Citation preview
Microsoft Word - _990111_.doc:
: 98 11 02 98 11 11
: 99 01 11
2
98.06.25 30
Alstom
)……………………………………………………………………8
3. TLE 8
4. Alstom (Scope of Supply)9
5. 10
1. Z&J 19
2. 19
3. 19
4. 19
5. 20
6. 20
8. 21
26
(Oval Header)15
16
TLV DV 23
TLV DV 23
TLV DV 24
24
25
5
Alstom (PIM, Pre-Inspection Meeting)
Z&J Technologies
6
98.11.03()98.11.06()
TLE
CTCI : Rick, Yu Hung Hsu----------------E/M Quality Control Manager
Benjamin E.S. Chen---------------Engineer, Project Quality
Management LTHT : Deane Nigro----------------------Manager,
Procurement Karl Sarnowski-------------------Project, Manager Piotr
Lesisz---------------------Lead Inspecton
Alstom : Sven Grygier---------------------Project Engineer, Project
Management Christopn Bezikofer--------------Project Manager Design
Karsten Hartmann-----------------International Welding Engineer
Rolf Hochrath--------------------Inspection Engineer
98.11.07()98.11.08()
Technologies Mr. Rüdiger Klein Transfer Line
Valve
7
Rüdiger Klein---------Project Manager, Z&J
Benjamin E.S. Chen----Engineer, Project Quality Management,
CTCI
98.11.11()
8
Schack GmbH Bammental
Stuttgart, Wexford PA, U.S.A. Brno Czech
Republic Power Generation Gas Heater Air Preheater
TLE TLE 750 900
822 839Alstom TLE
5000
1 (Oval Header)
BFW
3. TLE
(Recircultion)
Coils Coils Y-Piece TLE TLE
SRT-
TLE
TLE TLE SRT-VI Channel
9
1 56 TLE( TLE)
2 2 TLE( TLE)
3 224 Inlet Transition Pieces
4
: , Alstom Power Energy Recoverys Office, Kassel,
Germany
: - ,
Alstom- Sven Grygier, Chritoph Bezikofer, Karsten
Hartmann, Rolf Hochrath
1.
8/17 LHT Alstom, Alstom 8/26 , Alstom
7/9 , .
Grygier, Miss Sonja Koch.
LHT :
Karl Sarnowski Ms. Deane Nigro, (Hold Point)
(Witness Point) 15 .
3.
.
ASME Code 2008, LHT2009
, . Alstom .
11
6. WPS/PQR , , ,
Alstom WPS/PQR LHT , , Weld Map LHT
.
FCAW:Alstom FCAW ,
GMAW: LHT Alstom WPSA16 A46, Root Pass
Spray Mode, Short Arc Weld. LHT ,
.
.
7.
Alstom Weld Electrodes Weld Map LHT .
8.1 0.7kg/cm2, Alstom 0.4kg/cm2,
AlstomLloyds 0.7kg/cm2
LHT. .
8.
, Alstom ,
, LHT .
11. /
Alstom ASME Code SectionVIII, Div. 1, Paragraph UCS 66
(Production Impact Testing), Alstom
ChamberProduction Test Plate(Impact
Alstom Production Test Plate (Hardness Testing)
12
13.
LHT XL10-0000-001
Rev.0 . LHT .
17. ,
, 11 10 LHT .
(Pre-Inspection Meeting)
CTCI,.
Alstom Supplier , CTCI.
3. Engineering Spec. DS-103-0000-1 , CTCI ,
LHT TLE Sec.I of ASME, (Boiler), CTCI
CPC .
LHT,
, X-Ray, UT, MT, PT, ET .
3. ASNT: American Society for Nondestructive Testing.
.
7. FCAW: Flux Cored Arc Welding: ,
10. PMI: Positive Material Identification , (
.
Hamburg , .
),
, .
18
19
1. Z&J
Duren
Z&J
,Z&J Licensors
Lummus, LINDE, Kellogg, S&W,KTI/Technip, KBR,Z&J
ABB-Lummus-Process
Quench Fitting TLV
Decoke Drum Licensor Z&J ,
Licensor Z&J
Z&J Lummus Process Ethylene
Z&J Double Disc (DDTC) Valves 60
( Single Disc Valve) 95% 90%
2.
TLV Bypass DV Decoke DV
4.
Z&J ( Single Disc and Double Disc Valve)LHT
Double Disc
Single Disc
Wedge-Ball Z&J 50%
,,
, PMI , NDE ASNT Level II .
,,Z&J
.
6.
1 Z&J Double Disc(DDTC) Hard Metal Sealing Disc
()! Sealing Area Disc !
Stem !
3 Z&J Groove Type- Sealing Ring
Double Disc DDTC (CPC ).
- Sealing Ring Double Disc DDTC . Z&J
Quench Fitting TLV () TLV ()TLV
200 400 Soft Seal Ring Metal Seal Ring
7. Z&J TLV
8. Single Double Disc Valve
21
Transfer Line Valve /Decoke Valve/Small Decoke Valve
1. Lummus BEP Section 13.0 “ Transfer Line and Transfer Line
Valve
Specification
2.
/
3. Single Disc Double Seal Valve Double Disc Valve Single Disc
Valve
( Lummus )
4. Single Disc Valve Single Disc Double Seal Valve
Valve Steam Purge System P&I Drawing “ Lummus Review
Comment
: Lummus BEP Section 13.0 Valve Steam Purge System P&I Drawing
“
Double Disc ValveSingle Disc Double Seal Valve
Valve Steam Purge System P&I Drawing “ (The valve steam
purge design shown on Lummus P & I drawings in the Basic
Engineering Package
is based on using a Double Disc valve. The steam purge design will
need to
be modified by CTCI to a design that is in accordance with the
requirements
of the selected Single Disc Double seal valve supplier. Lummus will
review
and comment on the updated P&I's when they are
available.)
5. Single Disc Valve Lummus Seal Ring
6. Transfer Line Valve Small Decoke Valve (Electronic
Logic Linkage )
7. Seal Ring
Seal ring should be capable of replacement (repairing) in the plant
site. Vendors
should provide the detailed procedure of "Replacement (repairing)
of seal ring
in the plant site" for owner to review.
8.
Linkage between Main Transfer Line Valves and Small Decoke valve
shall be
electronic logic control. The Small Decoke valve should be equipped
with manual
22
operation facility for manual operation purpose when the electronic
logic control
system is failed.
9. Main Transfer Line Valves and Decoke valve shall be splitted 3
pieces vales bodies.
10. (Maintenance Free)
DV
(2).
TLV DV
24
26
EPC
Inspector)
21 22