View
224
Download
3
Category
Preview:
DESCRIPTION
academic & professional work
Citation preview
D E S I G N PORTFOL IOMARIAH MARSHALL
Breaking up the Big Box2
Science in the City7
Documenting Cultural Landscapes-Croatia4
TABLE OF CONTENTS
Mark O. Hatfield Building1
Collaborative Life Sciences Building6
Yeon Building Office T.I.3
Urban Forest5
PRESERVATION
HOUSING
EDUCATION
MARIAH L MARSHALLe: mariah1@gmail.com p: 503.308.3222
MASTER OF ARCHITECTURE University of Oregon Portland, OR 2011 Concentration: Integration of sustainable design in existing buildings
BACHELOR OF ARTS IN ARCHITECTUREUniversity of Minnesota, Minneapolis, MN 2008 Bachelor of Arts Cum Laude Minor in Geography
EDUCATION SKILLSHAND SKETCHING & DRAWINGADOBE CREATIVE SUITEAUTOCADMICROSOFT OFFICEPHYSICAL MODEL MAKINGREVITSKETCH-UPRHINOV-RAYLASERCUTTINGNEWFORMABLUEBEAMDIGITAL FABRICATION
5+ YEARS
2 YEARS
1 YEAR
TRAVEL Historic Preservation Field School - Croatia, August - September 2010 Completed survey of traditional stone villages, buildings and water catchment systems to create architectural drawings for the Croatian Ministry of CultureArchitectural Studio in Oaxaca - Oaxaca Mexico, January-May 2007 Documentation of Spanish Colonial buildings, study of traditional adobe structures and design of a visitors center in the ruins of a Zapotec city
MARIAH L MARSHALLe: mariah1@gmail.com p: 503.308.3222
WORK EXPERIENCE
VOLUNTEER BUILDING EFFICIENCY COORDINATOR April 2011-Oct 2011Central City Concern, Portland, OR
ARCHITECTURAL INTERN Oct 2009-Dec 2009CJ Hurley Century Arts, Portland, OR
RECORDS ASSISTANT May 2007-May 2008University of Minnesota, Minneapolis, MN
SALES SUPPORT Feb 2009-Sept 2009Robert Half International, Minneapolis, MN
RESEARCH ASSISTANT May 2007-May 2008School of Architecture, University of Minnesota
Historic Preservation Field School - Croatia, August - September 2010 Completed survey of traditional stone villages, buildings and water catchment systems to create architectural drawings for the Croatian Ministry of CultureArchitectural Studio in Oaxaca - Oaxaca Mexico, January-May 2007 Documentation of Spanish Colonial buildings, study of traditional adobe structures and design of a visitors center in the ruins of a Zapotec city
INTERN ARCHITECT Nov 2011-Oct 2012SERA Architects, Portland, OR
1 THE MARK O HATFIELD BUILDINGStudying the potential for Passivhauslevel rehab in a 100 year old building housing an at risk populationCentral City ConcernPAE SERA ArchitectsWalsh ConstructionGreen Hammer
AFTERBEFORE
PROJECT BRIEF
The Mark O. Hatfield building is a case study in restoration and energy efficiency. This project proves that sustainable design and historic preservation can work together to create a better environment for the buildings tenants. Located at the intersection of Burnside and Broadway in downtown Portland, this building is owned by Central City Concern (CCC) and houses CCC clients who were previously homeless. CCC was facing a dilemma, rising energy costs were creating an unsustainable situation for the Hatfield building. Before renovations were completed in 2012 an interdisciplinary group was formed to study the ambitious goal of retrofitting the Hatfield to Passivhaus standards. I performed archival research to find a historically accurate way to re design an obsolete curtain system installed in the 1970s. Schematic designs were developed, priced and studied to understand a good, better and best scenario in regard to aesthetics, livability, cost and dramatically reducing energy use.
Project Responsibilities: -Develop Revit Model of existing conditions-Area Takeoffs-Archival research-Developed final report detailing project goals and outcomes
35% GLAZING25% GLAZING30% GLAZING
ORIGINAL FACADE
FACADE STUDIES
HISTORIC OPTION
ORIGINAL WINDOW DESIGN RESTORED
LOBBY
COMMON KITCHEN
HISTORIC SOLUTION + ENERGY EFFICIENCY
2 BREAKING UP THE BIG BOXreinventing hayden island’s big box landscape into a pedestrian friendly neighborhooduniversity of oregon
21
BREAKING UP THE BIG BOXrepurposing hayden island’s big box landscape to a pedestrian friendly neighborhooduniversity of oregon
PROJECT BRIEF
1
Located between Portland, OR and Vancouver, WA in the Columbia River, Hayden Island sits at the center of a contentious project to re-make the I-5 crossing that currently bisects the island. On the west side of the bridge the island is dominated by parking lots and big box stores, creating a vast landscape of concrete that contrasts with the nearby gated residential areas and floating homes.
The project began with an in-depth analysis of the services & business present on Hayden Island. It was abundently clear after mapping such services that Hayden Island was in need of essential services and business other than big box chain stores. This lead to the development of a light industrial program including Stumptown Coffee, a wooden kayak manufacturer and custom bike frame shop. This program is a stark contrast to the big box stores that dominate the landscape and offered a chance to re-work the landscape from the master planning to building level in one project.
12345678
1717
11
12
7
68
8
8
8
8
8
88
8
4
4
4
8
88
8
5
3
14
18
18
1818
18
18
17
17
17
171717
10
9
9
9
9
9 9
8
1
13
19 1615
15
13
13
13
13
13
13
13
CURRENT HAYDEN ISLAND BUSINESSESOregon Yacht SalesColumbia CrossingsSundance Yacht SalesSexton’s ChandleryAlder Creek KayakMcCuddy’s MarinaIsland CaféColumbia River Yacht ClubLotus Isle City parkEco CarwashCloak Renaissance HotelParadox ProductionsBarret Business ServicesOxford SuitsWells FargoRed Lion Hotel ChevronSafewayHootersNorma’s KitchenBradley’s Bar & grillMc DonaldsBJ’s Restaurant & BrewhouseDennysState Line Liquor StoreBoomers Burgers & RibsOriginal Joe’sStanford’s Restaurant & BarBrickstones Riverside Grill & BarTargetUS BankBarnes & NobleSubwayRoss Dress for LessOffice DepotFive Star LimousineAirbursh Your BodyPaul’s CigarsPace IndustriesSleep Country USABedMart Mattress WorldVideo OnlyHome DepotBurlington Home FactoryArboriculture NorthwestMarcy’s Mane Place SalonHoliday Inn ExpressNorthwest RugsCpu ServicesU-Haul24/7 Consulting & PRRrev Motor SportsLiquidation PlaceNorthwest Inflatable BoatsManheim PortlandSea Ray BoatsSchooner Creek Boat WorksJantzen Beach Mooragepetco
Conclusion : As all the essential services of a commu-nity fall within an eight mile radius of Hayden Island, our conclusion is that no or few of these service types are in critical need at this time. We feel that new development should initially be directed towards growing the resident base on the island and creating a strong retail core before investing in addi-tional basic services. More permanent and visiting people with increase demand, and eventually support more basic service pro-viders on or closer to the island. One exception might be to add a bike repair shop to the island to help promote bike transportation between Vancouver, Washington and Portland, Oregon. Current-ly, the distance between North Portland bike shop and those in Vancouver is over 6 miles. An island shop would service both commu-nity residents and commuters with issues on those 6 miles of trail.
LEGEND
EMERGENCY SERVICES1. Legacy Emmanuel Hospital2. SW Washington Medical Center (off map)3. Vancouver Police4. Portland Police(3)5. Vancouver Fire
EDUCATION6. Jefferson High School7. Faubion (Pre-Kindergarten- 8 Grade)8. Day-care Center
TRANSPORTATION9. Bike Shops (Several in North Portland 1 in Vancouver)10. Gas Station (Chevron on Hayden Island)11. MAX Stop @ Expo Center12.C-Tran & TriMet Bus Stop
BASIC SERVICES13. Grocery Store/Pharmacy(6)14. Library (Kenton)15. Dentist (Island)16. Optometrist (Island)17. Gym(8)18. Vet (6)19. Hardware (Island)
ARCH 584 MARIAH MARSHALL & MEGAN COYLE
HAYDEN ISLAND - SERVICES MAP
PROJECT BRIEF
Located between Portland, OR and Vancouver, WA in the Columbia River, Hayden Island sits at the center of a contentious project to re-make the I-5 crossing that currently bisects the island. On the west side of the bridge the island is dominated by parking lots and big box stores, creating a vast landscape of concrete that contrasts with the nearby gated residential areas and floating homes.
The project began with an in-depth analysis of the services & business present on Hayden Island. Our analysis showed it was abundantly clear that Hayden Island was in need of essential services and business other than big box chain stores & fast food restaurants.This lead to the development of a light industrial program including Stumptown Coffee, a wooden kayak manufacturer and custom bike frame shop. Utilizing the shell of an existing Burlington Coat Factory store this project explores the possibilities of reuse, sustainability and neighborhood revitalization.
BUILDING DESIGN
stumptown coffee shop & roastery
industrial/commercial
housing
mixed retail & housing
house boats
regional retail
green & park space
light rail stop
HAYDEN ISLAND - 25 YEAR VISION PLAN
C O L U M B I A R I V E R
POR TLAND
URBAN DESIGN
original burlington coat factory footprint
introduce new street for truck access
breaking down thescale of the existinglandscape
existing conditions
Hayden Island 25-year vision plan
Project Site: Existing Burlington Coat Factory Store
industrial/commercial
housing
mixed retail & housing
house boats
regional retail
green & park space
light rail stop
HAYDEN ISLAND - 25 YEAR VISION PLAN
C O L U M B I A R I V E R
POR TLAND
base new 250x250 block size on split mass
use remaining 80,000 sft of store for new light industrial programming
proposed intervention
stumptown coffee cafe & roastery
wood kayak buildercustom bike frame manufacturer* * *
BUILDING PLANPARTI DEVELOPMENT creating new program around existing walls
1 2 3 4
light court
A heat recovery system attached to roasters could create enough heat to warm entire building in winter
Rain water collection & stor-age on roof could supply entire building’s grey water need
A green roof not only aesthetically improves the large roof but plantings also provides habitat for birds and insects, extends life of roof and adds insulation value to the roof reducing cooling load
PEDESTRIAN EXPERIENCE
HEAT COLLECT GREEN
BUILDING SYSTEMS STRATEGIES
SOUTH ELEVATION - JANTZEN BEACH DRIVE
IMPROVED STREETSCAPE
3 COLLABORATIVE LIFE SCIENCES BUILDINGProfessional work for OUS/OHSUSERA ArchitectsCO Architects
Renderings: CO Architects
This highly complex and fast paced 600,000 square foot life sciences building is a collaborative effort between OHSU and the Oregon University System. I worked with SERA Architects (architect of record) and CO Architects (design architect) as a part of a large interdisciplinary Integrated Project Delivery team through multiple phases. All modeling, documentation & coordination was completed in REVIT.
Project Responsibilities-Manage, develop & coordinate door schedule of over 1000 doors with door hardware consultant-Coordinate consultant drawings through DD, CDs and CA-Worked with the lead designer, project architect and project managers implemented changes to contract documents and coordinated changes with consultants-Responsible for coordinating addenda and assembling drawing sets for printing and distribution
PROJECT BRIEF
DN
UP
DN
REF
.
REF
.
REF.
LEGEND - FLOOR PLANPREVIOUSLY PERMITTED WORK
OWNER FURNISHED
10 26 00 CORNER GUARD, 4' TYPICAL10 26 00 CRASH RAIL
CGCR
05 50 00 STEEL ANGLE CORNER GUARD TO 72" AFFSCG
SEE LF DRAWINGS
DOOR ACTUATORDACARD SWIPECS
4.1 5.1 6.1 8.1 9.1
M
L
J
H
K
A6S0231 2
A6S023 3
A6S024
1
A6S022
1
A6S022
4
2
A6A016
2
A6S0314 5
A6A03112
A6A031
4
8
A6A015
1
K 0.8
2A494B
1A494B
A6S035
1
EXAM ROOM3S043
EXAM ROOM3S045
EXAM ROOM3S047
EXAM ROOM3S049
EXAM ROOM3S071
EXAM ROOM3S073
EXAM ROOM3S075
EXAM ROOM3S077
EXAM ROOM3S079
STANDARDIZEDPATIENT
3S080
FACULTYOBSERVATION
3S082DEBRIEF3S086
TOILET3S080A
TOILET3S080BSTAFF OFFICE
3S088
CLINICAL SKILLS LAB3S092
SUPPORT3S092A
SUPPORT3S092B
DEBRIEF3S040
SERVER3S044A
MASTER CONTROL3S044
SUPPORT/PREP3S048
RECEPTION3S
OFFICE SUPPORT3S090
EXAM ROOM3S041
3S10
0
3SS0
03
3S09
2A
3S092
3S007 3S04
8A
3S04
4A
3S07
9
3S07
7
3S07
5
3S07
3
3S07
1
3S04
1
3S04
3
3S04
5
3S04
7
3S04
9
3S00
1
3S003 3S005
3S08
0A
3S080B
3S08
8
3S04
0
3S101
3S09
2B
3S04
4
3SC
002
A6S0337
6
10
9
A6S035
4
5
9
3
A6S034
3A6S034
2
1
2A6S03314
13
12
11
A6S036
1
2
A6S036
3
A6S036 45
3S080A6S0371 3
4
2
MW
TELECOM3S007
MECHANICAL SHAFT3SS003
ELEV 63SE006
ELEV 53SE005
ELECTRICAL3S001
WOMEN'S3S003
MEN'S3S005
JANITOR3S101
CORRIDOR3SC002S
CORRIDOR3SC002
CORRIDOR3SC002W
3SC002N
3S082
6
A6S037
6
5 7
A6S037
10
12
119
8
3S08
6
3SC
002W
A6S03714
5' - 0"
3S04
8B
3 3
57E157C1
50C056C157C1
57C1
56C1
50C0
57C1
54A0
54A0
54A0
57C1
57C1
57C1
52C1
57E1
57C1
57C1
56C1
51C1
56C1
57C1
50C1
50C1 56C1
59C0
50C0
532K1
59C0
59C0 51C1
51E1 59C1
1
1' - 8 3/4" 6' - 5 1/4"
2' -
6 1/
4"21
' - 1
1/4
"
12' -
6 1
/4"
13' - 1 3/4"
10' - 4"
4' -
7 1/
2"1'
- 7
3/4"
6' -
3 1/
2"
7' -
1 3/
4"
5' -
1 3/
4"7'
- 7"
6' -
11 1
/4"
6' -
7 1/
2"9'
- 6
3/4"
30"
25"
2S06
0B
1
CG
CG
CG
CG
CG
CG
3' - 10 1/4"
4' - 1
0 3/4"
1' - 2 1/4"
1
14' -
6 1/2"
13' -
2 3/4"
1' - 6
"1'
- 4 5/
8"
1' - 3
3/4"
8' - 6
"8'
- 0 1/
8"8'
- 2"
7 3/8"
8' - 7
"
1' - 3 1/8" 8' - 6" 8' - 7 3/4"
8' - 8"
8' - 8
"
1
8' - 9 5/8"
5
51C1
51C1
53K153K1
14' - 2" 9' - 3
5/8"
1' - 3
1/4"
2' - 1
1 1/4"
A150G14
A150E8
57C1
57C1
59C0
52C1
57C1
57E1
57C157C1
08 31 00 ACCESS DOORS ANDPANELS
52C1
7
SW STAIR3SS003
1' - 4
"
54C0
54A0
52C0
59C0
59C0
51C1
532K1532K1
2' - 1
0 3/4"
2' - 1 1/4"CR CR CR
CRCRCR CR
CR
54A154A1
8' - 6"
56C1
54B0
57C1
52F1
54E0
54E0
52C1 50C0
52C152C1
54C0
54A0
A15211
Sim
A80114
SIM.
A6A016D4
A80114
SIM.
A8434
06 20 00 BENCH5' - 3"
2' - 6
"
3' - 6 5/8"
1
1
1
1
2
2
5
5
A150G16
CORRIDOR3S060B
50C0
50C0
50C0
9" 10
1
12
10.1 13.1
M
L
J
K
A6S031
3
K 0.8
6
A6S035
1
EXAM ROOM3S047
EXAM ROOM3S049 EXAM ROOM
3S051EXAM ROOM
3S053EXAM ROOM
3S055EXAM ROOM
3S057EXAM ROOM
3S059
EXAM ROOM3S061
EXAM ROOM3S063
EXAM ROOM3S065
EXAM ROOM3S067
EXAM ROOM3S069
EXAM ROOM3S071
EXAM ROOM3S073
SUPPORT/PREP3S048
A103CD3
3S04
8A
3S020
3S025
3SS0
04
3S030
3S032
3S07
3
3S07
1
3S06
9
3S06
7
3S06
5
3S06
3
3S06
1
3S04
7
3S04
9
3S05
1
3S05
3
3S05
5
3S05
7
3S05
9
3S03
4
A6S034
5
4
2
A6S036
1
2
A6S036
3
A6S038 15
A6S03813
A6S038
8
6
9
7
12
11
10
14
16
17
DEAN CONF3S026STUDENT AFFAIRS
3S020
STUDENT AFFAIRSCONF3S021
ASSOC DEAN STUDENT3S025
WAITING3S018
DEAN ADMIN ASSIST3S
ACAD. ADMIN ASSIST3S
FINANCE3S030
ASSOC DEANACADEMICS
3S032
DEAN OFF3S034
CORRIDOR3SC003N
COPY3S
CORRIDOR10JJ
CORRIDOR3SC002E
CORRIDOR3SC002N
A6S038
5
A6S038
1
2
3
4
3S02
1
3S01
8
A6S039
1
A6S039
5
8
2
A6S039
3
46
7
9
A6S039 11
10
12
13
3S04
8D
3
1
56C1
56C1
57C1
52C1
57C1
57C1
57C1
57C1
57C1
56C1
56C1
50C0
57E1
57C1
51C1
56E156C1
57C1
57C1
2
3S026
57C1
56C1
2
4' -
3 1/
4"8'
- 5
1/4"
6' - 4 1/4"
7' - 5 3/4"
2' - 4 1/2"
12' -
5 1
/2"
9 1/
4"
5' -
5 3/
4"
6' - 5 1/2"4' - 2 1/4"
1
4' - 2" 3' - 2"
10' -
0"
3S04
8B
11' - 0" 9"
CG CG
CG
CG
CG
2' - 9 1/2"
5' - 8
1/4"
51F1
1' -
0 3/
4"
52C0
54C0
1' - 2
1/4"
13' -
10 1/
2"
1' - 0
1/2"
6' - 5
3/4"
6 1/4"
4' - 6 1/2"
20' - 9 1/4" 8' - 9 1/4"9
A846.31
1' - 7
"532K1
57E1
52C056C1
12 93 23 TRASH AND LITTERRECEPTORS
CR CR CR CR CR
CRCRCRCR
CR
CR
CR
CR
A846.31
UP TO 3NORTH
DN TO 2ATRIUM
EAST
A1528
Sim
08 31 00 ACCESS DOORS ANDPANELS
7' - 3 3/4"
15' - 6"
4' -
6 1/
2"
43S02
8
TR-2
10
10.1
K
1' - 4
"6'
- 2 7/
8"
1' - 4
"7'
- 1 1/
2" T
YP.
TYP.1' - 2 1/4"
1
2
3
4 A6S033
4"
DIAGNOSTICSET
DIAGNOSTICSET
5A6S033
57C157C1
57E1
57E157E1
57C157C1
57E1
3S05
1
3S05
3
57C1
5' - 2
"
WALL MOUNTEDMONITOR/KEYBOARDTRACK
9' - 2" TYP.
1' - 11 3/4" 14' - 0"
ISSUE DATE:PROJECT NO.:
CHECKED BY:
REVISIONS
Thes
e dra
wing
s and
their
conte
nt ar
e the
prop
erty
of SE
RA A
rchite
cts In
c. an
d are
to be
utiliz
ed on
this
proje
ct. R
epro
ducti
on of
any p
art o
f this
mater
ial, w
ithou
t the e
xpre
ss w
ritten
perm
ission
of S
ERA
Arch
itects
Inc.
is pr
ohibi
ted.
SER
A AR
CH
ITEC
TS C
OPY
RIG
HT
2012
PR
KEY PLAN
C D
PR
2750
S.W
. Moo
dy A
venu
eP
ortla
nd, O
rego
n 97
239
8/16
/201
2 5:
39:3
0 P
M
A103CD
08/17/1210082
PROG
RAM
AND
INTE
RIOR
S: C
ONSO
LIDAT
ED S
ETOU
S / O
HSU
CO
LLA
BO
RA
TIVE
LIF
E SC
IEN
CES
BU
ILD
ING
& O
HSU
SK
OU
RTE
S TO
WER
PLAN - LEVEL3 - AREA C&D
GENERAL NOTES - ENLARGED PLANINSTALL ONE LAYER 5/8" TYPE "X" GB AT INTERIOR FACE OF PREVIOUSLY PERMITTEDEXTERIOR WALL, SHOWN GREY (EXTENDING MINIMUM 6" ABOVE ADJACENT CEILING).
SEE A801-A807 FOR PARTITION TYPES AND DETAILS, AS SCHEDULED.
ALL KEYNOTES MAY NOT OCCUR ON THIS SHEET AND DO NOT APPLY TO ANY OTHER SHEETSEXCEPT THOSE NOTED.
SEE FIRE LIFE SAFETY DRAWINGS, G010-G114 FOR WALL RATINGS, ACCESS INFORMATION,TYPICAL ACCESSIBILITY CLEARANCES AND ADDITIONAL MOUNTING HEIGHT INFORMATION.SEE G-SERIES DRAWINGS FOR SHAFT TERMINATION ASSEMBLIE LOCATIONS, TYPICAL
SEE FINISH PLANS FOR FURTHER FINISH AND MATERIAL INFORMATION.
SEE SHEET G010 AND A150 SERIES SHEETS FOR TYPICAL ACCESSIBILITY CLEARANCES ANDMOUNTING HEIGHT INFORMATION
SEE THE ID SHEET SERIES AND SPECIFICATION DIVISION 09 00 00 FINISH MATERIAL LEGENDFOR FURTHER FINISH AND MATERIAL INFORMATION
PROVIDE BACKING PER A802 & A 804 FOR GRAB BARS, ACCESSORIES, MIRRORS, CASEWORK,LABORATORY & DENTAL CASEWORK AND EQUIPMENT, FURNITURE, & OFOI EQUIPMENT, ASREQUIRED. PROVIDE BACKING FOR MONITORS, FUTURE MONITORS, & PROJECTIONSCREENS. SEE T, LF, & D SERIES DRAWINGS FOR BACKING COORDINATION.
SEE A804 FOR ADDITIONAL BACKING INFORMATION AT VIVARIUM ONLY
SEE THE STRUCTURE AND ENVELOPE & BASEMENT AND FOUNDATION PACKAGES FORPREVIOUSLY ISSUED MATERIAL, INCLUDING (BUT NOT LIMITED TO) STRUCTURE, EXTERIORENVELOPE, STAIRS AND ELEVATORS (SHOWN GREY).
SEE LF SERIES DRAWINGS FOR LAB FURNISHINGS & GROUP 1 EQUIPMENT (SHOWN GREY)
REFERENCE 7/A820 FOR ALL FLOOR DRAINS
SEAL ALL PARTITIONS AND PENETRATIONS AS REQUIRED TO MAINTAIN SPECIFIEDPOSITIVE/NEGATIVE PRESSURE AT ROOMS. SEE MECHANICAL DRAWINGS & SPECIFICATIONS.
ALL DOORS WITH 'X' PREFIX ARE PART OF PREVIOUS SUBMITTAL STR01
A.
B.
C.
D.
E
F
G
H
J
K
L
M
N
P
SHEET NOTES - FLOOR PLANLAB AND DENTAL EQUIPMENT AND FURNISHINGS SHOWN FOR REFERENCE ONLY.
SEE D SERIES DRAWINGS FOR BALANCE OF OF SCHOOL OF DENTISTRY INFORMATION(SHOWN FOR REFERENCE ONLY).
A.
B.
KEYNOTES - 1/8" PLANS1 ALIGN2 ALIGN CENTERLINE OF WALL WITH GRID3 ALIGN CENTERLINE OF WALL WITH CENTERLINE OF MULLION4 5/8" GB, TYP. SEE GENERAL NOTE "A", PER DETAIL 7/A8045 ALIGN INSIDE FACE OF FINISH TO SLAB EDGE UNO, SEE 14/A8036 FURNISH & INSTALL VERTICAL SS TRIM CLOSER AT COOLER WALL GAPS, TYP.7 STANDPIPE CONNECTION8 OFOI EM PIPING TO ROUTE VIA RAISED FLOOR, TYP.9 ALIGN EDGE OF CATWALK W/ FLOOR JOIST10 RAISED ACCESS FLOOR11 GWB APPLIED TO COLUMN12 08 31 00 REMOVABLE PANEL - 24" x24" PANEL - INSTALL ABOVE CMU WALL AS
FRAMING ALLOWS13 LINE WALLS WITH ACOUSTIC LINING, SEE SPEC 07 21 0014 22" X 72" ACCESS PANEL. SET SILL AT 6" A.F.F.15 EPOXY COUNTERTOP & SPLASH TO MATCH LAB COUNTERS, SEE LF DRAWINGS &
SPECIFICATIONS16 12" X 12" ACCESS PANEL. SEE P SERIES DRAWINGS FOR LOCATION
COORDINATION.17 GAS SHUT-OFF VALVE, SEE P SERIES FOR LOCATION COORDINATION18 24" X 24" ACCESS PANEL. SET SILL AT 6" A.F.F.
1/8" = 1'-0" 2LEVEL 3 FLOOR PLAN - AREA C
1/8" = 1'-0" 1LEVEL 3 FLOOR PLAN - AREA D 1/2" = 1'-0" 3ENLARGED PLAN - EXAM ROOMS - LEVEL 3D 1/2"
SHARPSDISPOSAL
9
1 ADDENDUM AA 05/25/122 ADDENDUM CC 06/22/125 ADDENDUM FF 7/19/129 ADDENDUM JJ 8/3/12
10 ADDENDUM KK 8/17/12
9
CR CR
CR CR
2
10
10
10
10
COLLABORATIVE LIFE SCIENCES BUILDINGLEVEL 3 SOUTH DRAWINGS
DN
UP
DN
REF
.
REF
.
REF.
LEGEND - FLOOR PLANPREVIOUSLY PERMITTED WORK
OWNER FURNISHED
10 26 00 CORNER GUARD, 4' TYPICAL10 26 00 CRASH RAIL
CGCR
05 50 00 STEEL ANGLE CORNER GUARD TO 72" AFFSCG
SEE LF DRAWINGS
DOOR ACTUATORDACARD SWIPECS
4.1 5.1 6.1 8.1 9.1
M
L
J
H
K
A6S0231 2
A6S023 3
A6S024
1
A6S022
1
A6S022
4
2
A6A016
2
A6S0314 5
A6A03112
A6A031
4
8
A6A015
1
K 0.8
2A494B
1A494B
A6S035
1
EXAM ROOM3S043
EXAM ROOM3S045
EXAM ROOM3S047
EXAM ROOM3S049
EXAM ROOM3S071
EXAM ROOM3S073
EXAM ROOM3S075
EXAM ROOM3S077
EXAM ROOM3S079
STANDARDIZEDPATIENT
3S080
FACULTYOBSERVATION
3S082DEBRIEF3S086
TOILET3S080A
TOILET3S080BSTAFF OFFICE
3S088
CLINICAL SKILLS LAB3S092
SUPPORT3S092A
SUPPORT3S092B
DEBRIEF3S040
SERVER3S044A
MASTER CONTROL3S044
SUPPORT/PREP3S048
RECEPTION3S
OFFICE SUPPORT3S090
EXAM ROOM3S041
3S10
0
3SS0
03
3S09
2A
3S092
3S007 3S04
8A
3S04
4A
3S07
9
3S07
7
3S07
5
3S07
3
3S07
1
3S04
1
3S04
3
3S04
5
3S04
7
3S04
9
3S00
1
3S003 3S005
3S08
0A
3S080B
3S08
8
3S04
0
3S101
3S09
2B
3S04
4
3SC
002
A6S0337
6
10
9
A6S035
4
5
9
3
A6S034
3A6S034
2
1
2A6S03314
13
12
11
A6S036
1
2
A6S036
3
A6S036 45
3S080A6S0371 3
4
2
MW
TELECOM3S007
MECHANICAL SHAFT3SS003
ELEV 63SE006
ELEV 53SE005
ELECTRICAL3S001
WOMEN'S3S003
MEN'S3S005
JANITOR3S101
CORRIDOR3SC002S
CORRIDOR3SC002
CORRIDOR3SC002W
3SC002N
3S082
6
A6S037
6
5 7
A6S037
10
12
119
8
3S08
6
3SC
002W
A6S03714
5' - 0"
3S04
8B
3 3
57E157C1
50C056C157C1
57C1
56C1
50C0
57C1
54A0
54A0
54A0
57C1
57C1
57C1
52C1
57E1
57C1
57C1
56C1
51C1
56C1
57C1
50C1
50C1 56C1
59C0
50C0
532K1
59C0
59C0 51C1
51E1 59C1
1
1' - 8 3/4" 6' - 5 1/4"
2' -
6 1/
4"21
' - 1
1/4
"
12' -
6 1
/4"
13' - 1 3/4"
10' - 4"
4' -
7 1/
2"1'
- 7
3/4"
6' -
3 1/
2"
7' -
1 3/
4"
5' -
1 3/
4"7'
- 7"
6' -
11 1
/4"
6' -
7 1/
2"9'
- 6
3/4"
30"
25"
2S06
0B
1
CG
CG
CG
CG
CG
CG
3' - 10 1/4"
4' - 1
0 3/4"
1' - 2 1/4"
1
14' -
6 1/2"
13' -
2 3/4"
1' - 6
"1'
- 4 5/
8"
1' - 3
3/4"
8' - 6
"8'
- 0 1/
8"8'
- 2"
7 3/8"
8' - 7
"
1' - 3 1/8" 8' - 6" 8' - 7 3/4"
8' - 8"
8' - 8
"
1
8' - 9 5/8"
5
51C1
51C1
53K153K1
14' - 2" 9' - 3
5/8"
1' - 3
1/4"
2' - 1
1 1/4"
A150G14
A150E8
57C1
57C1
59C0
52C1
57C1
57E1
57C157C1
08 31 00 ACCESS DOORS ANDPANELS
52C1
7
SW STAIR3SS003
1' - 4
"
54C0
54A0
52C0
59C0
59C0
51C1
532K1532K1
2' - 1
0 3/4"
2' - 1 1/4"CR CR CR
CRCRCR CR
CR
54A154A1
8' - 6"
56C1
54B0
57C1
52F1
54E0
54E0
52C1 50C0
52C152C1
54C0
54A0
A15211
Sim
A80114
SIM.
A6A016D4
A80114
SIM.
A8434
06 20 00 BENCH5' - 3"
2' - 6
"
3' - 6 5/8"
1
1
1
1
2
2
5
5
A150G16
CORRIDOR3S060B
50C0
50C0
50C0
9" 10
1
12
10.1 13.1
M
L
J
K
A6S031
3
K 0.8
6
A6S035
1
EXAM ROOM3S047
EXAM ROOM3S049 EXAM ROOM
3S051EXAM ROOM
3S053EXAM ROOM
3S055EXAM ROOM
3S057EXAM ROOM
3S059
EXAM ROOM3S061
EXAM ROOM3S063
EXAM ROOM3S065
EXAM ROOM3S067
EXAM ROOM3S069
EXAM ROOM3S071
EXAM ROOM3S073
SUPPORT/PREP3S048
A103CD3
3S04
8A
3S020
3S025
3SS0
04
3S030
3S032
3S07
3
3S07
1
3S06
9
3S06
7
3S06
5
3S06
3
3S06
1
3S04
7
3S04
9
3S05
1
3S05
3
3S05
5
3S05
7
3S05
9
3S03
4
A6S034
5
4
2
A6S036
1
2
A6S036
3
A6S038 15
A6S03813
A6S038
8
6
9
7
12
11
10
14
16
17
DEAN CONF3S026STUDENT AFFAIRS
3S020
STUDENT AFFAIRSCONF3S021
ASSOC DEAN STUDENT3S025
WAITING3S018
DEAN ADMIN ASSIST3S
ACAD. ADMIN ASSIST3S
FINANCE3S030
ASSOC DEANACADEMICS
3S032
DEAN OFF3S034
CORRIDOR3SC003N
COPY3S
CORRIDOR10JJ
CORRIDOR3SC002E
CORRIDOR3SC002N
A6S038
5
A6S038
1
2
3
4
3S02
1
3S01
8
A6S039
1
A6S039
5
8
2
A6S039
3
46
7
9
A6S039 11
10
12
13
3S04
8D
3
1
56C1
56C1
57C1
52C1
57C1
57C1
57C1
57C1
57C1
56C1
56C1
50C0
57E1
57C1
51C1
56E156C1
57C1
57C1
2
3S026
57C1
56C1
2
4' -
3 1/
4"8'
- 5
1/4"
6' - 4 1/4"
7' - 5 3/4"
2' - 4 1/2"
12' -
5 1
/2"
9 1/
4"
5' -
5 3/
4"
6' - 5 1/2"4' - 2 1/4"
1
4' - 2" 3' - 2"
10' -
0"
3S04
8B
11' - 0" 9"
CG CG
CG
CG
CG
2' - 9 1/2"
5' - 8
1/4"
51F1
1' -
0 3/
4"
52C0
54C0
1' - 2
1/4"
13' -
10 1/
2"
1' - 0
1/2"
6' - 5
3/4"
6 1/4"
4' - 6 1/2"
20' - 9 1/4" 8' - 9 1/4"9
A846.31
1' - 7
"
532K1
57E1
52C056C1
12 93 23 TRASH AND LITTERRECEPTORS
CR CR CR CR CR
CRCRCRCR
CR
CR
CR
CR
A846.31
UP TO 3NORTH
DN TO 2ATRIUM
EAST
A1528
Sim
08 31 00 ACCESS DOORS ANDPANELS
7' - 3 3/4"
15' - 6"
4' -
6 1/
2"
43S02
8
TR-2
10
10.1
K
1' - 4
"6'
- 2 7/
8"
1' - 4
"7'
- 1 1/
2" T
YP.
TYP.1' - 2 1/4"
1
2
3
4 A6S033
4"
DIAGNOSTICSET
DIAGNOSTICSET
5A6S033
57C157C1
57E1
57E157E1
57C157C1
57E1
3S05
1
3S05
3
57C1
5' - 2
"
WALL MOUNTEDMONITOR/KEYBOARDTRACK
9' - 2" TYP.
1' - 11 3/4" 14' - 0"
ISSUE DATE:PROJECT NO.:
CHECKED BY:
REVISIONS
Thes
e dra
wing
s and
their
conte
nt ar
e the
prop
erty
of SE
RA A
rchite
cts In
c. an
d are
to be
utiliz
ed on
this
proje
ct. R
epro
ducti
on of
any p
art o
f this
mater
ial, w
ithou
t the e
xpre
ss w
ritten
perm
ission
of S
ERA
Arch
itects
Inc.
is pr
ohibi
ted.
SER
A AR
CH
ITEC
TS C
OPY
RIG
HT
2012
PR
KEY PLAN
C D
PR
2750
S.W
. Moo
dy A
venu
eP
ortla
nd, O
rego
n 97
239
8/16
/201
2 5:
39:3
0 P
M
A103CD
08/17/1210082
PROG
RAM
AND
INTE
RIOR
S: C
ONSO
LIDAT
ED S
ETOU
S / O
HSU
CO
LLA
BO
RA
TIVE
LIF
E SC
IEN
CES
BU
ILD
ING
& O
HSU
SK
OU
RTE
S TO
WER
PLAN - LEVEL3 - AREA C&D
GENERAL NOTES - ENLARGED PLANINSTALL ONE LAYER 5/8" TYPE "X" GB AT INTERIOR FACE OF PREVIOUSLY PERMITTEDEXTERIOR WALL, SHOWN GREY (EXTENDING MINIMUM 6" ABOVE ADJACENT CEILING).
SEE A801-A807 FOR PARTITION TYPES AND DETAILS, AS SCHEDULED.
ALL KEYNOTES MAY NOT OCCUR ON THIS SHEET AND DO NOT APPLY TO ANY OTHER SHEETSEXCEPT THOSE NOTED.
SEE FIRE LIFE SAFETY DRAWINGS, G010-G114 FOR WALL RATINGS, ACCESS INFORMATION,TYPICAL ACCESSIBILITY CLEARANCES AND ADDITIONAL MOUNTING HEIGHT INFORMATION.SEE G-SERIES DRAWINGS FOR SHAFT TERMINATION ASSEMBLIE LOCATIONS, TYPICAL
SEE FINISH PLANS FOR FURTHER FINISH AND MATERIAL INFORMATION.
SEE SHEET G010 AND A150 SERIES SHEETS FOR TYPICAL ACCESSIBILITY CLEARANCES ANDMOUNTING HEIGHT INFORMATION
SEE THE ID SHEET SERIES AND SPECIFICATION DIVISION 09 00 00 FINISH MATERIAL LEGENDFOR FURTHER FINISH AND MATERIAL INFORMATION
PROVIDE BACKING PER A802 & A 804 FOR GRAB BARS, ACCESSORIES, MIRRORS, CASEWORK,LABORATORY & DENTAL CASEWORK AND EQUIPMENT, FURNITURE, & OFOI EQUIPMENT, ASREQUIRED. PROVIDE BACKING FOR MONITORS, FUTURE MONITORS, & PROJECTIONSCREENS. SEE T, LF, & D SERIES DRAWINGS FOR BACKING COORDINATION.
SEE A804 FOR ADDITIONAL BACKING INFORMATION AT VIVARIUM ONLY
SEE THE STRUCTURE AND ENVELOPE & BASEMENT AND FOUNDATION PACKAGES FORPREVIOUSLY ISSUED MATERIAL, INCLUDING (BUT NOT LIMITED TO) STRUCTURE, EXTERIORENVELOPE, STAIRS AND ELEVATORS (SHOWN GREY).
SEE LF SERIES DRAWINGS FOR LAB FURNISHINGS & GROUP 1 EQUIPMENT (SHOWN GREY)
REFERENCE 7/A820 FOR ALL FLOOR DRAINS
SEAL ALL PARTITIONS AND PENETRATIONS AS REQUIRED TO MAINTAIN SPECIFIEDPOSITIVE/NEGATIVE PRESSURE AT ROOMS. SEE MECHANICAL DRAWINGS & SPECIFICATIONS.
ALL DOORS WITH 'X' PREFIX ARE PART OF PREVIOUS SUBMITTAL STR01
A.
B.
C.
D.
E
F
G
H
J
K
L
M
N
P
SHEET NOTES - FLOOR PLANLAB AND DENTAL EQUIPMENT AND FURNISHINGS SHOWN FOR REFERENCE ONLY.
SEE D SERIES DRAWINGS FOR BALANCE OF OF SCHOOL OF DENTISTRY INFORMATION(SHOWN FOR REFERENCE ONLY).
A.
B.
KEYNOTES - 1/8" PLANS1 ALIGN2 ALIGN CENTERLINE OF WALL WITH GRID3 ALIGN CENTERLINE OF WALL WITH CENTERLINE OF MULLION4 5/8" GB, TYP. SEE GENERAL NOTE "A", PER DETAIL 7/A8045 ALIGN INSIDE FACE OF FINISH TO SLAB EDGE UNO, SEE 14/A8036 FURNISH & INSTALL VERTICAL SS TRIM CLOSER AT COOLER WALL GAPS, TYP.7 STANDPIPE CONNECTION8 OFOI EM PIPING TO ROUTE VIA RAISED FLOOR, TYP.9 ALIGN EDGE OF CATWALK W/ FLOOR JOIST10 RAISED ACCESS FLOOR11 GWB APPLIED TO COLUMN12 08 31 00 REMOVABLE PANEL - 24" x24" PANEL - INSTALL ABOVE CMU WALL AS
FRAMING ALLOWS13 LINE WALLS WITH ACOUSTIC LINING, SEE SPEC 07 21 0014 22" X 72" ACCESS PANEL. SET SILL AT 6" A.F.F.15 EPOXY COUNTERTOP & SPLASH TO MATCH LAB COUNTERS, SEE LF DRAWINGS &
SPECIFICATIONS16 12" X 12" ACCESS PANEL. SEE P SERIES DRAWINGS FOR LOCATION
COORDINATION.17 GAS SHUT-OFF VALVE, SEE P SERIES FOR LOCATION COORDINATION18 24" X 24" ACCESS PANEL. SET SILL AT 6" A.F.F.
1/8" = 1'-0" 2LEVEL 3 FLOOR PLAN - AREA C
1/8" = 1'-0" 1LEVEL 3 FLOOR PLAN - AREA D 1/2" = 1'-0" 3ENLARGED PLAN - EXAM ROOMS - LEVEL 3D 1/2"
SHARPSDISPOSAL
9
1 ADDENDUM AA 05/25/122 ADDENDUM CC 06/22/125 ADDENDUM FF 7/19/129 ADDENDUM JJ 8/3/12
10 ADDENDUM KK 8/17/12
9
CR CR
CR CR
2
10
10
10
10
4 SCIENCE IN THE CITYa new science education center for oregon educatorsuniversity of oregon
PROJECT BRIEF
Every city in the world has spaces that are underutilized, ignored, or even unknown. This project proposes a way to humanize the scale of one such space beneath the freeway. The design reinterprets the monumental flowing geometry of the freeway down to the scale of the building. The site is currently a parking lot adjacent to OMSI’s exhibit building shop and is partially covered by I-5.
The building masses take their form from the shapes created between the freeway columns and the curving geometry of the roadways above. Curving forms are then used throughout the building to guide people along, through and over spaces. A highly transparent curtain walls allows a visual connection between the buildings and the freeway columns and the roadway becomes a secondary structure hovering above and around each building.
SITE CONDITIONS
concept sketch: creating place beneath infrastructure
existing site conditions
RIPARIAN EDGE WILLAMETTE RIVER
INTERNATIONAL INFRASTRUCTURE
I-5
REGIONALLY SIGNIFICANT WORKING WATERWAY
LOCAL HABITAT
INTEGRATING FLOWS WITH SITE
CONTEXTUAL FLOWS
BUILDING ORGANIZATION
SE CLAY ST
SE W
ATER
AVE
GROUND LEVEL - NORTH1 SECONDARY ENTRANCE2 RESTROOMS3 AUDITORIUM4 LIBRARY5 TERRACE6 LIBRARY SUPPORT
GROUND LEVEL - SOUTH1 MAIN ENTRY2 ASSEMBLY ROOM3 STORAGE4 CAFETERIA5 LABS6 RESTROOMS7 OFFICES8 STAIR TO LINK WITH NORTH BUILDING9 EXHIBIT HALL
N
1
23
4
56
7
8
9
1
2
34
5
6
2ND LEVEL - NORTH1 EXHIBIT SPACE2 2ND LEVEL ENTRANCE TO AUDITORIUM3 LIBRARY - INDIVIDUAL STUDY ROOMS, COMPUTER LAB & STACKS4 TERRACE
2ND LEVEL - SOUTH1 SCIENCE KIT CHECK OUT2 CLASSROOMS3 REST ROOMS4 VIDEO CONFERENCE RM
1
2
34
1
23
4
N
1
2
3
N
THIRD LEVEL - NORTH1 OFFICE2 RESTROOMS3 KITCHENETTE
THIRD LEVEL - SOUTHROOF
MAIN ENTRY
NORTH/SOUTH SECTION
SO
FT
RU
SH
SL
OU
GH
SE
DG
E
CR
EE
PIN
G S
PIK
E
PO
PL
AR
I-5
NO
RT
H/S
OU
TH
PO
RT
LA
ND
BO
ATH
OU
SE
DE
NS
E S
ED
GE
SM
AL
L F
RU
ITE
D
BU
LR
US
H
OR
EG
ON
AS
H
BIK
E L
AN
E
OM
SI
EX
HIB
IT S
HO
P
1. Interior Glazing2. Upper Operable Ventilation3. Maintenance Catwalks4. Structural Frame (Ladder Truss)
DOUBLE FACADE DETAIL
6543
1
2
7
5. Moveable Sun Shading6. Exterior Glazing7. Lower Operable Ventilation
ENVIRONMENTAL CONTROLS: INTEGRATED SHADING & DAYLIGHTING
8:00 AM
12:00 PM
4:00 PM
JUNE 21
N
S
EW
8:00 AM
12:00 PM
4:00 PM
8:00 AM
12:00 PM
4:00 PM
DECEMBER 21
N
S
EW
8:00 AM
12:00 PM
4:00 PM
DAYLIGHTING summer
DAYLIGHTING winter
ENVIRONMENTAL CONTROLS: INTEGRATED SHADING & DAYLIGHTING
NORTH BUILDING - LIBRARY IN SUMMER
NORTH BUILDING - ATRIUM IN WINTER
EAST WEST SECTION
5 YEON BUILDING T.I.The 2nd floor of the historicYeon Building in downtown Portland is transformed for Flight StatsSERA Architects
PROJECT BRIEF
The Yeon Building is located at the corner of 5th Avenue & Alder street in the heart of downtown Portland. SERA Architects completed a renovation of the 15 story building in 2012. I worked with a project architect and interior designer to complete a remodel of the 2nd floor for Flight Stats a company that provides real time flight information to travelers. This company embraced the idea of an open office that maintained historic details and clean modern design details. A new kitchen area was designed beneath a skylight that had been painted over since World War II. The two level office now has a fresh modern look while taking advantage of the building’s historic architectural attributes.
Project Responsibilities-Created permit set in Revit-Created conceptual renderings to show furniture options and colors-Casework details-Modeled stair & drafted custom details in conjunction with structural engineer
6 DOCUMENTING CULTURAL LANDSCAPES - CROATIAdocumentation of stone structures on croatia’s dalmation coastuniversity of oregon
During the Summer of 2010 I spent a month in Croatia with a group from the University of Oregon Historic Preservation Program surveying stone villages on the Island of Drvenik Veli. The project was completed in conjunction with the Croatian Ministry of Culture and produced scale drawings of stone houses, cisterns, site plans & diagrams of water collection methods used by the village’s previous inhabitants. Our work was displayed and presented to officials from the Ministry of Culture and given to them to be used in future projects to preserve the unique cultural landscape of Drvenik Veli. Our work was also meant to help the small island community understand the importance of the historic resource present on their island. My work specifically focused on communicating the different village arrangement types based on their ethnographic descriptions provided to us by an ethnographer from the Ministry of Culture.
PROJECT BRIEF
RUSINOVIC B
BRDA
KACINA
DRVENIK VELI
RUSINOVIC B
BRDA
KACINA
DRVENIK VELI
VILLAGE DOCUMENTATION
BRDA
SCAT
TER
CLU
STER
STRE
ET
SCATTER
CLUSTER
STREETThe village of Brda, situated on a hill east of the parish church of Drvenik Veli, is organized along a central path running in an east west direction. The buildings are organized closely along the main path thus giving Brda its ethnographic classification as a “street” village type. Large animal stalls (dvori) located at the west and east ends are indications that the village economy depended heavily upon raising livestock.
Ručinović B was documented last year by students from the University of Oregon and is classified as a “cluster” village. Similar to the Brda in that structures are closely aligned to a main path, Rušinović is different because homes, kitchens, animal stalls, storage and work areas are closely clustered instead of separated as in Brda.
Kačina is located on the western side of Drvenik Veli and is described as a “scattered” village type. Clusters of several structures are distributed across the site and connect to the village by secondary paths. Cisterns are located within close proximity to structural groupings.
7 URBAN FORESThigh density housing for gresham, oregon sustainable cities initiative team: mariah marshall, rachel bailey & dustin fosteruniversity of oregon
courtyard habitats
This project proposed a Transit Oriented Development on an empty lot adjacent to a new MAX Train stop in Gresham, Oregon. The Urban Forest concept involves arranging multi-family transit oriented housing around lush courtyards that are designed to attract birds, pollinators and other species to create a dynamic living landscape for people, plants and animals. 50 foot tall pines line the site to the west and our group was inspired by their scale and to push the project vertically to eight stories to achieve more density on less land.
PROJECT BRIEF
site plan
SITE ORGANIZATION
site: gresham, oregon
typical unit
typical unit plans
typical unit
typical unit
east/west section
BUILDING ORGANIZATION
north/south section
INTEGRATED HABITATS: HUMAN+ANIMAL+PLANT
MARIAH MARSHALL p: 503.308.3222 e: mariah1@gmail.com
Recommended