8/7/2019 Central London Offices MarketView_Q12010
1/12
aa
MarketView
Central London OfficesQ1 2010
CB RICHARD ELLIS
Quick Stats
Q1 09
2010, CB Richard Ellis, Inc.
Quarter at a Glance
Availability
Rental Values
Construction Starts
Yields
Take-up
Q4 09
Changes from
Near record levels of take-up inthe City and above average take-
up in the West End and theDocklands resulted in CentralLondon take-up racing past itslong-term average. Inevitably, thestrong tenant demand producedsharp reductions in supply. As themarket balance tips towards thelandlord, prime rents rose acrossall markets while rent free periodswere reduced.
OVERVIEW
Central London take-up strengthenedCentral London transaction levels were above average for the second quarter insuccession. At 4.4m sq ft, take-up for the first quarter was the highest in nearlythree years. The City accounted for 50% of Central London take-up as transactionlevels reached a near record 2.2m sq ft, while take-up in the West End and theDocklands was above the long-term average.
Supply squeeze continuedWith strong demand, supply conditions in Central London continued to ease andended the quarter at 16.7m sq ft. This pushed vacancy rates lower, the CentralLondon rate was 6.7%, assisted by falls to the City and the West End rates. Bycomparison, the vacancy rate in the other Central London markets edged up
slightly.
Prime rents continued to growThe recovery in prime rents over the last year has been quite remarkable. Rents inCentral London are still 4% lower than a year ago, according to the CB RichardEllis prime rent index; however, on a quarterly basis the Central London prime rentindex was 6% higher. These trends are reflected in prime rents which rose over thequarter to 47.00 per sq ft in the City and 85.00 per sq ft in the West End.
Completion levels expected to declineWith 2009 marking the peak of the development cycle, development completionsare expected to decline this year with only 4.1m sq ft of developments expected to
complete in 2010, compared with 6.5m sq ft last year. Only 1.3m sq ft ofcompletions are scheduled for 2011, which would make it the lowest level onrecord.
Transactions total dipped but yield compressed continuedCentral London transaction levels at 1.2bn were lower in the first quarter of 2010compared with the last quarter. However, it was the lack of stock that was theprimary factor behind the weaker first quarter as strong investor interest pushedyields lower. As a result, prime yields moved to 5.75% in the City and 4.5% in theWest End.
-40
-30
-20
-10
0
10
20
30
40
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
%Year-on-YearGrowth
City
West End
Central London
Central London Rent Index Annual Growth
8/7/2019 Central London Offices MarketView_Q12010
2/12
aQ12010
MarketView
Centra
lLondonOffices Central London Take-up
Sector Structure of Central London Take-up, 2010Q1
Central London Availability
2010, CB Richard Ellis, Inc.
Page 2
Central London
Headlines
Take-up reached an above average 4.4m sq ftVacancy rate fell to 6.7%Prime rent index rose 6% over the quarter
There has been a remarkable turnaround in the
Central London office market from a year ago.Take-up for the first quarter was 4.4m whichcompares with 1.1m sq ft for the same quarter lastyear. Some 70% of take-up was of grade A space,while 58% was secondhand with 37% newlycompleted space.
The City market has been the main driving forcebehind this performance, although take-up in theWest End and Docklands was also above the long-term average.
In total there were nine deals over 100,000 sq ft inCentral London in the first quarter. In the largestdeal, Barclays took 346,000 sq ft at 20 CabotSquare, E14. In the City the largest deals were atDrapers Gardens, EC2 where BlackRock took270,600 sq ft and Ropemaker, EC2 whereMacquarie took 212,400 sq ft. The largest deal inthe West End saw the Aegis Group lease 117,400 sqft at 1 Regents Place.
Banking and finance accounted for 40% of take-upwhich is significantly higher than the long-termaverage of 29%. The next best performing sectorwas professional services which accounted for 17%of take-up on a par with the sectors long-termaverage. At 14% business services was the third bestperforming sector; however, this was below its long-term average of 18%.
The high level of take-up, which has been a featureof the market in recent months, has been fuelled bya combination of pent up demand from the creditcrunch as well as some opportunistic demand takingadvantage of low rents and generous incentives.Looking further ahead, demand will be tied to
economic prospects. The outlook for 2010 is quitemixed. Although the recession ended in the lastquarter of 2009 when output grew by 0.4%, the bestoutlook for the year ahead is growth of around 2%.The UK is expected to grow more rapidly thereafter.Although it will be some time before theimprovement in the economy feeds through toemployment and eventually to occupationaldemand.
0.0
1.0
2.0
3.0
4.0
5.0
6.0
2001Q1
2001Q4
2002Q3
2003Q2
2004Q1
2004Q4
2005Q3
2006Q2
2007Q1
2007Q4
2008Q3
2009Q2
2010Q1
millionsqft
Secondhand New Completed Pre-let
14%6%
3%
12%
17%
3%5%
40%
Banking & Finance
Business Services
Manufacturing,
Industrial & EnergyInsurance
Public Sector
Professional
Consumer Services &
Leisure
Computers / Hi-Tech
0
5
10
15
20
25
30
2001Q1
2001Q4
2002Q3
2003Q2
2004Q1
2004Q4
2005Q3
2006Q2
2007Q1
2007Q4
2008Q3
2009Q2
2010Q1
millionsqft
Secondhand New Completed New Under Construction
8/7/2019 Central London Offices MarketView_Q12010
3/12
Q12010
MarketView
CentralLondonOffices
Vacancy Rate Annual: Ready-to-occupy Space
Central London Offices Under Construction
20 Cabot Square,E14
346,000Barclays Bank
Drapers Gardens
EC2
270,600BlackRock
Ropemaker, EC2212,400Macquarie
30 Crown Place,EC2
181,700Pinsent Masons
10 Upper BankStreet, E14
135,300LOCOG
AddressSq ftOccupier
Key Transactions, 2010 Q1
Page 3
2010, CB Richard Ellis, Inc.
0
2
4
6
8
10
12
14
16
18
1984
1986
1988
1990
1992
1994
1996
1998
2000
2002
2004
2006
2008
2010
%
Central London 6.7
City 7.3
West End 6.4
The strong tenant demand has led to the absorptionof space, particularly of new space, resulting insignificant reductions in availability. Central Londonavailability fell to 16.7m sq ft from 18.5m. Themajority of the space on the market (69%) issecondhand, while only 8% is early marketed spaceunder construction, which is the lowest since 2005.
Supply levels translate into a Central London
vacancy rate of 6.7% and compares with a recentpeak of 7.7%. The Docklands has the highest rate at8.6%. These rates are some way off the peaks setduring previous market downturns, particularlyduring the 1990s recession.
There are currently 15 units available over 100,000sq ft in Central London. The largest unit is Central StGiles at 385,200 sq ft which is due to complete inthe second quarter and The Walbrook is the largestcompleted building at 381,000 sq ft.
There is currently 4.4m sq ft under construction inCentral London which is the lowest total since 2004 2.9m sq ft of which is available. In the first quarter,1.3m sq ft completed of which 52% was speculative.The largest of these completed buildings was TheWalbrook (381,000 sq ft) and the second largestwas 2 Kingdom Street (247,900 sq ft).
The development pipeline peaked last year with6.5m sq ft of completions in Central London and thisyear completion levels are expected to reach 4.1msq ft, before falling to 1.3m sq ft in 2011, which willbe the lowest recorded level.
As the supply and demand imbalance has intensifiedover the last few months, landlords have reacted byincreasing rents. This has been reflected in rises inprime rents across Central London. City prime rentsrose to 47.00 per sq ft and West End prime rents to85.00 per sq ft.
On a broader level, Central London prime rents rose6.0% over the quarter, according to the CB RichardEllis prime rent index, although prime rents were still4.0% lower compared with a year ago. City prime
rents registered the largest quarterly increase with a7.7% rise. Midtown and Southbank were the onlymarkets to record annual increases in prime rents each market saw a 1.4% increase compared with ayear ago.
Rent-free periods on a 10-year lease in the Citydecreased to 27 months from 30-33 months lastquarter, while rent frees in the West End moved to18-21 months from 21 months.
0
2
4
6
8
10
12
14
16
20
00
Q
3
20
01
Q
1
20
01
Q
3
20
02
Q
1
20
02
Q
3
20
03
Q
1
20
03
Q
3
20
04
Q
1
20
04
Q
3
20
05
Q
1
20
05
Q
3
20
06
Q
1
20
06
Q
3
20
07
Q
1
20
07
Q
3
20
08
Q
1
20
08
Q
3
20
09
Q
1
20
09
Q
3
20
10
Q
1
millionsq
ft
Under Construction Available Committed
8/7/2019 Central London Offices MarketView_Q12010
4/12
City
Headlines
Take-up hit 2.2m sq ftAvailability continued to tightenPrime rents rose to 47.00 per sq ft
City take-up for the quarter reached 2.2m sq ft,
which was the second highest total on record,bettered only by the third quarter of 2000 whentake-up was only 43,000 sq ft higher. Take-up was30% higher than last quarter and nearly six timeshigher than the same quarter last year which was theworst on record. Take-up has been above the long-term average of 1.2m sq ft for the last threequarters.
Demand for newly completed space accounted forthe majority of take-up in the first quarter,representing 57% of take-up while secondhand
space accounted for 36%, with pre-lets accountingfor the remainder. Reflecting this, grade A spaceaccounted for 80% of the quarters take-up.
There were 10 deals over 50,000 sq ft during thefirst quarter, of which two were over 200,000 sq ft.In the largest deal of the quarter, BlackRock took270,600 sq ft at Drapers Gardens, EC2, this wasfollowed by Macquarie leasing 212,400 sq ft atRopemaker, EC2. There were three additional dealswhich were over 100,000 sq ft.
As a number of large deals dominated take-up, thistranslated through to take-up by sector. Banking andfinance accounted for 55% of take-up, which waswell ahead of the long-term average of 35%. Thiswas followed by the professional sector with 25%compared with a long-term average of 20%. Take-up from other business sectors was relatively weak.
One consequence of the very much higher level ofdemand over the last three quarters and the verystrong last quarter is that the amount of space underoffer at the end of March fell to 0.9m sq ft, thecorresponding figure last quarter was 1.6m sq ft.
Evidence that the second quarter will be significantlyweaker than the first.
Strong demand and a limited amount of new spacecoming on to the market has pushed supply lowerfor the third quarter in succession. Availability was6.6m sq ft at the end of the first quarter, which was2.5m sq ft lower than the peak set in the secondquarter of last year. The availability of all types ofspace fell, particularly secondhand. One of the moststriking features of recent trends is the small amountof available space currently under construction. This
fell to 758,300 sq ft, its lowest level since the secondquarter of 2006.
aQ12010
MarketView
Centra
lLondonOffices City Take-up
Sector Structure of City Take-up, 2010 Q1
City Availability
2010, CB Richard Ellis, Inc.
Page 4
0.0
0.5
1.0
1.5
2.0
2.5
2000Q2
2001Q1
2001Q4
2002Q3
2003Q2
2004Q1
2004Q4
2005Q3
2006Q2
2007Q1
2007Q4
2008Q3
2009Q2
2010Q1
million
sqft
Secondhand New Completed Pre-let
55%
6%2%
6%
2%
25%
2% 2% Banking & Finance
Business Services
Manufacturing, Industrial& Energy
Insurance
Public Sector
Professional
Consumer Services &Leisure
Computers / Hi-Tech
0
2
4
6
8
10
12
14
2001Q1
2001Q3
2002Q1
2002Q3
2003Q1
2003Q3
2004Q1
2004Q3
2005Q1
2005Q3
2006Q1
2006Q3
2007Q1
2007Q3
2008Q1
2008Q3
2009Q1
2009Q3
2010Q1
millionsqft
Secondhand New Completed New Under Construction
8/7/2019 Central London Offices MarketView_Q12010
5/12
Q12010
MarketView
CentralLondonOffices
The City availability rate has fallen in line with thedrop in supply. At its peak, the rate was 12.9% in thefirst quarter of 2009, but it had declined to 10.2% bylast quarter and ended the first quarter of 2010 at8.9%. The last time availability reached this rate wastwo years ago. The vacancy rate stood at 7.3% atthe end of quarter which was down significantly onthe 8.5% recorded last quarter.
There were eight units over 100,000 sq ft availableat the end of March, of which four were newlycompleted and the rest were under construction. TheWalbrook, EC4 (381,200 sq ft), which completed inFebruary, is the largest available unit on the marketand 200 Aldersgate, EC1 (354,400 sq ft) is the onlyother unit over 300,000 sq ft. There are two otherbuildings over 200,000 sq ft: New Change, EC4(207,200 sq ft) and St Botolphs, EC3 (237,700 sqft).
Three schemes completed during the first quarter,
totalling 523,000 sq ft, which accounts for 24% ofthe development pipeline expected to complete in2010. With development completions peaking lastyear at 3.2m sq ft, only 2.2m sq ft is scheduled tocomplete this year. However, completions will reducerapidly thereafter with only 0.9m sq ft expected tocomplete in 2011. There is currently 2.5m sq ftunder construction in the City with 0.9m committed.
In a sign of the markets strength, rents haveincreased and incentives have become less generousover the quarter. At the end of 2009, City primerents were 43.50 per sq ft, rising to 47.00 per sqft during the quarter.
At the broader level, rents also strengthened over thequarter according to the CB Richard Ellis City primerent index which recorded a 7.7% quarterly increase,although the rent index was still 0.6% lower on aannual basis.
At the end of the first quarter, the rent free period ona 10-year lease was 27 months compared with 30-33 months the previous quarter.
City Development Pipeline
Prime City Rent Index (May 1988 = 100)
Drapers Gardens,EC2
270,600BlackRock
Riverbank House,EC4
101,900Royal Bank ofCanada
30 Crown Place,EC2
181,700Pinsent Masons
1 Finsbury Circus,EC2
128,500StephensonHarwood
Ropemaker, EC2212,400Macquarie
AddressSq ftOccupier
Key City Transactions, 2010 Q1
Page 5
2010, CB Richard Ellis, Inc.
0
1
2
34
5
6
7
1988
1990
1992
1994
1996
1998
2000
2002
2004
2006
2008
2010
2012
million
sqft
Completed Under Construction Let/Under Offer
Under Construction Available Proposed Available
40
50
60
70
80
90
100
110
120
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
8/7/2019 Central London Offices MarketView_Q12010
6/12
aQ12010
MarketView
Centra
lLondonOffices West End Take-up
Sector Structure of West End Take-up, 2010 Q1
West End Availability
2010, CB Richard Ellis, Inc.
Page 6
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
2001Q1
2001Q3
2002Q1
2002Q3
2003Q1
2003Q3
2004Q1
2004Q3
2005Q1
2005Q3
2006Q1
2006Q3
2007Q1
2007Q3
2008Q1
2008Q3
2009Q1
2009Q3
2010Q1
millions
qft
Secondhand New Completed Pre-let
11%
17%
19%
6%
8%
7%
32%
Banking & Finance
Business Services
Manufacturing,Industrial & Energy
Public Sector
Professional
Consumer Services &Leisure
Computers / Hi-Tech
0
1
2
3
4
56
7
8
9
2001Q1
2001Q3
2002Q1
2002Q3
2003Q1
2003Q3
2004Q1
2004Q3
2005Q1
2005Q3
2006Q1
2006Q3
2007Q1
2007Q3
2008Q1
2008Q3
2009Q1
2009Q3
2010Q1
millionsqft
Secondhand N ew Completed New Under Construction
West End
Headlines Take-up reached highest level since 2007Availability now 24% lower than 2009 peak Prime rental values showed 5% rise over quarter
The strong momentum in take-up seen in the finalquarter of last year continued in the first three
months of 2010. West End take-up reached morethan 1.3m sq ft in quarter one, 28% higher than thelong-term quarterly average and nearly three timesmore than the level recorded in the same period lastyear.
Take-up in the North of Oxford Street East, Eustonand Bloomsbury markets was the strongest relativeto the long-term trend this quarter. In contrast,transactions in North of Oxford Street andKnightsbridge were relatively muted.
The proportion of space acquired this quarter thatwas secondhand was in line with trend levels whilethe amount of newly completed space was very highat 324,500 sq ft. These transactions for new spacewere comprised of two of the quarters biggest dealsat 1&2 Regents Place. While the demand for earlymarketed space remains very weak, there was onekey deal where much of the St Martins Courtyardscheme, due for completion in the third quarter, wasacquired.
The presence of larger deals was also important thisquarter with 10 deals in excess of 20,000 sq ft;
compared to nine in the first three quarters of 2009.Business services were the largest driver of demandthis quarter with a third of transactions deriving fromthis sector. However, the banking and financesector, traditionally a key driver of demand, wasrelatively weak with just 11% of transactions. Boththe public sector and manufacturing, industrial &energy accounted for high levels of take-upcompared to their long-term averages.
There remains a very high level of space under offerin the West End at 981,500 sq ft; compared to a
long-term average of 781,000 sq ft, which pointstowards a strong second quarter. This includes afurther 240,500 sq ft of newly completed space.
The supply of available space in the West Endcontinued its sharp descent in the first three monthsof the year, falling almost 10% to 6.3m sq ft. Thisrepresents a 24% decline since the market peak inquarter two 2009 and brings availability back to thelevels seen in 2008. West End supply levels are nowjust 15% above the long-term average with muchof this located in non-core markets.
8/7/2019 Central London Offices MarketView_Q12010
7/12
Q12010
MarketView
Centr
alLondonOffices
West End Development Pipeline
Prime West End Rent Index (May 1988 = 100)
St Martins Courtyard42,900Robert Walters
1 Southampton Row34,000Carpmaels & Ransford
Euston Xchange107,600Royal College of
General Practitioners2 Regents Place89,400Gazprom
1 Regents Place117,400Aegis Group
AddressSq ftOccupier
Key West End Transactions, 2010 Q1
Page 7
2010, CB Richard Ellis, Inc.
0
0.5
1
1.5
2
2.5
1988
1990
1992
1994
1996
1998
2000
2002
2004
2006
2008
2010
2012
millionsqft
Completed Under Construction Let/Under Offer
Under Construction Available Proposed Available
40
60
80
100
120
140
160
180
200
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
At 4.8m sq ft, the supply of secondhand spaceremains elevated relative to the long-term trend of3.9m sq ft; however, this has fallen sharply sincequarter two last year and the amount ofsecondhand space returning to the market is belowaverage.
The amount of newly completed space has startedto fall back with 881,000 sq ft currently available,
although there are a number of large schemes stillto complete in coming months. It is the supply ofspace currently under construction where levels arevery tight. The 576,000 sq ft of early marketedspace is already 26% below trend, and there is verylittle development anticipated in 2011 meaning thiswill continue to fall sharply as schemes complete.
Reflecting the falling supply, and despite more than300,000 sq ft of completions this quarter, the WestEnd vacancy rate fell marginally to 6.4% from 6.8%.With a large amount of space due for completion
by the end of the year, this rate is unlikely to fallsignificantly until the end of the year. However,from this point, it will likely start to decline rapidlyas development completions all but cease.
Development completions are expected to reach1.1m sq ft in 2010, although 30% of this is alreadycommitted. Three new schemes completed in thefirst quarter of 2010, the largest being TwoKingdom Street, which was partially let, where172,400 sq ft remains available.
By the end of the year a further seven schemes aredue for completion. The largest is Central St Gileswith 385,200 sq ft for delivery in the secondquarter. By 2011 however, developmentcompletions will be very limited, there is currentlynothing under construction and just 110,000 sq ft isconfirmed to proceed. From 2012 it is expectedthat development completions will start to riseslowly.
After the marginal increase recorded on the WestEnd prime rent index in the final three months of2009, there was a much stronger 4.9% rise
recorded this quarter. While overall, the rent indexremains 7.3% lower than this time last year, therebound has been much stronger and quicker thanpreviously anticipated.
Following four consecutive quarters at 80.00 persq ft, the West End top prime rent increased to85.00 per sq ft in the first quarter. Similar riseswere recorded across all West End submarkets.Also reflecting the improved market sentiment, rentfree incentives on a 10-year lease came in slightlyto 18/21 months in the Mayfair & St Jamess core
and 21/24 months elsewhere.
8/7/2019 Central London Offices MarketView_Q12010
8/12
aQ12010
MarketView
Centra
lLondonOffices Midtown Take-up
Midtown Availability
Southbank Take-up
2010, CB Richard Ellis, Inc.
Page 8
0
100
200
300
400
500
600
700
800
2001Q1
2001Q3
2002Q1
2002Q3
2003Q1
2003Q3
2004Q1
2004Q3
2005Q1
2005Q3
2006Q1
2006Q3
2007Q1
2007Q3
2008Q1
2008Q3
2009Q1
2009Q3
2010Q1
thousan
dsqft
Secondhand New Completed Pre-let
0.0
0.5
1.0
1.5
2.0
2.5
3.0
200
1Q1
200
1Q3
200
2Q1
200
2Q3
200
3Q1
200
3Q3
200
4Q1
200
4Q3
200
5Q1
200
5Q3
200
6Q1
200
6Q3
200
7Q1
200
7Q3
200
8Q1
200
8Q3
200
9Q1
200
9Q3
201
0Q1
millionsqft
Secondhand New Completed New Under Construction
0
200
400
600
800
1,000
1,200
2001Q1
2001Q3
2002Q1
2002Q3
2003Q1
2003Q3
2004Q1
2004Q3
2005Q1
2005Q3
2006Q1
2006Q3
2007Q1
2007Q3
2008Q1
2008Q3
2009Q1
2009Q3
2010Q1
thous
andsqft
Secondhand New Completed Pre-let
Midtown / Kings Cross
Take-up for the first quarter of 2010 totalled218,400 sq ft a 43% decline from the end of2009. As a result, demand was below the long termaverage of 326,000 sq ft. The majority of space letduring the quarter was secondhand accounting for87% of total transactions whilst the remainder wasnewly completed. The amount of space under offer
has increased over the first three months of the yearto reach 287,000 sq ft a 47% uplift from lastquarter 2009.
Law firm Lovells achieved the largest deal of the firstquarter taking 42,000 sq ft at Meridian House,34/35 Farringdon Street, EC4. This was followed bythe charity Absolute Return for Kids which acquired14,000 sq ft at 65 Kingsway, WC2. The professionalsector recorded the highest proportion of lettings forthe first quarter with 54% of all deals done. Businessservices and the public sector each accounted for
16% of total take-up.
Availability in Midtown continued to contract further,albeit gradually, to 1.7m sq ft at the end of Marchfrom 1.8m sq ft the previous quarter. Supply isedging closer to the long term average of 1.6 millionsq ft. The majority of space available is secondhandwith 17% newly completed and 3% early marketed.
The largest unit of available space is at Nexus Place,Farringdon Street, EC4 where 86,000 sq ft is on themarket from Scottish Widows/ Teachers AssuranceSociety. No schemes completed during the firstquarter, however, looking ahead there is 292,000sq ft set to complete this year, although 83% isalready committed.
Over the quarter, the vacancy rate increased to 7.0%from 6.8% at the end of 2009.
The Midtown top prime rent increased to 47.00 persq ft level with the City market from 42.50 persq ft with rent free periods reducing. The CB RichardEllis Prime Rent Index showed an increase of 7.1%quarter on quarter and 1.4% annually.
Southbank
Take-up increased to just under 100,000 sq ft forthe first quarter of 2010 a two-fold increase fromthe previous quarter. There was a lack of pre-letsduring the quarter whilst secondhand spaceaccounted for the majority of deals at 72% andlettings for newly completed space totalled 28%. Thelargest deal of the quarter was by Comic Relief atCamelford House, 87/90 Albert Embankment, SE1.Under offers have increased incrementally to 72,400
sq ft from 62,300 sq ft at the end of 2009.
8/7/2019 Central London Offices MarketView_Q12010
9/12
Q12010
MarketView
CentralLondonOffices
Availability in the Southbank increased to 568,700sq ft from 478,400 sq ft at the end of 2009. Themajority of space available is secondhand. Duringthe first quarter of 2010 PriceWaterhouseCooperscommitted scheme at 7 More London Riverside, SE1(450,000 sq ft) completed. Beyond this, thedevelopment pipeline is empty over the next coupleof years apart from The Shard which is currently
under construction and due to complete in 2012 total size 586,500 sq ft, of which 193,000 sq ft ispre-let.
The vacancy rate increased to 3.2% at the end of thefirst quarter from 2.7% in December 2009 as thelevel of ready-to-occupy space increased over thefirst three months of the year.
Southbank prime rents have increased to 42.50 persq ft from a steady 40.00 per sq ft in 2009 andincentive periods have declined. The CB Richard Ellis
prime rent index showed a 5.5% quarterly increaseand a 1.4% rise annually.
Docklands
Following very weak take-up through 2009,transactions in the Docklands reached an abovetrend 522,300 sq ft in the first quarter of the year.Driven largely by Barclays Banks acquisition of346,000 sq ft at 20 Cabot Square. In another majordeal, LOCOG acquired more space in theDocklands, with 135,300 sq ft at 10 Upper Bank
Street. Secondhand space accounted for all leasingactivity.
Despite the strong quarter, under offers remained atan above trend 361,800 sq ft which includes309,100 sq ft of newly completed space.
For the first time this cycle, total availability declinedto 1.6m sq ft down 14% on the quarter. Thesupply of secondhand space is very high at 1.1m sqft. In contrast, the amount of newly completedspace is only marginally above the long-term
average and there is no space under constructioncompared to a long-term average of 188,100 sq ft.
With the shift of some secondhand space becomingavailable for immediate occupation, there was a risein the Docklands vacancy rate to 8.6% from 8.0% atthe end of 2009. This remains significantly lowerthan the levels of vacancy reached during thedot.com downturn when rates were over 10% forthree years.
There was a slight rise in the Canary Wharf primerent to 36.50 per sq ft from 35.00 per sq ft in2009. Similarly, the Docklands prime rent indexrecorded a 4.2% increase over the quarter although it remains 4.4% lower than last year.
Southbank Availability
Docklands Take-up
Docklands Availability
Page 9
2010, CB Richard Ellis, Inc.
0
500
1,000
1,500
2,000
2,500
3,000
2001
Q1
2001
Q4
2002
Q3
2003
Q2
2004
Q1
2004
Q4
2005
Q3
2006
Q2
2007
Q1
2007
Q4
2008
Q3
2009
Q2
2010
Q1
thousandsqft
Secondhand New Completed Pre-let
0.0
0.5
1.0
1.5
2.0
2.5
2001Q1
2001Q3
2002Q1
2002Q3
2003Q1
2003Q3
2004Q1
2004Q3
2005Q1
2005Q3
2006Q1
2006Q3
2007Q1
2007Q3
2008Q1
2008Q3
2009Q1
2009Q3
2010Q1
millionsq
ft
Secondhand New Completed New Under Construction
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
2001Q1
2001Q3
2002Q1
2002Q3
2003Q1
2003Q3
2004Q1
2004Q3
2005Q1
2005Q3
2006Q1
2006Q3
2007Q1
2007Q3
2008Q1
2008Q3
2009Q1
2009Q3
2010Q1
m
illionsqft
Secondhand New Completed New Under Construction
8/7/2019 Central London Offices MarketView_Q12010
10/12
Investment
Headlines
Investment levels reached 1.2bnOverseas investors still dominate marketPrime yield continued to compress
Despite strong investor demand, a lack of stock
restricted investment volumes in the first quarter to1.2bn. This is the lowest total since the first quarterof last year and is 42% lower than last quarter. Withsubstantially more stock having come on to themarket in the last few months, transactions levels areexpected to increase in the second quarter.
In the largest deal of the quarter, 5 Churchill Place,E14 was sold to an overseas investor by the CanaryWharf Group for 208m, reflecting a yield of 5.85%.There were two other deals over 100m: M1 RealEstate acquired Victoria House, 37-63 Southampton
Row, WC1 for 175m, off a yield of 6.5% and HIH,the German open-ended fund, bought 100 NewBridge Street, EC4 from DEGI for 110m, reflectinga yield of 6.15%.
Overseas buyers are still very active in the market,encouraged by the weakness of sterling and lowinterest rates. Foreign buyers accounted for 60% ofthe first quarters transactions, compared with 73%during 2009. Overseas investors have been mostactive in the acquisition of buildings in excess of100m. Middle Eastern and North African, andGerman investors maintained their strong interest inthe Central London market they accounted for40% and 12% of total investments respectively. Bycontrast, domestic investors were more active in thesmaller lot sizes and accounted for 40% of alltransactions.
Prime yields continued to recompress. Having startedthe quarter at 5.0%, West End prime yields endedthe quarter at 4.5%, while City yields moved to5.75% from 6.0% over the same period.
Investment trends in the City mirrored those in the
Central London market. Investment transactionstotalled 330m in the City, which like CentralLondon was 42% lower than the previous quarter.HIHs purchase of 100 New Bridge Street, EC4 wasthe largest single transaction and this pushedGerman investors share of total City transaction byvolume to 48%.
In the West End, investment transactions totalled531m for the first quarter which was only 6% downon the previous quarter. The largest West End dealwas the 175m purchase of Victoria House, 37-63
Southampton Row, WC1. This deal took the share ofWest End investments made by overseas investors to61%.
aQ12010
MarketView
Centra
lLondonOffices Central London Investment Transactions
City and West End Prime Yields vs Swap Rates
Investment Transactions By Purchasers, 2010 Q1
2010, CB Richard Ellis, Inc.
Page 10
0
1
2
3
4
5
6
7
2000Q3
2001Q1
2001Q3
2002Q1
2002Q3
2003Q1
2003Q3
2004Q1
2004Q3
2005Q1
2005Q3
2006Q1
2006Q3
2007Q1
2007Q3
2008Q1
2008Q3
2009Q1
2009Q3
2010Q1
Billion
Total 4 Quarter Average
2
2.5
3
3.5
4
4.5
5
5.5
6
6.5
7
2001Q1
2001Q3
2002Q1
2002Q3
2003Q1
2003Q3
2004Q1
2004Q3
2005Q1
2005Q3
2006Q1
2006Q3
2007Q1
2007Q3
2008Q1
2008Q3
2009Q1
2009Q3
2010Q1
%
City West End 5 Year Swap Rate
9%
2%
10%
1%40%
3%
12%
5%18%
UK Property Companies
UK Institutions
UK Other
UK Private
USA/Canada
Middle East/Africa
China
German
European Other
8/7/2019 Central London Offices MarketView_Q12010
11/12
2.092.921.77Available1.84 1.276.345.20NewCentral London
1.921.484.65Let/Under Offer2.52 2.2912.1511.49Secondhand
4.01.40.42.36 3.56.708.496.69otal
Vacancy
Rate
%
0.000.000.00Available0.00 0.000.690.54NewDocklands
0.000.001.35Let/Under Offer0.52 0.271.181.06Secondhand
0.00.00.35.52 0.27.60.86.60otal
0.45.58.09.10 0.05.20.48.57otal
0.450.190.09Let/Under Offer0.07 0.030.440.52Secondhand
0.000.390.00Available0.03 0.020.040.04NewSouthbank
0.29.39.38.22 0.38.00.78.68otal0.240.240.14Let/Under Offer0.19 0.181.281.35Secondhand
0.050.150.24Available0.03 0.200.500.33NewMidtown
1.10.96.44.32 1.18.40.89.23otal0.330.200.79Let/Under Offer0.96 0.905.014.77Secondhand
0.770.760.65Available0.37 0.281.881.46NewWest End
2.17.47.16.19 1.68.30.47.61otal0.900.852.28Let/Under Offer0.78 0.914.233.78Secondhand
1.271.620.88Available1.42 0.773.242.83NewCity
ExpectedCompletions
2010
m sq ft
Under
Construction
m sq ft
Total
Completions
2009
m sq ft
Q4
2009
m sq ft
Q1
2010
m sq ft
Q4
2009
m sq ft
Q1
2010
m sq ft
DEVELOPMENT SUPPLY PIPELINETAKE-UPAVAILABILITY
24,000SpeculativeEdison House, Old Marylebone Road, W1
15,000SpeculativeNo. 3 Savile Row, W1
Sq ftStatus
CENTRAL LONDON: NEW UNDER CONSTRUCTIONS
billion
0.730.66UK PurchasersCentral London
0.000.15UK PurchasersMidtown
0.050.00Overseas
0.05.15otal
0.030.01UK PurchasersSouthbank
0.000.00Overseas
0.03.01otal
0.52.30otal0.140.20Overseas
0.240.15Overseas
0.57.53otal
1.350.56Overseas
2.08
0.33
0.38
Q4 2009
1.22otal
0.38UK PurchasersWest End
0.10UK PurchasersCity
Q1 2010
INVESTMENT TRANSACTIONS
2010 CB Richard Ellis Limited
0.208Private Investor5 Churchill Place, E14
0.110HIH100 New Bridge Street, EC4
0.175M1 Real EstateVictoria House, SouthamptonRow, WC1
billionPurchaser
CENTRAL LONDON: MAJOR INVESTMENT DEALS
Q12010
MarketView
Centra
lLondonOffices
Page 11
1.4%
1.4%
-0.6%
-7.3%
Y-on-Y
42.505.5%Southbank
47.007.1%Midtown
47.00
85.00
7.7%
4.9%
City
West End
Prime RentQ-on-Q
CBRE RENTAL INDEX GROWTH
8/7/2019 Central London Offices MarketView_Q12010
12/12
Disclaimer 2010 CB Richard EllisInformation herein has been obtained from sources believed to be reliable. While we do not doubt its accuracy, we havenot verified it and make no guarantee, warranty or representation about it. It is your responsibility to independentlyconfirm its accuracy and completeness. Any projections, opinions, assumptions or estimates used are for example onlyand do not represent the current or future performance of the market. This information is designed exclusively for use byCB Richard Ellis clients, and cannot be reproduced without prior written permission of CB Richard Ellis. Copyright 2010CB Richard Ellis
CB Richard Ellis is the market leading commercial real estate adviser worldwide - an adviser strategically dedicated to
providing cross-border advice to corporates and investment clients immediately and at the highest level. We have 400offices in 58 countries across the globe, and employ 24,000 people worldwide. Our network of local expertise, combinedwith our international perspective, ensures that we are able to offer a consistently high standard of service across theworld. For full list of CB Richard Ellis offices and details of services, visitwww.cbre.com
aQ12010
MarketView
Centra
lLondonOffices
2010, CB Richard Ellis, Inc.
Page 12
For more information regarding theMarketView, please contact:
Central London Research
Kevin McCauley
Director, Central London Research
CB Richard Ellis
St Martins Court
10 Paternoster Row
London EC4M 7HP
t: +44 20 7182 3620
e: kevin.mccauley@cbre.com
CENTRAL LONDON BUSINESS TEAM
MANAGING Adam HetheringtonDIRECTOR
OFFICE Digby Flower Central LondonAGENCY Mark Slim City
Emma Crawford West EndDan Roberts Canary Wharf/City
INVESTMENT Mike Edwards C entral LondonRob Silvester CityDavid Green West End
PROFESSIONAL Colin Manders Central LondonSERVICES Geoffrey Dale City
Mark Penson CityBen Coffin West End
DEVELOPMENT Adam Hetherington Central LondonSERVICES Adrian Bunnis City
Peter Burns West EndMatthew Black East London
TENANT ADVISORY Stewart Smith
RESIDENTIAL Jonathan Seal
Submarkets Map
RESEARCH & CONSULTING TEAM
PETER DAMESICKPeter.Damesick@cbre.com
KEVIN McCAULEYKevin.McCauley@cbre.com
IAN KISSANE
Ian.Kissane@cbre.com
GARY MARTINGary.Martin@cbre.com
ANNA AMIN-KEOGHAnna.Amin-Keogh@cbre.com
Crown Copyright. All rights reserved. CBRE licence number: 100019184. Ordnance Survey.