey

Type of Building:

tenement / apartment house

Number of Units:

9

Grieshofgasse, Helmut Wimmer, 1996. Typical of an approach that provides a cellular layout with undesignated uses. Extra flexibility is given in this case by the connections across the central hall.

CASE STUDY and prototype design Case 1: GRIESHOFGASSE, by

HELMUT WIMMER

ANALYSES OF PLAN

The building have been planed in east

and west orientation..

but orientation toward hot sun and

heavy rain, the orientation can be rotate

that may be give positive value.

also the building have good access of

day light and breeze through terrace

garden and window the building have 4

different types of house, that is of

variations expressed externally by shear

end walls that hold up the cantilevers.

The surfaces cut away to open up

double height terrace gardens at the

corners is the nice idea.

Case 2:KANCHANJUNGA APARTMENTS

CASE STUDY CASE STUDY and prototype design

Case 3: VIVA TOWER:

A mixed used building found in Dar es salaam situated

near city center Posta and near another mixed use

building Uhuru heights along Bibi Titi road

this building is

located along the road

just as the proposed

site for the proposed

Victoria project at

Victoria.

viva towers has

parking spaces within

the building which

allow many of its users

to park their cars

Maison Loucheur (1928-9)

designed by Le CorbusierA combination of folding

furniture and sliding walls allows different configurations for day and night.

Le Corbusier argues that the purchaser is paying for 46m2 of space but through the cleverness of the design is actually getting 71m2 of effective space.