Skyward ERP Implementation Project
Agenda
• About Skyward.
• Understand benefits of typical Skyward Implementation projects.
• Explain scope of the project for Client.
• Understand implementation methodology of Skyward.
• Explain project team structure and roles / responsibilities.
• Obtain high level overview of Skyward.
About Skyward
Skyward Slide 4
Skyward Service Offerings
Aligning Skyward to the business needs
• Arriving at ERP strategy and IT investment portfolio keeping business benefits in
mind
• Validating the business design around people, processes and technology
• Improving management of Enterprise operation and organization
Sourcing and Service Management
• Assistance in selection of ERP vendor
• Development of business cases and SLAs
Skyward Implementation
• End to end implementation
• Skyward Implementation support
Making large Skyward projects perform
• Identification, prioritization and assistance to the client to address all project risk and
quality issues to ensure proper project mgmt.
• Provision of expert inputs to help the transition of business process definitions to the
application requirement specifications.
• Conduct Change Readiness Assessment workshops, develop Change Strategy,
periodically help review & revise the Change Strategy
Skyward Slide 5
Skyward Service Offerings
Post Implementation Review
• Review of current state of the ERP in terms of benefits, coverage, usage, relevance
and issues
• Review of appropriate controls supporting integrity of business processes
• Review Business Case adherence and Recommend opportunities for better leverage of
investments in IT
Improve ERP Governance
• Help and implement effective Governance frameworks based on industry standards.
• Improve and optimize system architecture, performance, scalability, and redundancy.
• Assist IT management in selecting system controls and developing system security
configurations
Cost Management
• Benchmark their ERP performance against peers and best practice so as to identify
improvement opportunities
• Analyze cost reduction possibilities
• Develop cost identification and charging systems
Benefits of Skyward Implementation
Skyward Slide 7
Project Benefits
Skyward ERP project is an investment for an organization and
it helps in reaping Quantitative as well as Qualitative benefits.
Skyward Slide 8
Typical Quantitative benefits
• Reduction in time for book close (monthly, quarterly, annually).
• Reduction in time for preparation of monthly MIS for senior management.
• Better working capital management through visibility of inventory, production,
strict credit control for customers etc.
• Reduced inventory carrying cost due to efficient procurement process –
reduction in lead time from indent to procure to issue.
Skyward Slide 9
Typical Qualitative benefits
• Standardization of business processes across plants / units of the
organization.
• Real time data integration.
• Single point data entry improves data quality and consistency.
• Cross-function access to information, more holistic picture
– Analysis of single source of data.
– On screen enquiry.
– Data drill down.
• Reduction in manual efforts, duplication of work, non-value adding activities.
• Enhanced internal controls including segregation of duties.
Skyward Slide 10
Aim is to dramatically reduce Transaction Processing time, cost and effort
1
2
3
4
66% Decision Support
5% Finance Function Management
18% Controls
11% Transaction
Processing
Free resources for value creation and protection..
Skyward Slide 11
Transforming business performance through the
successful integration of people, process and
technology…...
People
ProcessTechnology
Critical Success Factors
Project Introduction
Skyward Slide 13
Overall project scope
• Skyward Modules Scope:
Finance
Sales
Purchase
Inventory
Production
Costing
HR and Payroll
• Manufacturing locations – No. of plants
• Project Site – Head Office and Branches
• Timelines – 3 months after Blue Print Signoff
Skyward Slide 14
Who are involved in the project?
Procure
licenses
Mobilise
Team
Mobilise
H/WSupport
Skyward Client H/W Vendor Client / Skyward
Implement
Skyward
Review
???
Implementation Methodology
Skyward Slide 16
Approach
Implementation
Stages
Project
Preparation
Blue Print Realization Final
Preparation
Go Live and
Support
1. Skyward ERP
Implementation
Prepare
infrastructure
define technical
requirements
Study As-Is
processes and
design To-Be
processes. Design
interfaces and
reports
Configure and test
in Development
and Integration
environments
Migrate
configuration to
production
environment.
Conduct pre Go
Live checks
Go Live. Address
issues. Fine tune
developments.
2. Data
Migration
Identify master
data
Prepare templates.
Create and check
test data. Suggest
controls and
validations.
Develop and test
data migration
programs.
Master and
transaction data
upload.
Address issues.
Sustenance plan.
3. Infrastructure Study HW, SW
requirements. HW
sizing and
installation.
Recommend steps
to define security
policy. Framework
for creating users
and authorizations.
Create ‘Test’
client. Install
production server.
Configure
transport system.
Final testing and
transport. Pre Go
Live check.
Performance
check.
Legacy system
cut off.
Production
system
performance
monitoring.
4. Benefit
Realization and
Sustenance
(Process
Improvement)
Identify
processes,
bottlenecks and
CSFs.
Define performance
measures and
framework to
measure it.
Standardize
processes.
Realize KPIs.
Test changed
processes and
train users.
Continuous
monitoring of
process
performance.
Skyward Slide 17
Approach
Project
Preparation
Blue Print Realization Final Preparation Go Live and
Support
5. Project
Management
Project plan,
templates,
procedures and
standards.
Document
escalation
procedure.
Ensure
deliverables and
sign off.
Scope change
review. Timely
deliverable and
sign off.
Prepare
contingency plan
and cutover plan.
Go Live
sustenance plan.
Support
procedure and
help desk.
Manage project
closure.
6. Change
Management
Identify change
agents.
Identify process
and organization
structure changes
and its impact.
Prepare
communication
plan.
Conduct change
workshops.
Implement
communication
plan.
Conduct change
workshops.
Implement
communication
plan.
Access change
readiness.
Evaluate and
monitor change.
7. Knowledge
Transfer
(Training)
Skyward overview/
Master data/ Data
migration.
Prepare training
templates and
manuals. Hands
on training to
core team.
Core team
training (train
the trainer).
End user training
by trainers.
Identify additional
training needs for
the end users.
End user training
on continuous
basis.
Skyward Slide 18
Implementation Methodology – Project Preparation
Phase 1 – Project Preparation
The purpose of this phase is to provide detailed planning and preparation for your project. Although
each Skyward project will have its own unique objectives, scope and priorities, the steps in Project
Preparation will help confirm and plan the principal topics that will need to be considered.
As the project team prepares for the Skyward implementation, there are several important issues that
must be addressed:
- Confirm viability of project goals and objectives
- Confirm the scope of your implementation
- Confirm your implementation strategies
- Specify the overall project schedule and implementation sequence
- Establish the project organization and committees
- Assign resources
By addressing these issues early in your implementation, you will help ensure that the project
proceeds efficiently and that you have established a solid foundation for a successful Skyward
implementation.
Major Milestones
The detailed project scope is signed-off by the project sponsors
The project team is staffed to support the Business Blueprint Phase
Project Strategies are complete and signed-off by the project sponsors
The project kick-off meeting is held
The Steering Committee is in place
Skyward Slide 19
Implementation Methodology – Project Preparation
Project Kickoff
Detailed Project Plan***
Core Team training
Project strategies***
Project infrastructure
Project kick off meeting involving entire
project team and steering committee members
Project time frames, detailed list of
deliverables, project organization and roles
and responsibilities
Overview of Skyward ERP to the Core Team
members
Approaches to key aspects in the
implementation including business
blueprinting, configuration, development,
system architecture, data transition and
change management
Fully operational development hardware for
Skyward system and project team; Fully
equipped project site infrastructure and
facilities for the project team
Skyward, Client
Skyward
Skyward
Skyward
Client
Client
Client
Client
Deliverable Description Major
Responsibility
Minor
Responsibility
*** Deliverable / Activity requires a formal signoff*** Deliverable / Activity requires a formal signoff
Skyward Slide 20
Implementation Methodology – Business Blueprint
Phase 2 – Business Blueprint
The purpose of this phase is to create the Business Blueprint, which is a detailed
documentation of the results gathered during requirement workshops. Furthermore, the
Business Blueprint documents the business process requirements of the company. On this
basis, you achieve a common understanding of how the company intends to run its business
within the Skyward ERP. During this phase, you also:
• Refine the original project goals and objectives.
• Define the baseline scope
• Refine the overall project schedule and implementation sequence.
Major Milestones
Technical environment for development is installed
Business process workshops are run
Business processes are designed and documented
Interfaces, Conversions, Enhancements, Bolt-on, if any are defined
Preliminary Data collection and cleaning approach are defined.
Business Blueprint is created and approved by Project Sponsors. Business
Blueprint outlines
How Skyward functionality will be used for each process, product gaps and
solutions.
Skyward Slide 21
Implementation Methodology – Business Blueprint
Business Blueprint***
Preliminary Data
Transition Approach
and Key data elements
Data collection and
cleaning plan
List of interfaces and
enhancements
Hardware Sizing &
Installation
Detailed to-be business processes
outlining how the Skyward ERP
functionality
will be used in each process, product
gaps and solutions
Approach to taking over data from
legacy systems into Skyward ERP
Status of the data at various locations,
detailed plan for data collection and
cleansing, responsibilities for data
management
Detailed list of developments that need
to be taken up for reports, layouts, data
uploads and interfaces, along with effort
estimate and resource plan for the
development activities
Sizing & Installation of servers, design
and installation networks
Skyward, Client
Skyward
Client
Skyward, Client
Client
Client
Skyward will
assist Client in
sizing of
servers
Deliverable Description Major
Responsibility
Minor
Responsibility
*** Deliverable / Activity requires a formal signoff
Skyward Slide 22
Implementation Methodology – Realization
Phase 3 – Realization
The purpose of this phase is to implement business and process requirements based on the
Business Blueprint. The objectives are final implementation in the system, an overall test, and the
release of the system for productive (live) operation. The project team receives relevant knowledge.
Major Milestones
Configuration and confirmation
Develop Conversion plans and programs
Develop application interface programs
Develop enhancements
Bolt-on configuration and enablers
Create reports
Create layout sets
Conduct System integration test and record test results
Develop End-user training strategy and plan
Create user authorization and profiles
Conduct Quality check
Skyward Slide 23
Implementation Methodology – Realization
*** Deliverable / Activity requires a formal signoff
Configured system***
Detailed data
conversion plan
Data preparation and
cleaning
Reports, interfaces,
layouts and
enhancements
System test plan and
test results***
User authorizations
End user training
strategy and plan
Fully configured system as per to-be
processes and system documentation
Detailed data conversion plan for each
location along with responsibilities
Data collection, extraction from legacy
systems, cleaning and testing of the
data
Completed development, documented,
tested and accepted by end users
Test plans for module and integration
testing, test results
User authorization profile definition
and profile creation in the Skyward
system
End user training structure and
training schedule
Skyward
Skyward
Client
Client
Skyward,
Client
Client
Skyward
Client
Client
Skyward
Client
Deliverable Description Major
Responsibility
Minor
Responsibility
Skyward Slide 24
Implementation Methodology – Final Preparation
Phase 4 – Final Preparation
The purpose of this phase is to complete the final preparation, including testing, user training, system
management and cut over activities, to finalize your readiness to go live. This final preparation phase
also serves to resolve all crucial open issues. On successful completion of this phase, you are ready
to run your business in your productive Skyward system.
Major Milestones
Transfer of tested customization and development to production environment
Completion of Conversions
Delivery of End User Training
Establishment of Help Desk
Tested Technical Environment
Review of Open issues
Attain Final Approval For Going Live
Skyward Slide 25
Implementation Methodology – Final Preparation
*** Deliverable / Activity requires a formal signoff
End user training
Production System
Data upload
Help desk
Open issues list and
contingency plan***
Go-live readiness
checklist***
Go Live***
Delivering role based product training
to users at each of the locations
All configuration and development
transferred to the production
environment and tested
All the data elements tested and made
available in the prescribed file formats,
uploaded into the production system
and signed off
Help desk personnel identified, help
desk procedures defined and staff
trained
Complete and prioritize the open
issues list and approaches to each of
the issues
Assessment of key parameters for go-
live and degree of readiness
Shutdown of legacy systems and
cutover to live ops on Skyward ERP
Client
Skyward
Client
Client
Skyward
Skyward
Skyward, Client
Skyward
Client
Skyward
Skyward
Client
Client
Deliverable Description Major
Responsibility
Minor
Responsibility
Skyward Slide 26
Implementation Methodology – Go Live and Support
Phase 5 – Go Live and Support
The purpose of this phase is to move from a pre-production environment to a live productive
operation. You must set up a support organization for users, not just for the first critical days of your
productive operations but also to provide long term support.
During this phase, users of the Skyward system have many questions. There must be a solid user
support organization easily accessible to all users. This phase is also used to monitor system
transactions and to optimize overall system performance. Finally, the completed project is closed.
Major Milestones
Successful Go-Live
Official handoff to client
Skyward Slide 27
Implementation Methodology – Go Live and Support
*** Deliverable / Activity requires a formal signoff
Project closure
document***
Open issues and plan for resolution of
each of the open issues
Skyward,
Client
Deliverable Description Major
Responsibility
Minor
Responsibility
Skyward Slide 28
Project Monitoring Framework
Our project management is based on the following philosophies :
It is imperative that a project is supported by an Integrated Project Work-plan which will
help us to carry out
Multilevel analysis: Project, development area, detailed task.
Tracking of progress: Daily and Weekly Status Reviews.
Formal reporting: Monthly and Quarterly reporting to Management.
Steering Committee Meetings: Before and After important milestones
There has to be timely and accurate communications, for which we need to
Publish weekly status reports.
Have an Integration Coordination Team responsible for managing the multiple
module / location configuration issues.
Early user involvement for which we need to
Schedule reviews and system walkthroughs with process owners / super users /
end users.
Ensure a formalized sign-off process.
Skyward Slide 29
Project Monitoring Framework
Reporting and Control
The Project Manager develops a periodic update with the following information
Project executive status
Risk / Issue log
Accomplishments for the week
Goals for next week
Milestone progress
This is discussed with the client project manager during periodic project manager meets
to resolve pending issues and plan further activities
Skyward Slide 30
Training and Knowledge Transfer
Core Team Training
Once the core team is identified they will undergo an extensive training for an agreed
time frame. This training will consist of 3 phases.
The first phase will be Skyward Overview training for all functional team
members.
The second phase will be Skyward functional module, the detailed
product, training for the relevant teams.
The third phase will be the detailed discussion on the interface points
for the relevant teams
The core team will be divided according to the modules assigned to them during the
project initiation phase and each will undergo training in their respective modules.
The training will have required hands-on sessions to enable the team members to work
comfortably with the Skyward system.
Skyward Slide 31
Training and Knowledge Transfer
End User training
The success of an implementation can be achieved only by fully trained end users.
With this in mind we propose to provide the base template to the core team
members who will develop a detailed training plan, training manuals and finally
conduct training for end users. Skyward will facilitate this process by providing the
training strategy and approach.
The end users will be divided in batches as per their functional and process
involvement. Core team will identify and nominate the end users for this training.
Hand-holding support to the users
While Skyward takes the entire core team through the implementation, it has been
Skyward’s policy to provide post implementation support to the implementation team
and the end-users, after the system goes live.
Selected members of the team will be identified for the post implementation support
Skyward Slide 32
Data Migration Methodology
Challenge of data conversion / migration is the coordination between four normally
disparate groups
• Skyward functional
• Skyward technical
• Legacy functional
• Legacy technical
Skyward’s Data Migration methodology
Determine Skyward module and master data
• Skyward will provide the templates for the Master and Transaction data that
needs to be migrated from legacy system to Skyward
Determine Source System
• Determine the legacy source systems that are needed to populate Skyward
data files.
Determine Conversion Method
• Manual or automatic, by analyzing the volumes and complexity.
Skyward Slide 33
Risk Management
Project Risks
Skyward recognizes that implementing a complex ERP system such as Skyward system
may involve certain risks for Client. Accordingly, we shall take steps to mitigate project risk
during the lifecycle of the project. Our approach to risk management is guided by the belief
that:
Project risk is measurable.
Measurement and structure of risk profile is necessary.
Based on risk assessment, different projects require:
• Different project management strategy
• Different project management style
• Different project management skills
During the project, the Skyward team and the Client project management team will conduct
an exercise in risk identification and mitigation jointly.
Skyward Slide 34
Risk Management
Medium riskHigh risk
Low risk Low risk
Complexity of
Technology
Clarity of Business Model
Accordingly, the Analysis stage of the project lifecycle is marked, as a “high risk”
zone, design and construction are “medium risk” zones while execution is “low”.
Skyward Slide 35
Quality Assurance
Skyward brings to the table the unique ability of delivering a holistic solution to a client,
encompassing the need to bring in industry and domain expertise, the needed technology
know-how developed through vendor relationships, and the need for a clear understanding
of the client's business processes, analytical requirements and future vision.
Quality Assurance Activities
No. Activity Responsibility
1 Initiate Project Quality Assurance Activities PM/ PQA
2 Track Project Quality Assurance Activities and
measurements
PM/PQA
3 Conduct Audit of the Project PQA
4 Report and ensure issue resolution PQA
PM : Project Manager
PQA : Project Quality Advisor
Project Team Structure
Skyward Slide 37
Project Organisation
Project ManagerSkyward
Project ManagerClient
Project Steering Committee
Client
Skyward Technical Teams
Skyward + Client
Skyward Module Teams
Skyward + Client (Core Team representing all functions / departments / units)
Skyward Slide 38
Responsibilities of Client Core Team
As-Is
To-Be
Realisation
Final
Preparation
Support
Provide understanding of current business processes, undertake
Skyward overview training
Agree with Skyward on how the business processes will be mapped in
Skyward, understand gaps if any, agree on alternate solution to bridge
the gaps
Undertake detailed module training, develop test cases, conduct
testing, confirm whether solution meets Client’s requirement
Assist in end user training, prepare data for migration, agree on
accesses / authorisations to be given to end users, assist in go-live
Handhold end users, solve queries, make desired changes to solution
where necessary
Skyward Slide 39
Client Team Involvement
Phase Preparation As-Is To-Be Realization Final
Preparation
Support
Core Team
IT Team
Project Manager
Sr. and Top Mgmt
End Users
Skyward Overview
Skyward Slide 41
Skyward 1.0 Real time Integration Model
Sales &Distribution
ProductionPlanning
MaterialsManagement
Finance &Controlling
CustomerSales Order
Shipment
Receivable Accounts / Cash Receipt
Credit Limit
Material Availability Check
Transfer of Requirements
Goods Issue to SO
Go
od
s Receip
t
Invo
ice Receip
t
Pu
rchase O
rder
Accounts Payable
Invoice
Accounting DocumentProduction Cost
Production Order
Production Order Receipt
Vendor
Skyward Slide 42
determination
Order follow-up
inventory management
Requirements
1.
Vendor selection3.Order Processing4.
5.
Goods receipt and6.
Invoice verification
Purchase Order
7.
8.Source
determination
2.Payment
Vendor
invoice?
MM Process Overview
Skyward
Inventory And Purchase Functional Flow
Slide 43
Skyward Slide 44
Pre -Sales ActivitiesPre -Sales Activities
Sales Order
Processing
Sales Order
Processing
Inventory
Sourcing
Inventory
Sourcing
ShippingShipping
BillingBilling
Invoice
PaymentPayment
Sales Processes: Overview Diagram
Skyward Slide 45
-
Sales Functional Flow
Skyward Slide 46
Documents in Sales
MMAATTEERRIIAALLSS
MMGGMMTT..
Pre- salesPre- sales
Sales OrderProcessing
Sales OrderProcessing
ShippingShipping
BillingBilling
Customer payment /Financial Accounting
Customer payment /Financial Accounting Accounts
receivable
Accounts receivable
Schedulingagreement
Schedulingagreement
Invent . sourcingInvent . sourcing
ContractContract
SSAALLEESS
IINNFFOO
SSYYSSTTEEMM Billing doc .Billing doc .
TransportationOrder
TransportationOrder
ContactContact
InquiryInquiry
QuotationQuotation
DeliveryDelivery Goods issueGoods issue
Material Stock Account
Material Stock Account
ShipmentShipment
PP
RROODDUUCCTTIIOONN
PPLLAANNNNIINNGG
OrderOrder
Skyward Slide 47
The FI application module is designed for automated
management and external reporting of general ledger,
accounts receivable, accounts payable, and other sub-ledger
accounts
SkywardApplication Modules
Financial Accounting (FI)
Skyward Slide 48
Financial Accounting
FI
• General Ledger Accounting
• Accounts Payable
• Accounts Receivable
• Financial Controlling
Skyward Slide 49
Production Functional Flow
Thank you