Canal Ponds Site Summ - Home - NEXTGEN Power...

Preview:

Citation preview

CanalPondsSiteSummary(PVMDF)

Thereisapproximately5,330sq.ft.ofunusedfloorspace,excludingstandardaccessareaandaisles;unusedfloorareaincludingaccessandaisleareas=~8,500sq.ft.;excludingthewastetreatmentroomsjustbuiltasapartofPVMDFproject.Thetworoomsaddanadditional2,200sq.ft.ofspacethatcouldbeutilizedforfurtherdevelopment,eitherproductionorfacilitiessupport.ThelabspaceinSEsectionofthebuildingwouldbeavailableforsupportservicespacewithanadditional4,300sq.ft.ofspace.

Expansionatthesitebeyondthecurrentfootprintislimitedtoapproximately20,000sq.ft.onthesouthernsideoftheproperty(theexistinggrassareabetweenthebuildingandtheparkinglot).

Siteutilities:Asummarysheetofthecurrentutilitiescapacitiesisattached.

Attachments:BuildingmapwithavailablespaceSitepropertymapSiteutilitiessummary

CanalPondsBuildingMap:AvailableSpace

CanalPondsSiteUtilitiesSummary

Electricaldistribution• 4.2MWavailablepoweratthesite

Backupemergencygenerator• Caterpillar#D-150-8,Dfordiesel,150for150KW• Redundantpadandconductplaceforfutureexpansion

Boilers/Lowpressuresteam

• Fultonboilerlowpressuresteam• Five(5)gasfurnacesusedfordomestichotwater;200,000BTU/hr

Chilledwater

• 300tonTranecentrifugalchillerwithroofmountedtower,indoorsump,chillerwaterpumps,towerpumps,condenserpumps,circulationfilterunit,andaleasedwatertreatmentsystem

• 300tonMcQuaysircooledreciprocatingchillero Repairneeded

• ChilledwaterexpansionreportcompletedaspartofconstructioninQ42014.

Nitrogen• 900gallontank

Processvacuum• Lowandhighvacuumsystems(25”Hgand5”Hg)

RO/DIWater

• HighpuritywatersystemthatrequiresaROmaker;DIwatersystemispresent• QuotedevelopedforthisupgradeaspartofPVMDFconstructionwithEvoquaWaterSystems

WastewaterPre-treatmentSystem

• Thereisnopre-treatmentsysteminplace;aquotewasdevelopedspecifictothePVMDFcapacityandtreatmentneedsthatwouldneedtobere-evaluatedwhenthedevelopmentcontinues

CleanroomExhaust

• Generalexhaust:capacity• ScrubbedExhaust:capacity

o ScrubbedhasbeenplacedbutnothookedupatthistimeCompressedair

• Cleandryair,redundantsystem;AtlasCopcounits

Naturalgas• 10inchfeed

Domesticwater• 10inchmain;80psi

SewerCapacity• 6inchmain

AirHandling

• Cleanroombuildoutdataforproductionarea

BMS • AutoMatrixDDCBMSsysteminplace;upgradesneededtosupporttheconstructionchanges;

notimplementedatthistime.• BMSmatrixwasdevelopedasapartofthePVMDFconstructionproject;notimplementedat

thistime.

FireSystem• Simplex4100 • MonitoringisonUPSpowerwithbatteryback-up • 100%Fullysprinklered(wet) • Risersystem

Security• Camerasystemandbadgingsystemarebeinginstalled;byQ22015

TGM • TGMmatrixwasdevelopedasapartofthePVMDFconstructionproject;notimplementedat

thistime.

EnvironmentalPermitting• PhaseIEnvironmentalSiteAssessmentcompletedin2013

• Permittingreviewcompletedforthecurrentoperations;noneedforair,water,orhazardouswastepermittingwiththecurrentusage

• Updateneededwhennextphasebegins.BuildingCode

• Zonedforgeneralindustry• OccupancyRatings

o A(commonarea)o B(laboratory)o H4&H5(manufacturing)

• Fullysprinklered(wetsystem)

Recommended