Bond Construction Update Citizens Oversight Committee. Long Beach Community College District April 18, 2011. EDUCATE ENGAGE EMPOWER. Agenda. Completed Construction Projects LAC Parking Structure LAC Building O Complex PCC Walnut Ave. Arrival Court District Wide – Monument Signs - PowerPoint PPT Presentation
Citation preview
Bond Construction Update
Citizens Oversight Committee
Bond Construction Update
Citizens Oversight Committee
Long Beach Community College District April 18, 2011
EDUCATE ENGAGE EMPOWER 1
Agenda
Completed Construction Projects LAC Parking Structure LAC Building O Complex PCC Walnut Ave. Arrival Court District Wide – Monument Signs
Current Construction Projects LAC Building A – Student Services Retrofit LAC Infrastructure Improvements Project and District Wide –
Energy Efficiency Project LAC Building I (Bookstore) LAC South Walkway Extension LAC W Trailers Demo LAC Master Landscape PCC MDAB (Multi-Disciplinary Academic Building) PCC Tech1 (Sheet Metal)
Upcoming Construction Projects PCC Building CC Retrofit
Q & A
2
Completed Construction ProjectsLAC Parking Structure – Measure E 2008
3
Spaces for 893 vehicles Solar generation system is commissioned and
operational Project is complete and being used for student parking
Completed Construction ProjectsLAC Building O Complex – Measure E 2008
4
Two structures totaling 87,000 square feet Occupants for Building O2 are Foundation, ERD, LBNP and
ALCI IITS and BMT are moved in, Warehouse Facility moving Project is complete with some punch walk items left
Completed Construction Projects
5
UU/VV demo completed Site converted to a parking lot April 4th, 2011
PCC Walnut Ave. Arrival Court - Measure E 2008
Completed Construction ProjectsDistrict Wide – Monument Signs
Measure E 2008
6
District Wide Monument Signs Locations:
LAC-Clark/Conant – completed January 8, 2011 PCC-20th/Walnut Ave. – Completed March 30, 2011
Installation of building designators for LAC Bldg. O1 and O2 completed
LAC Bldg. Designator LAC Monument SignPCC Monument Sign
Current Construction ProjectsLAC Building A – Student Services Retrofit
Measure E 2008
7
New home for A&R, Counseling, Health Services, Cashier, Transfer Center
Project currently in demolition and structure upgrade
Construction fence and temporary walkways complete
End of construction anticipated Summer 2012
8
LAC Infrastructure Improvement Project and District Wide Energy Efficiency Project Measure E 2008
Current Construction Projects
Total annual estimated savings of 1.5 mil. Kwh Project started Fall 2009; currently hydro seeding all
affected areas(All phases) Majority of existing building HVAC systems to be
upgraded and connected to the Central Plant Buildings C,D, G,H, & J are connected Buildings B and E will be scheduled by end of April
Exterior lighting and controls upgrades All parking lots north of Lew Davis are on new system
New Reclaimed Water tie-ins to irrigation connected New gas lines installed for Buildings B, C, D, E, G, H, J, M,
N, and P New domestic lines installed for Buildings B, C, D, E, F, G,
H, I Trailers, J, K,L, M, N, P Anticipated end of construction Winter 2011
Current Construction Projects
9
Adds additional 4,000 square feet to existing building Architecture to match LAC Mediterranean Theme G2K Construction working on demolition and utilities End of Construction anticipated Fall 2011
LAC Building I - Measure E 2008
Current Construction ProjectsLAC South Walkway Extension
Measure E 2008
10
99% complete Palm trees to be replaced May 2011 Continues Master Plan pedestrian corridor
Current Construction Projects
11
Green Giant Construction has removed old W trailers Grading of lot to commence in this month Project will address storm run off issues with bio swales Site to be converted to a parking lot Estimated project completion Summer 2011
LAC W Trailers Demo - Measure E 2008
Current Construction Projects
12
Currently in Design Phase Quad areas North and South areas of Bldg. A bid Winter 2012 Remaining areas designed at 25% Scope includes new hardscape/landscape and pedestrian
pathways
LAC Master Landscape - Measure E 2008
Current Construction ProjectsPCC MDAB
(Multi-Disciplinary Academic Building)Measure E 2002 and 2008
13
MDAB building remodel project Phase 1 of 2 currently under construction Project currently in demolition and structural reinforcement Phase 1 Project to be completed Summer 2012
Current Construction Projects
14
Currently in bid process Construction to start Summer 2011 Projected to be completed before Fall 2011
PCC Tech 1 (Sheet Metal) - Measure E 2008
Upcoming Construction ProjectsPCC Building CC Retrofit - Measure E 2008
15
Houses the Fitness Center, Gymnasium, Weight Room, and Faculty and Staff Offices
Swing space located on PCC Campus (Bldg. GG) Approved by DSA on 1/27/11. Currently in bid process To be completed concurrently with MDAB project phase 1 Anticipated end of construction 2012
l i b
e r
a l
a r
t s
Liberal Arts CampusSite Plan
p a
c i f
i c
c
o a
s t
Pacific Coast CampusSite Plan
QUESTIONS&
ANSWERS
EDUCATE ENGAGE EMPOWER 18