8/19/2019 20150825 Suv Li
1/18
2015.08.25 (Tue)
Suvli P/S
1. Pump House
2015.08.25 (Tue)
Suvli P/S
1. Pump House
Existing pump was
under repair work
by end user.
2015.08.25 (Tue)
Suvli P/S
1. Pump House
No. 6 new pump
余 白
余 白
余 白
8/19/2019 20150825 Suv Li
2/18
2015.08.25 (Tue)
Suvli P/S
No. 7 new pump
2015.08.25 (Tue)
Suvli P/S
Coupling may need to be
clearned.
2015.08.25 (Tue)
Suvli P/S
Water leakage from
most of all inlet covers.
Also, much leakage from
existing pumps.
Therefore, floor drainage
pumps are critical to
carry out works in pump
room.
余 白
余 白
余 白
8/19/2019 20150825 Suv Li
3/18
2015.08.25 (Tue)
Suvli P/S
Drain sump and drainage
pumps.
Right side pump is
out of servise.
2015.08.25 (Tue)
Suvli P/S
Only left side drainage
pump is working.
Capacity is so far enough
against leaking water
amount.
Drainage pump is operated
manually.
2015.08.25 (Tue)
Suvli P/S
余 白
余 白
余 白
8/19/2019 20150825 Suv Li
4/18
2015.08.25 (Tue)
Suvli P/S
Discharge pipeline
No.8 (right end) is closed.
2015.08.25 (Tue)
Suvli P/S
Existing compensator
will be cut from the
pointed part.
2015.08.25 (Tue)
Suvli P/S
Connection point of
exisitng compensator.
余 白
余 白
余 白
8/19/2019 20150825 Suv Li
5/18
2015.08.25 (Tue)
Suvli P/S
Support of existing
compensator will be cut
as red line of the photo.
Support will be re-used.
Support beam shall be
extended.
2015.08.25 (Tue)
Suvli P/S
Existing No.8 compensator
is abandoned.
Support beam of this
compensator will be cut
and used for extension.
2015.08.25 (Tue)
Suvli P/S
New compensator
at storage.
余 白
余 白
余 白
8/19/2019 20150825 Suv Li
6/18
8/19/2019 20150825 Suv Li
7/18
2015.08.25 (Tue)
Suvli P/S
2. Compensator
Flow meter chamber
2015.08.25 (Tue)
Suvli P/S
2. Compensator
Flow meter chamber
There is gap between
pipe and chamber.
2015.08.25 (Tue)
Suvli P/S
2. Compensator
Flow meter chamber
There is gap between
pipe and chamber.
余 白
余 白
余 白
8/19/2019 20150825 Suv Li
8/18
2015.08.25 (Tue)
Suvli P/S
3. Electric room
Incoming connection point
2015.08.25 (Tue)
Suvli P/S
3. Electric room
Entrance room
2015.08.25 (Tue)
Suvli P/S
3. Electric room
Next room from entrance.
余 白
余 白
余 白
8/19/2019 20150825 Suv Li
9/18
2015.08.25 (Tue)
Suvli P/S
3. Electric room
LV & Transformer room
2015.08.25 (Tue)
Suvli P/S
3. Electric room
LV & Transformer room
2015.08.25 (Tue)
Suvli P/S
3. Electric room
HV room
余 白
余 白
余 白
8/19/2019 20150825 Suv Li
10/18
2015.08.25 (Tue)
Suvli P/S
3. Electric room
HV room
Door is very small andnot enough to carry
panels into room.
2015.08.25 (Tue)
Suvli P/S
3. Electric room
Outside cable trench
(electric room side)
2015.08.25 (Tue)
Suvli P/S
3. Electric room
Outside cable trench
(pump room side)
余 白
余 白
余 白
8/19/2019 20150825 Suv Li
11/18
2015.08.25 (Tue)
Suvli P/S
4. Storage
2015.08.25 (Tue)
Suvli P/S
4. Storage
Fence is installed.
2015.08.25 (Tue)
Suvli P/S
4. Storage
Pad lock at entrance.
余 白
余 白
余 白
8/19/2019 20150825 Suv Li
12/18
2015.08.25 (Tue)
Suvli P/S
4. Storage
Wooden boxes inside
storage are covered by
vinyl sheet.
2015.08.25 (Tue)
Suvli P/S
4. Storage
2 x 20ft containers
2015.08.25 (Tue)
Suvli P/S
4. Storage
Inside container
余 白
余 白
余 白
8/19/2019 20150825 Suv Li
13/18
2015.08.25 (Tue)
Suvli P/S
4. Storage
Inside container
2015.08.25 (Tue)
Suvli P/S
4. Storage
Lighting
Pole was existing.
Ortex prepared lamp
and cable, they said.
2015.08.25 (Tue)
Suvli P/S
4. Storage
Compensators are kept
out of strage area.
余 白
余 白
余 白
8/19/2019 20150825 Suv Li
14/18
2015.08.25 (Tue)
Suvli P/S
5. Site office
Right side container is
Kubota site office.
Container is not new,
but renovated.
2015.08.25 (Tue)
Suvli P/S
5. Site office
Room at right hand side.
2 desks, 2 chairs and
air conditioner is insatlled.
2015.08.25 (Tue)
Suvli P/S
5. Site office
Bathroom
余 白
余 白
余 白
8/19/2019 20150825 Suv Li
15/18
8/19/2019 20150825 Suv Li
16/18
2015.08.25 (Tue)
Suvli P/S
5. Site office
Bathroom
Drain of toilet isconnected.
2015.08.25 (Tue)
Suvli P/S
5. Site office
Room at left hand side.
2015.08.25 (Tue)
Suvli P/S
5. Site office
Room at left hand side.
余 白
余 白
余 白
8/19/2019 20150825 Suv Li
17/18
2015.08.25 (Tue)
Suvli P/S
6. Discharge works
Discharge pipeline.
Left side pipe is painted.(for pump No. 6 & 7)
2015.08.25 (Tue)
Suvli P/S
6. Discharge works
Flanges for air valves.
2015.08.25 (Tue)
Suvli P/S
6. Discharge works
Flange for siphon breaker
valves.
余 白
余 白
余 白
8/19/2019 20150825 Suv Li
18/18
2015.08.25 (Tue)
Suvli P/S
6. Discharge works
2015.08.25 (Tue)
Suvli P/S
6. Discharge works
Left side canal.
Concrete work is done.
2015.08.25 (Tue)
Suvli P/S
6. Discharge works
Right side canal.
Concrete work not yet done.
余 白
余 白
余 白
Recommended