Ici building proposal

Preview:

DESCRIPTION

 

Citation preview

Foundation In Natural & Built EnvironmentJanuary Intake 2012

Semester 1

Introduction To Construction Industry (FNBE0125)Lecturer : Pn. Hasmanira

Project 2 – Client/Project Manager as a Team Player in Construction Industry

GROUP 15Name Student ID no.

Yam Yih Hwan 0305861

Chew Wen Lin 1007C10646

Janice Kong Yin Ying 0308798

Cromwell Augustine Jubili 0306595

IntroductionTypes if company:

Multi-Purpose Holdings Berhad (MPHB)

Address: Multi-Purpose Holdings Berhad (24127-4), 39th Floor, Menara Multi-Purpose, Capital Square, No.8, Jalan Munshi Abdullah, 50100 Kuala Lumpur, Malaysia.Tel: 603-2694833Fax: 603-26941380Email: info@mphb.com.my

Contact

Outdoor Multipurpose Open Hall

Types of building

Multipurpose Stage

Seats

Aqua-

rium

Aqua-

rium

Project• Aquarium• Surrounding Home Theater System• Rock Climbing• Performance Stage

VACANT LAND

Location• Avenue: Behind Taylor’s Lakeside University

Multipurpose Hall. (In between Block A and B, Level 2)

• Market Price: RM150, 000 • Size: 30m x 15m (approximately 450m²)

Surrounding• Indoor Multipurpose Hall• Music Hall• Library• Open Space Corridor

DevelopmentMultipurpose Stage :o Surrounding theatre system.o 70-inch LCD Television.o Rooftop covered by silicon glass.o A switch that allow to pull out the rock climbing from the ground. Aquarium :o Starphire glass, which provide clearer view.o Installed with water filter tank.o Requires Aquascape.o Nature style, Dutch style, Jungle style, Reef style.o Aquatic animal. Seats :o Able to contain a large amount of people.o Seats for 200 people.o With comfortable cushion on each seats.

Budget• Cost: - Aquarium (RM30,000)- Surrounding Home Theater System (RM50,000)- Rock Climbing (RM20,000)- Land Price (RM150,000)- Workers Pay (RM20,000)- Seats (RM5,000)

Duration given :

8 months (duration)

April 2012 till December 2012

Duration

Target• Students• Lecturers• Parents• Government (if possible)• Tourist (if possible)

Mission• A place where students can release their stress and

tension.• A place where students can show their talents.• A place for students to relax and enjoy.• A place for students to exercise.• Improve the school’s facilities.• Make a difference compare to other campus.

Vision

• To turn something useful out of nothing.

• To gain trust and confident from parents for their child study environment.

• To promote more student to enroll into Taylor University.

Advantage of the site• School site• Unused space• Eye capturing site• Big space• Beside a hallway

Problems that encounter

• Students might not able notice that place because it is not used often

• Hot weather• Might get wet if rain

• Make signboard to introduce this new area.• A glass roof to block out the rain but enable some

sunlight to pass through.• Install some cooling system around the area.

Ways to overcome problem

Consequences• Advantage:• Landmark• Economy• Recreation Place

• Disadvantage:• Air Pollution• Sound Pollution• Water Pollution

• As a conclusion, the vacant lot has the potential to be developed into outdoor multipurpose hall. The land has the strategic location because of it big space which located beside a hallway that can catch attention from every particle.

• Besides that, this project can bring benefits to Taylor’s University Lakeside Campus by turning an unused space into an outdoor multipurpose hall. For example, become the landmark for the university and raise the economy. Therefore, we have decided to start the project as soon as possible.