15
St d d b d St d d b d Standards-based Interoperability: Standards-based Interoperability: An Update February 2008 An Update February 2008 Greg Gorbach Vice President ARC Advisory Group [email protected]

Standards based interoperability g gorbach arc orlando 2008

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Standards based interoperability g gorbach arc orlando 2008

St d d b dSt d d b dStandards-basedInteroperability: Standards-basedInteroperability: p y

An UpdateFebruary 2008

p yAn Update

February 2008

Greg GorbachVice President

ARC Advisory Groupy [email protected]

Page 2: Standards based interoperability g gorbach arc orlando 2008

Leading Manufacturers Connect P2BSource: ARC Survey of Manufacturers, 2007 Leading Manufacturers Connect P2BSource: ARC Survey of Manufacturers, 2007

Roll-up Info From Multiple Plants

Integration Technology

Competitors

Leaders

Competitors

Leaders

0% 20% 40% 60% 80% 100%

Followers

0% 50% 100%

Followers

SOA for ManufacturingP2B Business Process

Leaders

SOA for Manufacturing

Leaders

P2B Business Process Synchronization

0% 20% 40% 60% 80%

Followers

Competitors

0% 20% 40% 60% 80%

Followers

Competitors

3© ARC Advisory Group

Using Piloting or Implementing Exploring

0% 20% 40% 60% 80%0% 20% 40% 60% 80%

Page 3: Standards based interoperability g gorbach arc orlando 2008

Standards-Based P2B InteroperabilityA Brief Review of ActivitiesStandards-Based P2B InteroperabilityA Brief Review of Activities

Early Key Events• Users trigger SAP interest:

2003 200 k h• 2003, 2004 - Process, Discrete Workshops• ISA/OAGi agreement signed: end 2005

User Meetings at ARC Forum: February 2006g y• Interested in standards convergence, esp. P2B• Need short time frame: 1 year

Standards groups ready to step up• Standards groups ready to step upCustomer Advisory Council and Guideline Working Group formed: Feb/Mar 2006

4© ARC Advisory Group

Page 4: Standards based interoperability g gorbach arc orlando 2008

Creating P2B InteroperabilityProactive Groups Spark Standards ConvergenceCreating P2B InteroperabilityProactive Groups Spark Standards Convergence

5© ARC Advisory Group

These Groups Formed in February/March 2006

Page 5: Standards based interoperability g gorbach arc orlando 2008

Standards ConvergenceStatus – February 2007Standards ConvergenceStatus – February 2007

A methodology has been developed for creating ISA content in OAGISThe OAGi Board of Directors has agreed to express the ISA-95 data model in OAGIS, and BODs are being createdc ea edISA-95 has been improved with:• UN/CEFACT Core Components (ongoing)

OAGIS BOD i b t• OAGIS BOD messaging, nouns, verbs, etc.B2MMLv4 supports ISA-95 object structures by themselves or wrapped in an OAGIS-style transaction

t icontainer

6© ARC Advisory Group

Page 6: Standards based interoperability g gorbach arc orlando 2008

Two ISA-95 Implementations: Status – February 2007Two ISA-95 Implementations: Status – February 2007

B2MML• Supports UN/CEFACT core components using OAGIS• Supports UN/CEFACT core components using OAGIS

core component schema• Implemented ISA-95 transactions as subset of

OAGIS transactions• Extensions permit inclusion of OAGIS components in

B2MML documents

OAGISOAGIS• OAGi Board of Directors authorized incorporating the

ISA SP-95 Data Model into the OAGIS standard• BODs based on the ISA-SP95 data model are beingBODs based on the ISA SP95 data model are being

developed (starting with Production Performanceand Production Schedule)

• Users can map back and forth from OAGIS to B2MML

7© ARC Advisory Group

by closely aligning some of their messages to the B2MML implementation.

Page 7: Standards based interoperability g gorbach arc orlando 2008

Current Status - February 2008Current Status - February 2008

Both Customer Advisory Council and Manufacturing Interoperability GuidelineManufacturing Interoperability Guideline Working Group No Longer ActiveOpenO&M continuing standards collaboration p gactivitiesOAGi (OAGIS BODS) and WBF (B2MML) Implementations of ISA95 Are Proceeding inImplementations of ISA95 Are Proceeding in Parallel

8© ARC Advisory Group

Page 8: Standards based interoperability g gorbach arc orlando 2008

OAGI and ISA95OAGI and ISA95

OAGIS Release 9.2 includes the new ISA-95 based BODsbased BODsTarget Release Date: February 1, 2008

11© ARC Advisory Group

Page 9: Standards based interoperability g gorbach arc orlando 2008

ISA S-95 Production Schedule ModelISA S-95 Production Schedule ModelProductionSchedule

1..n

Is made up of

ProductCorrespondsto a Production

ProductionSchedule

1..n

Is made up of

ProductCorrespondsto a Production

1..n

SegmentRequirement

Is made up of

ProductProduction

Rule

RequestedSegmentResponse

Correspondsto a

to a ProductionRequest

0..n

ProcessSegment

1..n

SegmentRequirement

Is made up of

ProductProduction

Rule

RequestedSegmentResponse

Correspondsto a

to a ProductionRequest

0..n

ProcessSegment

May contain

0..n 0..n0..n0..n 0..n 0..n

P d ti

May contain

0..n 0..n0..n0..n 0..n 0..n

P d ti PersonnelRequirement

EquipmentRequirement

Material ProducedRequirement

PersonnelRequirement

EquipmentRequirement

Material ProducedRequirement

1..n 1..n 1..n

Material ConsumedRequirement

Material ConsumedRequirement

1..n

ConsumableExpected

ConsumableExpected

1..n

Is associatedto either

ProductionParameter

PersonnelRequirement

EquipmentRequirement

Material ProducedRequirement

PersonnelRequirement

EquipmentRequirement

Material ProducedRequirement

1..n 1..n 1..n

Material ConsumedRequirement

Material ConsumedRequirement

1..n

ConsumableExpected

ConsumableExpected

1..n

Is associatedto either

ProductionParameter

Corresponds toelement in

Corresponds toelement in

Corresponds toelement in

RequirementProperty

RequirementProperty

RequirementProperty

Process

Corresponds toelement in

RequirementProperty

ExpectedProperty

ProductParameter

Corresponds toelement in

Corresponds toelement in

Corresponds toelement in

RequirementProperty

RequirementProperty

RequirementProperty

Process

Corresponds toelement in

RequirementProperty

ExpectedProperty

ProductParameter

12© ARC Advisory Group

PersonnelModel

EquipmentModel

MaterialModel

ProcessParameter Personnel

ModelPersonnel

ModelEquipment

ModelEquipment

ModelMaterialModel

MaterialModel

ProcessParameter

Page 10: Standards based interoperability g gorbach arc orlando 2008

OAGIS Production Schedule BOD (Draft)OAGIS Production Schedule BOD (Draft)

13© ARC Advisory GroupCopyright © 1995 - 2007 Open Applications Group, Inc. All rights reserved

Page 11: Standards based interoperability g gorbach arc orlando 2008

ISA S-95 Production Performance ModelISA S-95 Production Performance ModelProductionPerformance

Production

1..nIs made up of

ProductionPerformance

Production

1..nIs made up of

1..n

ProductionResponse

SegmentResponse

Is made up of

ProcessSegment

Correspondsto a

1..n

ProductionResponse

SegmentResponse

Is made up of

ProcessSegment

Correspondsto a

Personnel Equipment Material ProducedProduction

May contain

0..n 0..n0..n0..n

Material Consumed

0..n

Consumable

0..n

Personnel Equipment Material ProducedProduction

May contain

0..n 0..n0..n0..n

Material Consumed

0..n

Consumable

0..n

PersonnelActual

EquipmentActual

Material ProducedActual

ProductionData

PersonnelActual

EquipmentActual

Material ProducedA t l

1..n 1..n 1..n

Material ConsumedActual

Material ConsumedActual

1..n

ConsumableActual

ConsumableActual

1..n

PersonnelActual

EquipmentActual

Material ProducedActual

ProductionData

PersonnelActual

EquipmentActual

Material ProducedA t l

1..n 1..n 1..n

Material ConsumedActual

Material ConsumedActual

1..n

ConsumableActual

ConsumableActual

1..n

Corresponds toelement in

Corresponds toelement in

Corresponds toelement in

ActualProperty

ActualProperty

ActualProperty

Corresponds toelement in

ActualProperty

ActualProperty

Corresponds toelement in

Corresponds toelement in

Corresponds toelement in

ActualProperty

ActualProperty

ActualProperty

Corresponds toelement in

ActualProperty

ActualProperty

14© ARC Advisory Group

PersonnelModel

EquipmentModel

MaterialModel

PersonnelModel

EquipmentModel

MaterialModel

Page 12: Standards based interoperability g gorbach arc orlando 2008

OAGIS Production Performance BOD (Draft)OAGIS Production Performance BOD (Draft)

15© ARC Advisory GroupCopyright © 1995 - 2007 Open Applications Group, Inc. All rights reserved

Page 13: Standards based interoperability g gorbach arc orlando 2008

Ongoing CollaborationOngoing Collaboration

OAGi is building the ISA-95 Data Model into the OAGIS standard to provide a broaderthe OAGIS standard to provide a broader solution for OAGIS users.OAGIS is sharing their data model with ISA-g95With BODs based on the ISA-95 data model, the user can more easily map between OAGISthe user can more easily map between OAGIS and B2MML.

16© ARC Advisory Group

Page 14: Standards based interoperability g gorbach arc orlando 2008

WBF B2MMLWBF B2MML

B2MML v04 is the latest versionMany enhancements improve alignment betweenMany enhancements improve alignment between B2MML and OAGIS 9.0For example:

B2MML i d i d t i l t b t f th OAGiS 9 0• B2MML is designed to implement a subset of the OAGiS 9.0 message rules that are consistent with the ISA 95 Part 5 definitions. The B2MML ApplicationArea and verb elements are subsets of the full OAGIS 9 0 specificationselements are subsets of the full OAGIS 9.0 specifications, with minor differences.

• In order to be consistent with the OAGIS message transaction format a change was made to use thetransaction format, a change was made to use the UN/CEFACT core component types as the base types for all elements.

18© ARC Advisory Group

Source: WBF.

Page 15: Standards based interoperability g gorbach arc orlando 2008

Thank You.Thank You.For more information, contact the author at

[email protected] or visit our web pages atwww arcweb com

19© ARC Advisory Group

www.arcweb.com