View
227
Download
0
Category
Preview:
Citation preview
7/28/2019 6-81-1076 Rev 2
http://slidepdf.com/reader/full/6-81-1076-rev-2 1/7
Revised and Reissued9.06.2012
Revised and Re- i ssued
2
1 28.09.07
0 30.04.02 Issued for implementat ion
P P M M V K K
AK BKC
R J D K C DM
V C
G R R
AK G
R G
Standards Committee Standards BureauPrepared C he cke d C on v e n or Chai rman
by by Ap p ro ved by
Rev.No .
Date Purpose
aWRiefilliE N G I N E E R S5 a 015: 1egtf INDIA LIM ITED
wren eRanaw) a Gori aroma Undertalam
INSPECTION AND TEST PLANF O R
FIRE DETECTION AND ALARM SYSTEM
S TA N D A R D S PEC I F I C A TI ON N O.
6-81- 1076 R ev. 2
Page 1 of 7
a r f r f f - gm evill) aft wirrjt la trtaTur
INSPECTION AND TEST PLAN
FOR
FIRE DETECTION AND ALARM SYSTEM
Format No. 8-00-0001-F7 Rev. 0 Copyright EIL — All r ights reserved
7/28/2019 6-81-1076 Rev 2
http://slidepdf.com/reader/full/6-81-1076-rev-2 2/7
NIRzi-ei dial ENG I NEER SIdlaru I N D I A L I M I T E D
IA Goad its. unaertming)
I N S P EC T ION A N D T ES T P L A NFO R
F IRE DETECT ION AND ALARM SYSTEM
S T A N D A R D S P E C I F I C A T IO N N O .
6-81-1076 Rev . 2
Pag e 2 of 7
Abbreviations
AS
BASEEFA
BIS
CCE or CCOE
CELL
CIMFR
CE
DFT
DT
DPT
ERTL
FCRI
FMFL PHT
HICITPIP
IC
IG CIE C
JE C
L PT
Alloy Steel
British Approval Service for Electrical Equipment in Flammable
Atmospheres
Bureau of Indian Standard
Chief Controller of Explosives
Certification Engineers International Limited
Central Institute of Mning & Fuel Research
Carbon Equivalent
Dry Film Thickness
Destructive Testing
Dye Penetrate Testing
Electronics Regional Test Laboratory
Fluid Control Research Institute
Factory MutualFlame Proof
Heat Treatment
Hydrogen Induced Cracking
Inspection and Test Plan
Ingress Protection
Inspection Certification
Inter Granular Corrosion
International Electro technical Commission
Japanese Electro technical Committee
Liquid Penetrate Testing
MPT/MT
MRT
MTC
MO C
NPSH
NDT
NEMA
PD
PO
PESO
PQR
PR
PMIPV CQC
TC
TPI or TPIA
UT
UL
VDR
WPS
WPQ
XLPE
Magnetic Particle Testing
Mechanical Run Test
Material Test Certificate
Material of Construction
Net Positive Suction Head
Non Destructive Testing
National Electrical Manufacturers Association
Partial Discharge
Purchase Order
Petroleum Explosive Safety Organization
Procedure Qualification Record
Purchase Requisition
Positive Material IdentificationPoly Vinyl Chloride
Quality Control
Test Certificate
Third Party Inspection Agency
Ultrasonic Testing
Under writer Laboratories
Vendor Data Requirement
Welding Procedure Specification
Welders Performance Qualification
Cross Linked Poly Ethylene
Inspection Standards Committee
Convenor . Mr. AK. Chaudtiary
Members:
Mr. S.C. Gupta Mr. RIC Singh Mr. MP Jain (Projects)
Mr. G. Suresh Mr. Rajeev Kumar Mr. G. Poomachandra Rao
Format No. 8 -00-0001-F7 Rev . 0Copyright EIL — All rights reserved
7/28/2019 6-81-1076 Rev 2
http://slidepdf.com/reader/full/6-81-1076-rev-2 3/7
ar fal5rue INDIA UMITED(AGod d lobo UnOottalonor
I N S P EC T ION A N D T ES T P L A NF O R
F IRE DETECT ION AND ALARM SYSTEM
STANDARD SPECIF ICAT ION NO.
6-81-1076 Rev . 2
Page 3 of 7
1.0 SCOPE
This Inspection and Test Plan covers the minimum testing requirements of automatic and manual Fire Alarm System incorporating detectors, Data Gathering Fire Alarm
Panels(DGFAP.
2.0 REFERENCE DOCUMENTS
PO/PR/ Standards referred there in/Job specifications/Approved documents.
3.0 INSPECTION AND TEST REQUIREMENTS
SL
NO .STAGE/ ACTIVITY CHARACTERISTICS
QUANTUM
OF CHECKRECORD
SCOPE OF INSPECTION
SUB
SUPPLIERSUPPLIER EIL/TPIA
1.0 Procedures -- -- -- -- -- --
2.0 Material Inspection2.1 Incoming Material like
Fabricated items, PCBs,
Lamps, Push Buttons, Fire
detectors„ Temp detectors,
UV, IR Ionization type, linear
beam type and optical type
detectors, Manual call points,
Sirens, Annunciators, Relays,
Switches, Battery, battery
charger , Exit Signs, Flashing
Lights, Release and Inhibit
switches, Zener Barriers,
Circuit/fault Tcolator,Short
Visual, Dimensional, Operational checks as applicable,
Matching of detectors with given specifications,
Statutory body certification, Make of Items, etc.
100%
Sub supplier's
TC /
Supplier's Test
Records
H H/R R
etc.
3.0 In process Inspection
3.1 PCBs and other Electronic
Components
Burn-hi Test of PCBs for 96 hrs at 50 deg C100%
Supplier's Test
Records- H R
Format No. 8-00-0001-F7 Rev. 0C o p y r i g h t E I L — A l r i g h ts r e s e r v e d
7/28/2019 6-81-1076 Rev 2
http://slidepdf.com/reader/full/6-81-1076-rev-2 4/7
saRzetellENGINEERSsgza Wag -ie INDIA LIMITED
mien Rol tecnem) IA Gan of M IA U nde nak m91
INSPECTION AND TEST PLANF O R
FIRE DETECTION AND ALARM SYSTEM
STANDARD SPECIFICATION NO.
6 - 8 1 - 1 0 7 6 R e v . 2
Page 4 of 7
SL
NO .STAGE/ ACTIVITY CHARACTERISTICS
QUANT
OF CHECK
UMRECORD
SCOPE OF INSPECTION
SUB
SUPPLIEREIL/TPIAUPPLIER
4.0 Final Inspection
4.1 Conventional Fire Alarm
System consisting Central,
Zonal and Repeater Fire
Alarm Panels (Final
Inspection)
Visual check including GA, layout, Tag plates, Paint
shade, Make, Model No., Panel gasketing,
Identification and location of components ,Mmic
layout , Check of specifications of all types of
detectors w.r.t data sheets, etc
Check calibration status of all testing equipment.
Bill of material/Make of components check
Quality of lacquering and Inter changeability of
PCBs
Verification of cable termination arrangement.Operation check of scheme, Mmic lamps by
simulating fire, cable fault conditions w.r.t different
type of detectors.
Check of detector operation w.r.t loop impedance (
L, R C parameters given in data sheet for the cable)
Operation checks of scheme, mimic lamps w.r.t
different type of release and inhibit switch thro'
output relays.
Simulation of all Alarms
Auto & Manual release operation
Fail safe operationVerification of Battery type and Capacity
100% by
supplier and
on random
basis by
EIL/TPIA
Inspection
Witness
Record
- H H/W
uperation check for Break glass assembly
Operation check on applicable accessories like Exit
Signs, Beacon Lamps, Siren, Release and inhibit
switches, Short circuit/fault isolator
Provision of cable glands and earthing
Format N o. 8-00-0001-F7 Rev. 0Copyright EIL — All r ights reserved
7/28/2019 6-81-1076 Rev 2
http://slidepdf.com/reader/full/6-81-1076-rev-2 5/7
S TA N D A R D S PEC I F I C A TI ON N O.
IA WNW India um/among,
6-81-1076 Re v. 2
Page 5 of 7
I N S P EC T ION A N D T ES T P L A NF O R
F IRE DETECT ION AND ALARM SYSTEM
Ignftek fraE N G I N E E R S
* *giafflegm.INDIAUMITEDlar g e . e l e me aSJOT MO
SL
NO .STAGE/ ACTIVITY CHARACTERISTICS
QUANTUM
OF CHECKRECORD
SCOPE OF INSPECTION
SUB
SUPPLIEREIL/TPIAUPPLIER
4 .2 Computer aided Fire Alarm
System consisting of Central
Fire Alarm Panel, Data
gathering Fire alarm Panel
(DGFAP) and Repeat Fire
Alarm Panel. (Final
Inspection)
Visual check including GA, layout, Tag plates, Paint
shade, Model No , Panel gasketing, Identification and
location of components , Check of specifications of
all types of detectors w.r.t data sheets, Check of
specifications for Zener barriers ,VDU, Keyboards,
Printers etc
Bill of material/make of Component check
Verification of cable termination arrangement in
DGFAP panels
Operation check of scheme by simulating fire, cable
fault conditions w.r.t different type of detectors.Check of detector operation w.r.t loop impedance (
L, R C parameters given in data sheet for the cable)
Operation checks of scheme w.r.t different type of
release an d inhibit switch, interfacing with
suppression/clean agent systems.
Simulation of all Alarms
Auto & Manual release operation
Fail safe operation
Redundancy checks
Check of functions, commands ,reports, operator
level access, Supervisor level access on monitor,
Graphics
CFAP dovi000
EIL/TPIA
communication with all
100% bysupplier and
on random
basis by
Inspection
Witness
Record
- H/W
Changing Address of detectors
Verification of Battery type and Capacity
Calibration Check with standard calibrator, validity of
calibrator check (if applicable)
Format No. 8-00-0001-F7 Rev. 0Copyright EIL — All r ights reserved
7/28/2019 6-81-1076 Rev 2
http://slidepdf.com/reader/full/6-81-1076-rev-2 6/7
lat5 z le? dit E N G I N E E R SOgtif ialeg■IND IA L IM ITED
G.A M. Under,"^01
I N S P EC T ION A N D T ES T P L A NF O R
F IRE DETECT ION AND ALARM SYSTEM
STANDARD SPECIF ICAT ION NO.
6-81-1076 Re v. 2
Page 6 of 7
SL
NO.STAGE/ ACTIVITY CHARACTERISTICS
QUANT
OF CHECK
UMRECORD
SCOPE OF INSPECTION
SUB
SUPPLIEREIL/TPIAUPPLIER
Operation check on applicable accessories like Exit
Signs, Beacon Lamps, Siren, Release and inhibit
switches, Short circuit/fault isolator
4. 3Submission of certificates
/documents
Certificate from testing agency like ATEX, CIMFR
BASEEFA, FM/UL , PTB etc. for suitability in
specified hazardous area• A valid BIS license for indigenous supply
Statutory approval certificates from CCE/PESO for
use in specified hazardous area.
Degree of protection certificate as applicable.
Sample/Proto
type
Statutory
Approval
Certificates /
Type Test
Certificates
- H R
5.0 Painting
5.1 Painting and Packing Visual
Suitable protection to prevent entry of foreign
material.
Protection against damage during transportation
Suitable packing for outdoor storage areas with heavy
rains/high ambient temperature unless otherwise
agreed
100%
Packing list /
Supplier's
Records
- H -
6.0 Documentation and IC
Review of Internal Test Reports and MTCs.IC issuance
Supplier's Test
Records /
II.1 DUCITILLCInninni and IC - hlaWAnin
Certificate
(IC)
- H
Format No. 8-00-0001-F7 Rev. 0C o p y r i g h t E I L — A l l r ig h t s r e s e r v e d
7/28/2019 6-81-1076 Rev 2
http://slidepdf.com/reader/full/6-81-1076-rev-2 7/7
ISifizielala ENGINEERS$1 ;̂ {ar 0151egNiir INDIA L I M I TED
c.w. ) Gov l o f Wu U nde nak min
I N S P EC T ION A N D T ES T P L A NFO R
F IRE DETECT ION AND ALARM SYSTEM
S T A N D A R D S P E C I F I C A T IO N N O .
6-81-1076 Re v. 2
Page 7 of 7
Legends: H- Hold (Do not proceed without approval), Random 10% , R-Review, RW-Random witness, W- Witness (Give due notice, work may
poceedaeschedueddae
NOTES (As applicable):
Wherever W/R or H/W is indicated, Inspection Engineer shall decide the option to be exercised for the particular stage and supplier
In case of conflict between purchase specification, contract documents and ITP, more stringent conditions shall be applicable.
This document describes generally the requirements pertaining to all types of the item. Requirements specific to PO and the item are only applicable.
Acceptance Norms for all the activities shall be as per PO/PR/ Standards referred there in/ Job specifications /Approved documents
Format No. 8 -00-0001-F7 Rev . 0Copyright EIL — All rights reserved
Recommended