1 Royal Building System General RBS Aplications Construction Process Specifications and Construction...

Preview:

Citation preview

1

Royal Building System

General

RBS Aplications

Construction ProcessSpecifications and Construction details

Approvals and Certifications

Royal Andina kits

2

General

1.1. Company-Policies

1.2. Products Lines

1.3. RBS Construction System

1.4. Properties and Advantages

1.5. Construction Process

1.6. Construction Process-Video

1.7. Institutional Video

Royal Andina S.A.

We are a company dedicated to make PVC panels and profiles to offer a variety of solutions for the construction field.

Our products are made with Canadian technology and excellent quality.

From our plant in Cartagena we attended the Andina market, Central America and the Caribbean.

Our best reference is the testimony of our costumers and our projects since 1997.

Our commitment is simple: complete satisfaction to our costumers. We provide the ideal solution even for the most demanding projects.

4

Royal Andina Central and South America

5

PRODUCT LINES

RBS CONSTRUCTION SYSTEM

Window Systems

6

Electric Ducts or hydraulics

Concrete or empty with metallic structure

Steel of reinforcement

PVC Panel

RBS Construction System

The RBS system is made from PVC panels ready to assembly for any type of project.Depending on the project, the width or thickness could be less than 100 mm or 64 mm.Reinforced concrete filling for permanent construction or reinforced metal frame for reusable constructions.

7

RBS Construction System

Versatile and easy to project

100 mm System.

64mm System

64mm System Basic Module

100mm System Basic Module

Connector Panel

Panels Connector

8

• Durable• Waterproof• Ignífuge and self-extinguishable• UV protection• Aseptic• Corrosion resistant (oxide), salinity, chemical

and microorganisms• Homogeneous quality

Product properties

9

• Quick On –site Assemblyn • Acoustic and thermal insulation• Resistant to extreme weather condiions• Rodent/Pest Resistant • Can be designed to handle earthquake

and hurricane conditions• Finished • Adjust to any design • Easy to maintain & clean • Compatible with others constructions• Long-Term Durability: Will not rust,

corrode, flake, peel or rot!

Advantages of RBS System

Condominium after hurricane Michelle, built with RBS System, October 2001

10

Building Preparations

Walls filled with concrete

Walls filled with steel bars

11

RBS Aplications

2.1. Social Housing

2.2. Private Housing

2.3. Education

2.4. Health

2.5. Industry and Commerce

2.6. Camps

2.7. Hotels

2.8. Military Installations

2.9. Other applications

12

Social Housing

13

Social Solutions for the community

The properties and advantages of the RBS system offer an optimal alternative for the construction of social housing:

Worthy

High qualityFinished

Lasting and ComfortableWaterproof and UV protection remains stable over time.

14

Advantages

TRADITIONAL

RBS SYSTEM

Finished remains stable over time

15

Advantages

The durability of the materials can be seen when you compare our products with others

La Habana, Cuba

16

Advantages

Better finishes

TRADITIONAL

RBS SYSTEM

17

Advantages

The System doesn´t crack after the construction is settles down

TRADITIONAL

RBS SYSTEM

18

Housing

Houses, Cartagena, Colombia

• 24 units of 42 Sqm.• 12 years built

19

Housing

Social Housing, Curacao

• 50 units• 65 Sqm.

20

Housing

Tirima Project, Venezuela

•120 apartments• 45 Sqm.

21

Housing

House in Venezuela

•150 units• 60 Sqm.

22

Housing

House in Santa Lucía,Venezuela

• 200 units• 100 Sqm. area

23

Housing

House in Isla Margarita, Venezuela

• 300 units• 62 Sqm.

24

Housing

• 80 units• 65 Sqm.

Engineer houses, Changuinola, Panamá

25

Housing

• 56 Sqm. houses

Condominium project, Rep. Dominicana

26

Housing

Apartments, La Habana, Cuba

27

Housings

Las Lomas, México

28

Housing

Condominium project, St. Marteen

29

Private Housing

30

Housing

House in San José, Costa Rica

31

Housing

House in San José, Costa Rica

32

Housing

House in Cajicá, Colombia

33

Housing

House, Colombia

34

Housing

Country house, Rionegro, Colombia

35

Housing

La Arena house in Isla Del Rosario, Colombia

36

Housing

Summer house, Medellín, Colombia

37

Education

38

Education

“Infrastructure for educational areas”

The RBS system adapts to both rural and urban areas temporarily or permanently • Rapid execution• Quality of materials• Low cost and low maintenance• Fixed cost• Adapts thermally to regional climates

In addition, the RBS system provides an integral finish for immediate use, and allows to incorporate other finishes highlighting the sense of the community for the educational areas.

39

Education

School in Buenos Aires (Citibank), Quibdó, Colombia

40

Education

School in Buenos Aires (Citibank), Quibdó, Colombia

41

Education

Schools (Citibank), Providencia, Colombia

42

Education

El Divino Niño school (Citibank), Marinilla, Colombia

43

Education

Pedagogic unit, Cota, Colombia

44

Education

UNICEF Emilio Carvajal school, Buenaventura, Colombia

45

Education

Ferrostal school , Palonegro, Quindio, Colombia

46

Education

Several projects, Quindío, Colombia

Hermanitasde la Anunciación,Calarcá

Santa Maria Micaela schoolAdoratrices , Armenia

47

Education

Plan Padrino school, B/ventura, Colombia

48

Education

School Fundación Pies Descalzos, Bogotá, Colombia

49

Education

Paujil school, Caquetá, Colombia

50

Education

OIM – Timbiquí rural school, Cauca, Colombia

51

Education

OIM – Divina Pastora, Cucutá, Colombia

52

Education

Classroom , Nueva Granada school, Bogotá, Colombia

53

Education

San Miguel school, La Calera, Colombia

54

Education

Los Pinos school, Bogotá, Colombia

55

Education

Universidad Del Norte, Barranquilla, Colombia

56

Education

University classrooms, México

57

Education

Schools, México

58

Education

Coliseum, USA

59

Health

60

Advantages of RBS System

The materials used by the RBS system, offer construction free of

mold and low maintenance.

The thermal and acoustic characteristics of the RBS system

provides comfort in any climate regardless of geographical location

61

Health

Medical center in Acacias, Meta, Colombia

62

Health

Hospital in Bahía Solano, Colombia

63

Health

Cafesalud Medical center, Bogotá, Colombia

64

Health

Red Cross, La Tebaida, Colombia

65

Health

Administrative offices COACEMED, México

66

Health

Computer center COACEMED, México

67

Industry and Commerce

68

1. Foundation

3. Metal or concrete structure

2. Walls panels

Construction Process

69

4. Wall assemble 5. Section hoisted 6. Union between sections

Construction Process

70

Aspecto muro instalado

Contraflambeos para nivelar los largueros

en grandes luces

Largueros

La frecuencia de los refuerzos se

determina según la zona eólica

Proceso Constructivo

Detalle fijación muros a estructura

71

7. Hydraulic Inst. 9. Cover structure

10. Roofing

8. Electric Inst.

11. Finishes

Construction Process

72

Industry

Prince Plastics plant, Canadá

73

Industry

Agricultural Warehouse, USA

74

Industry

Biofilm plant 13.000 Sqm, Colombia

75

Industry

El Trébol, industrial warehouse, Colombia

76

Industry

Lime warehouse, Bogotá, Colombia

77

Industry

Refisal, Cartagena, Colombia

78

Industry

Minipak plant, Colombia

79

Industry

Warehouse project

80

Industry

Several projects, North America

81

Industry

Innovatec offices, Cali, Colombia

82

Agriculture Industry

Dairy farms, Canadá

83

Commerce

Supermarket Olímpica, Colombia

84

Commerce

Ford Sales Center, México

85

Camps and Accommodations

86

RBS CONSTRUCTION SYSTEM

We will be there!

IT DOESN´T MATTER WHERE YOU NEED US,

WE´´LL BE THERE

87

Construction Process

Floor and walls assemble systems

1. FOUNDATION 2. PLATE

4. WALL STRUCTURE 5. WALL ASSEMBLE

3. INSTALLATIONS

6. FRAMES INSTALLATION

88

Construction Process

Installations, roofing and finishes

7. HYDRAULIC INST. 9. COVER STRUCTURE

10. ROOF ASSEMBLE

8. ELECTRIC INST.

11. FINISHES

89

Camps

Pluspetrol camp, Pisco, Perú

90

Camps

Trompeteros project, Perú

91

Camps

Yanacocha, Perú

92

Camps

Camisea project, Perú

93

Camps

Airport project, Arequipa, Perú

94

Camps

Houses in Changuinola, Panamá

95

Camps

Military camps, Colombia

96

Camps

Houses for the Army, Melgar, Colombia

97

Camps

Cerrejón, Guajira, Colombia

98

Camps

Conconcreto Camps, Medellín, Colombia

99

Hotels

100

Hotels

Los Delfines Hotel, San Andrés Isla, Colombia

101

Hotels

Fiscal Hotel, Cuba

102

Hotels

Nitana Hotel, Coveñas, Colombia

103

Hotels

Morritt’s Grand Resort, Islas Cayman

104

Military Installations

105

Military Installations

Administrative office, the Fourth military division, Colombia

106

Military Installations

Hangar in Juanchaco, Colombia

107

Military Installations

Cotecmar hangar, Colombia

108

Military Installations

Gasur control tower, Colombia

109

Camps

Military camps, Colombia

110

Camps

Army housing, La Macarena, Colombia

111

Housing

Fiscal homes, Turbo, Colombia

112

Other Applications

113

Prodesa sales center, Colombia

Otther Applications

114

Carwash, Canadá

Other Applications

115

Gas stations, Brasil

Other Applications

116

Offices, Bogotá - Colombia

Other Applications

117

Oxicol offices, Cartagena, Colombia

Other Applications

118

Construction in flood zone, Panamá

Other Applications

119

Portable toilet, Colombia

Other Applications

120

Portables toilets, Argentina

Other Applications

121

Booth Royal Andina Expoconstrucción, Bogotá, Colombia

Other Applications

122

Church in Bolívar, Colombia

Other Applications

123

Refrigerators, Colombia

Other Applications

124

Swimming pools, Colombia

Other Applications

125

Swimming pools, Colombia

Other Applications

126

Several

Other Applications

127

RBS Construction Process

3.1. Concrete walls

3.2. Empty walls with

metallic structure

128

3.1.1 System description

3.1.2 64 mm and 100 mm systems

3.1.3 Preliminaries

3.1.4 Foundation

3.1.5 Plan location

3.1.6 Walls assemble

3.1.7 Installations

3.1.8 Steal reinforcements

3.1.9 Wall bracing

3.1.10 Frames installation

3.1.11 Concrete placement

3.1.12 Flooring plates

3.1.13 Roof Installation

Content

3.1. Concrete walls

129

Electric Ducts or hydraulics

Concrete or empty with metallic structure

Steel of reinforcement

PVC Panel

RBS CONSTRUCTION SYSTEM

The RBS system is made from PVC panels ready to assembly for any type of project. Depending on the project, the width could be less than 100 mm or 64 mm, reinforced concrete filling for permanent construction or reinforced metal frame for reusable constructions.

130

64 and 100 mm Systems

100 mm System

64 mm SYSTEM

64 mm SYSTEM Basic Module

Panels Connector

100 mm SYSTEM Basic Module

Connector Panel

131

Preliminaries

Preparation of the ground and installations

The structural design of the floor tile is the same as any other system, it is made base on the weight capacity of the floor.

The electric, hydraulic and sanitary installations including the steel reinforcement must stay inside the walls

132

Preliminaries

Royal material download to the construction site

The PVC profiles must be placed according to the size on the construction site, this will be warranty The best performance.

133

Foundation

FOUNDATION

The foundation must be well level

Plate detail

RBS WALLS

GUÍDE

GUÍDE

ANCLAJE DE VARILLAS

PLATE REINFORCING

STEEL BAR

134

Replanteo MurosDEMARCACION MUROS

Imprescindible uso de la cimbra para asegurar la posición de los muros y la

colocación de las guías.

Placa lista para la colocación de los paneles de muros

135

Ensamble Muros

IDENTIFICACIÓN PIEZAS

Todos los elementos que componenun kit están marcados y en el plano se especifica su ubicación.

Empresa

Proyecto

Tipo de Panel

Longitud del Panel

136

Walls assembly

137

Ensamble Muros

• La verticalidad de las juntas deberá revisarse al plomar los muros en uno y otro sentido.

• Es conveniente contemplar la escuadra de los muros.

90°

0.800.80 1.0 1.0

0.60 0.60

EJEMPLO DEL TRAZO DE ESCUADRA

EJEMPLO DE MAL PLOMADO DE MUROS

EJEMPLO DE VERTICALIDAD DE ESTRÍAS ENTRE PANELES Y CONECTORES

138

Ensamble Muros

MURO ROYAL

MURO ROYAL

90°

ESCUADRA

90°

MURO ROYAL

LOSA DE PISO

VISTA EN PLANTA VISTA EN ALZADO

5

3

4

• Ya completo el armado de los muros se procede a la nivelación y plomado de los mismos verificando las escuadras que se deben tener entre muros y entre losa de piso y muros.

139

Hydraulics Installations

140

Electric Installations

Installation of switch and outlet boxes

141

Steel ReinforcementsDepending of structural design, ¾ or ½ rod are used as vertical or

horizontal reinforcement.

142

Shoring walls

Wood or metal angles are used to shore walls, windows and doors

143

Placement of frames

• The andino frame can be placed inside the connector panel or over it.

• The frames can be placed before or after filling the walls.

See detail “C”See detail “A”

Detail “A”

Detail “C”Detail “B”

See detail “B”

144

Wall Bracing

Brace with pump

Metal funnel to avoid wasting the concrete.

145

Shoring walls

Cleaning the walls with water

Roof anchors

146

Mezzanine PlatesPlate system with blocks

Flooring plates for more than two floors

147

Mezzanine Plates

Plate system with SteeldeckSolid Plate

148

Roof installation

Placement of the beam

anchor

Enlarged picture of the RBS beam and roof

anchors

Placement of the ridge beam on the wall´s axis

Roof anchors

149

Roof Installation

Once the connectors are aligned in place, procede to present the panels, which will slide between connectors .

150

Roof Installation

Ventilation lid is placed Place lid Se procede a colocar la tapa de cumbrera

caballete

Ridge Installation

151

Roof Installation

TILES ALTERNATIVES

Roof with andina tile

Roof with clay tile

152

3.2. Empty walls with

metal structure

3.2.1. Floor assemble system3.2.2. Wall assemble system3.2.3 Frame installation3.2.4. Installations3.2.5. Roof structure3.2.6. Assemble of roof and finishes

153

Construction process

Floor assemble system

1. BASE SUPPORT 2. BASE OR PLATE

3. INSTALLATIONS

154

Construction Process

Walls assemble system

4. WALL STRUCTURE

5. WALLS ASSEMBLE

155

Construction Process

Frames for doors and windows

6. FRAMES INSTALLATION

156

Construction Process

Installations

7. HYDRAULICS INST.

8. ELECTRIC INST.

157

Construction Process

Roof structure

9. ROOF STRUCTURE

158

Construction Process

Roof assemble and finishes

10. ROOF ASSEMBLE

11. FINISHES

159

Specifications and detailes of construction

160

Approvals and Certifications

5.1. Fire resistant (English)

5.2. Fire resistant

5.3. Chemical resistant

5.4. Structural resistance of 64mm

5.5. Acoustic resistance of 100mm

5.6. Balistic testing

5.7. Maintenance technical guide

5.8. Tool list

161

Royal Andina Kits

6.1. Housing kits

6.2. Institutional Kits

162

6.1. Housing Kits

6.1.1. Labrador house - 15 sqm6.1.2. Montana house - 27sqm6.1.3. La Inés house - 36 sqm6.1.4. Paraiso house – 39 sqm6.1.5. La Cabaña house- 42sqm6.1.6 Verano house - 46 sqm6.1.7 Caribe house - 52 sqm6.1.8. La Calera house – 60sqm6.1.9. Lebrija house - 70 sqm6.1.10 Palmeras house120sqm

163

Labrador house – 15 Sqm

164

Labrador house – 15 Sqm

165

Montana house – 27 Sqm

166

Montana house – 27 Sqm

167

La Inés house – 36 Sqm

168

La Inés house – 36 Sqm

169

Paraíso house – 39 Sqm

170

Paraíso house – 39 Sqm

171

La Cabaña house – 42 Sqm

172

Verano house – 46 Sqm

173

Verano – 46 Sqm

174

Caribe house 52 Sqm

175

Caribe house 52 Sqm

176

La Cabaña – 42 Sqm

177

La Calera house 60 Sqm

178

La Calera house 60 Sqm

179

Lebrija 70 Sqm

180

Lebrija house 70 Sqm

181

Palmeras house 120 Sqm

182

Palmeras house 120 Sqm

183

6.2. Institutionals Kits

6.2.1. Lodging of - 81 Sqm6.2.2. Service module of 36 Sqm6.2.3. Administration module of 48 Sqm6.2.4. Large classroom of 48 Sqm6.2.5. Bathroom set of 24 Sqm6.2.6 Classroom module 2 of 74 Sqm6.2.7 Classroom module 3 of 110 Sqm6.2.8. Educational classroom module 4 + Set Bathrooms6.2.9. Módulo Educativo 6 Aulas+Bat. Baños

184

Lodging of 81 Sqm

185

Lodging of 81 Sqm

186

Service module of 36 Sqm

187

Service module of 36 Sqm

188

Administration module of 48 Sqm

189

Administration module of 48 Sqm

190

Large classroom of 48 Sqm

191

Large classroom of 48 Sqm

192

Bathrooms set of 24 Sqm

193

Bathrooms set of 24 Sqm

194

Classroom module 2 of 74 Sqm

195

Classroom module 2 of 74 Sqm

196

Classroom module 3 of 110 Sqm

197

Classroom module 3 of 110 Sqm

198

Módulo Educativo 4 Aulas+Batería Baños

199

Módulo Educativo 6 Aulas+Batería Baños