50M PEB Erectioncsp-jamshedpur

Step 1 – Assembly of 2 rafters with bracings on ground

Step 2 – Erection of columns under suspended rafter

Step 3 – Lifting of Assembled unit up to 43 mtr height

Step 3 – cont….Lifting of Assembled unit up to 43 mtr height

Step 3 – cont….Lifting of Assembled unit up to 43 mtr height

Step 4 – Swing to Position at 43 mtr height

Step 5 – Positioning

Step 6 – Bolting at 36 mtr height

Step 7 – Releasing load from Crane

Step 7 – Erection Complete