Using Lean practices in Agile Fixed Bid project 17/02/2012 Santhana Krishnan

Using lean principles in agile fixed bid project

  • Upload
    sk2009

  • View
    786

  • Download
    0

Embed Size (px)

DESCRIPTION

A presentation made in Agile India 2012 as an experience sharing session by a practitioner of Lean and Agile.

Citation preview

Page 1: Using lean principles in agile fixed bid project

Using Lean practices in Agile Fixed Bid project 17/02/2012

Santhana Krishnan

Page 2: Using lean principles in agile fixed bid project

Agenda

Context / Introduction Plan Lean Practices Tracking Challenges Q&A

Page 3: Using lean principles in agile fixed bid project

Context - Challenges One of the largest publishing houses

New digital interface should be ready before holiday

Fixed time (18 weeks) and Budget ($$$)

Loads of requirements (1800+ story points – rough size) but limited capacity (880 points)

Yet to be finalized integration system(s)

Page 4: Using lean principles in agile fixed bid project

Context - Challenges

Time Capacity

Scope

Page 5: Using lean principles in agile fixed bid project

Context - Challenges

DB

Page 6: Using lean principles in agile fixed bid project

Plan

Page 7: Using lean principles in agile fixed bid project

Plan

Page 8: Using lean principles in agile fixed bid project

Lean Practices

Throughput

Waste

Reduce

Inventory

Page 9: Using lean principles in agile fixed bid project

Lean Practices

Focus on throughput

• (focus on getting the story signed off)

Throughput

Page 10: Using lean principles in agile fixed bid project

Lean Practices

Eliminate / reduce waste

• IPM X

• Bug tracking X

Waste

Page 11: Using lean principles in agile fixed bid project

Lean Practices

Minimize inventory

• (Cumulative Flow Diagram)

Reduce

Inventory

Page 12: Using lean principles in agile fixed bid project

Tracking

Page 13: Using lean principles in agile fixed bid project

Tracking

Page 14: Using lean principles in agile fixed bid project

Tracking

Page 15: Using lean principles in agile fixed bid project

Lean Practices

Identify right metrics

• (Story rate - average story point per developer per day)

Page 16: Using lean principles in agile fixed bid project

Tracking

Page 17: Using lean principles in agile fixed bid project

Where is it useful?

?

IPM?

Page 18: Using lean principles in agile fixed bid project
Page 19: Using lean principles in agile fixed bid project