Massaro

Bethel Park High SchoolBethel Park, PA

Weekly progress slide show

January 14,2009

Massaro

Walls Continue in Area C

Massaro

Along With The Footing

Foundations!

Massaro

Backfill of Storm Piping

Massaro

Progress Being Made in Several

Areas!

Massaro

Forms Pile Up As Poured Walls Are

Stripped

Massaro

Scheduled work for next few

weeks:• Continue site storm systems items.

• Building foundations and wall forming.

• Excavation of areas D,G, and H.

• Continue stock pile and soil stabilization items for back fill operations.

• Masonry foundation work to stage.

• Underground building MEP items.

• Steel Fabrication.

Massaro