32-Structural InspectionRequest Nov13 (Main Page)-A-3 · 2019-11-19 · the working days, between...

Preview:

Citation preview

Required

7.based on availability on previous permit.

8. Ready mixed concrete plants conformity

9. Cubes and Steel tests approved by Consultant.

7.based on availability on previous permit.

8. Ready mixed concrete plants conformity

9. Cubes and Steel tests approved by Consultant.

Not applicable

At the arranged time:

payment.

appointment timing, date and location.

as scheduled.

documents available to give to the agent for inspection completion.

appointment timing, date and location.

scheduled.

documents available to give to the agent for inspection completion.

at the site at the time of Inspection.

the working days, between 12am – 7am: Conducted on the same day. After working hours:

the working days, between 7am – 12am: Conducted on the next working day.

or public holidays:Conducted on the next working day.

The Contractor should cast the inspected member within one week from the date of approval: if this is not completed within the

will need to take place.

at the site at the time of Inspection.

The Contractor should cast the inspected member within one week from the date of approval: if this is not completed within the

will need to take place.

Required

7.based on availability on previous permit.

8. Ready mixed concrete plants conformity

9. Cubes and Steel tests approved by Consultant.

7.based on availability on previous permit.

8. Ready mixed concrete plants conformity

9. Cubes and Steel tests approved by Consultant.

Not applicable

At the arranged time:

payment.

appointment timing, date and location.

as scheduled.

documents available to give to the agent for inspection completion.

appointment timing, date and location.

scheduled.

documents available to give to the agent for inspection completion.

at the site at the time of Inspection.

the working days, between 12am – 7am: Conducted on the same day. After working hours:

the working days, between 7am – 12am: Conducted on the next working day.

or public holidays:Conducted on the next working day.

The Contractor should cast the inspected member within one week from the date of approval: if this is not completed within the

will need to take place.

at the site at the time of Inspection.

The Contractor should cast the inspected member within one week from the date of approval: if this is not completed within the

will need to take place.

Required

7.based on availability on previous permit.

8. Ready mixed concrete plants conformity

9. Cubes and Steel tests approved by Consultant.

7.based on availability on previous permit.

8. Ready mixed concrete plants conformity

9. Cubes and Steel tests approved by Consultant.

Not applicable

At the arranged time:

payment.

appointment timing, date and location.

as scheduled.

documents available to give to the agent for inspection completion.

appointment timing, date and location.

scheduled.

documents available to give to the agent for inspection completion.

at the site at the time of Inspection.

the working days, between 12am – 7am: Conducted on the same day. After working hours:

the working days, between 7am – 12am: Conducted on the next working day.

or public holidays:Conducted on the next working day.

The Contractor should cast the inspected member within one week from the date of approval: if this is not completed within the

will need to take place.

at the site at the time of Inspection.

The Contractor should cast the inspected member within one week from the date of approval: if this is not completed within the

will need to take place.

Required

7.based on availability on previous permit.

8. Ready mixed concrete plants conformity

9. Cubes and Steel tests approved by Consultant.

7.based on availability on previous permit.

8. Ready mixed concrete plants conformity

9. Cubes and Steel tests approved by Consultant.

Not applicable

At the arranged time:

payment.

appointment timing, date and location.

as scheduled.

documents available to give to the agent for inspection completion.

appointment timing, date and location.

scheduled.

documents available to give to the agent for inspection completion.

at the site at the time of Inspection.

the working days, between 12am – 7am: Conducted on the same day. After working hours:

the working days, between 7am – 12am: Conducted on the next working day.

or public holidays:Conducted on the next working day.

The Contractor should cast the inspected member within one week from the date of approval: if this is not completed within the

will need to take place.

at the site at the time of Inspection.

The Contractor should cast the inspected member within one week from the date of approval: if this is not completed within the

will need to take place.

Contractor engineer and consultant engineer must be at site at the time of Inspection.

The Contractor should cast the inspected member within one week from the date of approval, if this is not completed within the required time frame then a further inspec-tion will need to take place.

Passenger Hoist shall not exceed 4 floors.

The below documents must be available at site at the time of inspection:

Scaffolding Certificate from third party (if applicable)

Structural Inspection Checklist – Foundation (Form No. ZA-DC-F-11) and Slab (ZA-DC-F-12)

Confirmation Letter from soil laboratory in the foundation stage

Piling/Shoring Completion Certificate (if applicable)

Ready mixed concrete plants conformity certificate from DM

Cubes and steel tests results along with Confirmation Letter stamped and signed by consultant

Environmental Approval for swimming pool from DM (if applicable)

Notes:

https://dcca.gov.ae/wp-content/uploads/2015/05/ZA-DC-F-10-Structural-Inspection-Request.pdf

1.

2.

3.

4.

5.

6.

7.

Notes:

https://dcca.gov.ae/wp-content/uploads/2015/05/ZA-DC-F-10-Structural-Inspection-Request.pdf

Contractor engineer and consultant engineer must be at site at the time of Inspection.

The Contractor should cast the inspected member within one week from the date of approval, if this is not completed within the required time frame then a further inspec-tion will need to take place.

Passenger Hoist shall not exceed 4 floors.

The below documents must be available at site at the time of inspection:

Scaffolding Certificate from third party (if applicable)

Structural Inspection Checklist – Foundation (Form No. ZA-DC-F-11) and Slab (ZA-DC-F-12)

Confirmation Letter from soil laboratory in the foundation stage

Piling/Shoring Completion Certificate (if applicable)

Ready mixed concrete plants conformity certificate from DM

Cubes and steel tests results along with Confirmation Letter stamped and signed by consultant

Environmental Approval for swimming pool from DM (if applicable)

1.

2.

3.

4.

5.

6.

7.