Pressure Decay Procedure.
Duration : 45 minutes.
• Each team will be given 45 minutes to test, plot the graph and identify the
damaged water filter clusters.
• The team shall complete the testing within 30 minutes and the remaining 15
minutes shall be used for presenting their findings and report.
Each team is required to plot a minimum of three graphs, Pressure against
Time. The first graph shall represent a system without damage filter cluster.
The second graph represents a damaged filter cluster(s). The third graph
represents each cluster of filter, over the entire module. Each module has
about 10 filter clusters.
The testing pressure shall be limited to a maximum of 1 bar only. The air
compressor provided is rated slightly more than 1 bar.
• The team will require to work together and analysis the data collected.
• At the end of the session, the team will be asked to identify the damaged
filter cluster.
• The team will submit their findings and report.
• We will study the information to verify if they understood the method that
they used and applied.
• Each team successfully complete this exercise is awarded up to 10 litres of
water, which will be added to their final total water collected.
Materials.
• Water Cluster filter model stand representing a water recycle plant.
• Compressor.
• Graph Paper
• Writing Pad.
Please submit graph and report to the volunteer at the end of the session.
>>>>> end of procedure <<<<<