Aeroportos Brasil Viracopos S.A. – Project Status

2

Construction of the structural pillars for the new passenger

terminal

3

Aeroportos Brasil Viracopos – Project Status

4

Aeroportos Brasil Viracopos – Project Status

5

Construction of the blocks and

pillars

Aeroportos Brasil Viracopos – Implementation of the

infrastructure and mesostructure in the Pier-C region

Preparing structural reinforcements Preparation for block construction and stake

leveling

Detail of the scaffolding used for pillar

construction

6

Aeroportos Brasil Viracopos – Implementation of the Pier C

Infrastructure

Bulldozed area in the region of the NTPS corridor

Pouring lean concrete into the base of block BL-1

in the NTPS corridor area

Semi-completed foundations to support

the corridor blocks Preparing blocks in the NTPS corridor area.

7

Aeroportos Brasil Viracopos – Implementation of the Pier A

Infrastructure

Implementing the infrastructure for NTPS Pier A

Excavation of BL-4 to raze the stake heads and

prepare lean concrete for NTPS Pier A. Enclosure for pouring concrete into a block at Pier

A Block awaiting concrete at NTPS Pier A

8

Aeroportos Brasil Viracopos S. A. - Concession

Concession: 30 years

Regulatory Agency ANAC

Share held by Triunfo: 23%

Operation Start Date: November 2012

Construction Start Date: August 2012

Capital Structure:

Contact

Email: ri@triunfo.com

+55 11 2169 3999

Rua Olimpíadas, no 205, Conjunto 142/143

Vila Olímpia - São Paulo - CEP: 04551-000

www.triunfo.com/ri

9