2015 MASS Re-Issue
Changes-Division 50
MASS’s many hats
Capital Projects Private Development Private Systems Outside
communities
Agency Use - ADEC PM&E use ADOT&PF use
Say what we do (MASS) and do what we say
(You)
2015 MASS Div 50 ChangesGeneral Changes – • Added a new article covering submittals to all sections• Moved materials to the materials articles• Moved construction instructions to construction articles• Moved common items under one section• Added some new materials
2015 MASS Division 50 Index Changes
Went from 22 sections down to 8
Where did they go?
MASS 2009 R3 Index
2015 MASS Div 50 Index
2015 MASS Div 50 IndexDivision 50 Table of ContentSection 50.01 General
Section 50.01 General
Section 50.02 Furnish and install pipeSection 50.02 Furnish and install pipeSection 50.13 polyethylene encasement
Section 50.03 Sanitary sewer concrete structuresSection 50.03 sanitary sewer manholesSection 50.04 watertight manhole frames and coverSection 50.06 construct sanitary sewer drop connectionSection 50.07 construct beaver slide
2015 MASS Div 50 IndexDivision 50 Table of Content Continued
Section 50.04 Sanitary sewer pipe connections and extensionsSection 50.08 lateral connection to existing pipeSection 50.10 sanitary sewer service connectionsSection 50.12 construct sanitary sewer cleanoutSection 50.15 on-property sanitary sewer serviceSection 50.17 raise or lower sewer serviceSection 50.21 adjust cleanout to finish grade
Section 50.05 Sanitary sewer flow controlSection 50.14 bypass pumping sanitary sewage flows
2015 MASS Div 50 IndexDivision 50 Table of Content ContinuedSection 50.06 Existing manhole modifications
Section 50.05 connections to existing sanitary sewer manholesSection 50.16 manhole rehabilitationSection 50.18 adjust sanitary sewer manhole cone to finish
gradeSection 50.19 adjust sanitary sewer manhole ring to finish gradeSection 50.20 remove existing sanitary sewer manhole
Section 50.07 Sewer closed circuit television inspectionsSection 50.22 closed circuit television inspections
Section 50.08 Remove and dispose of existing cesspools or septic tanksSection 50.11 remove and dispose of existing cesspools or septic
tanks and connect existing service
2015 MASS Div 50 ChangesMade use of General Definitions found in MASS Division 10, Section 10.01
Utility Company – The entity (person, corporation, company, agency, or other) that furnished service(s) (including petroleum and petroleum products, electricity, sanitary sewer, communications, water, natural gas, traffic signal control and storm sewer) utilizing conduit pipe, wire, cable or other transmission lines.
Utility Company was used in lieu of AWWU
Why this is important –It allows us to control who and when another company can work on our infrastructure. We have an obligation to protect the health and well being of our customers above all else.
2015 MASS Div 50 Changes50.01 – General• Article 1.1 Scope of Work• Made it applicable to all following sections • Added work area and bid link• Added Contractor secured areas• Added restoration• Added who is to act as the Engineer when an Engineer
is not assigned that duty. This is for private systems
• Article 1.3 – Surveys• Made survey incidental unless paid for under a bid
item.
2015 MASS Div 50 Changes50.01 – General• Article 1.4 Definitions (NEW)• Added definitions for common items stated in the
following sections of Division 50 in MASS.• Article 1.5 Concrete and Mortar• REMINDER – JET SET is not allowed
• Removed insulation requirements as we no longer specify insulation requirements higher than what is found in Division 20.
2015 MASS Div 50 Changes50.02 – Furnish and Install Pipe• Article 2.1 - General • Added a more defined scope in general.• Requirements to meet the DCPM – Official link
between MASS and the DCPM• Article 2.2 – Submittals (NEW)• Article 2.3 – Materials• Warning tape burial has changed due to numerous
comments received on 18”. Revised to a new minimum of 24” and a maximum of 36”.
• PE pipe resin is to be PE4710• Electro-fusion couplings are removed as an allowed
fitting (Change made 11-3-14)
2015 MASS Div 50 Changes50.02 – Furnish and Install Pipe• Article 2.3 – Materials• PVC pipe is to be 16” or less in diameter without
Engineering Division Director approval• Trace Wire changed to match updated details• Polyethylene Encasement requirements changed to
include VBio a MIC control additive• Article 2.4 Construction• Minimum pipe slopes added. Incorporated from DCPM
Mostly done for private systems residential construction, where plans are not required.
• Simplified alignment variance table• Removed batter board requirement for lack of current
use.• PE Encasement made incidental to pipe and removed
PE Encasement section
2015 MASS Div 50 Changes50.02 – Furnish and Install Pipe• Article 2.5 Testing• Made Lamping equivalent to CCTV inspection (e.g. can
substitute CCTV inspection for lamping• Better defined when testing may commence, after all
backfill, other utility installation etc…• Changed to have sewer stubs provide a bell • Exfiltration Testing changed substantially• Testing equipment requirements spelled out• Accounting for ground water spelled out (not new,
but not enforced consistently in the past). • Testing time table provided. This matches the
previous attempt in MASS, but never enforced. E.g. the total rate of air loss shall not exceed 2 cf/min
2015 MASS Div 50 Changes50.02 – Sanitary Sewer Concrete Structures• Article 3.1 – General - We install more than just manholes,
this change is to capture that and make it applicable to more situations
• Article 3.2 – Submittals (NEW)• This list went to D&S and was modeled off a CIP
project submittal I received.• Article 3.3 – Materials• Split out into many sections versus one section• Added Viscotaq waterproofing• Added internal drop connect• Added internal coatings (H2S – protection)
• Article 3.4 Construction• Re-organized with additional sections addressing the
incorporated and new items
2015 MASS Div 50 Changes50.04 – Sanitary Sewer Pipe Connections and Extensions• Changed title to match AWWU definitions• Kept separate from 50.02 to facilitate Private System
construction and some of the special requirements of private systems
• Article 4.1 – General• Listed what this section is applicable too.
• Article 4.2 – Submittals (NEW)• Article 4.3 – Materials• Connection material requirements spelled out when a
bell end is not provided• Pressure pipe (force) connection material called out
• Article 4.5 – Measurement• Incidental items broken out from the paragraph form
that is normal to MASS. This is to open discussion on inclusion, form and use.
2015 MASS Div 50 Changes50.05 – Sanitary Sewer Flow Control• Article 5.2 – Submittals (NEW)
50.06 – Existing Manhole ModificationsCombined a few similar sections into one section• Article 6.1 – General • Revised list as to what is encompassed in this Section.
50.07 – Sewer Closed Circuit Television InspectionsNo major changes
50.08 – Remove and dispose of existing cesspools or septic tanks.No major changes
2015 MASS Div 50 Changes - DtlsDetail 50-05
2015 MASS Div 50 Changes - DtlsDetail 50-07
2015 MASS Div 50 Changes - DtlsDetail 50-12 – New Internal drop connect
2015 MASS Div 50 Changes - DtlsDetail 50-14