View
7
Download
0
Category
Preview:
Citation preview
CFAS Enterprises Inc.After Market Utility Power Equipment BrokerageMailto:Staff@CFASPower.comTurbine URL: http://CFASPower.com/Reciprocating URL: http://CFASPower.com/Recips.html
GTG_1693EN_LM2500CHP_50Hz.doc
1 x Used GE LM2500/ABB 24.9 MW 50Hz Nat Gas CHP Power Generation System
Asking Price: US $5MM
Manufacturer General ElectricYear 1994Model LM2500Fuel Type GAS
Recommended Packaging Form CUSTOM
The Complete Cogeneration Unit with a combined nominal capacity of 24.9MW consist of the following:
GE LM2500 Gas Turbine of 21.5MW Capacity
GE LM2500 Gas Turbine Capacity: 21.5 MWMaximum Flow Rate: 6300 Nm3/hrNormal Flow Rate: 5800 Nm3/hrNominal Working Pressure: 32 BarVolts: 6,3 KV.Last full overhaul; May 08HRS SINCE OH’D: 19,500 hrs Condition. GE does a monthly turbine preservation labor.Documentation: Available
ABB Backpressure Steam Turbine of 4.5MW Capacity
Last overhaul November 09. Type: G18ATurbine speed: 12,000 rpm-reduced to 1500 rpm by set of gearsTurbine Stages: 7Direction of turbine rotation: CCWTo produce mechanical power the turbine receives superheated steam from the boiler
Deutsche-Babcock Steam Boiler With A Capacity Of 33 Ton/Hr At 61 Bar Pressure
Year: 1994Year of Modifications (revamping): 2000-2001Fuel: What is the fuel it burns Natural Gas, or #2 fuel oil
or combination. If natural gas is there a gas compressor available. Plant burn natural gas. There is a gas compressor available and all the facilities needed to measure, control and provide gas at different conditions to the gas turbine and post-combustion
Gas Compressor: 10 – 16 to 32 bar.Control system. TURLOOP of ABB Turbine Nürnberg Gmbh. It is a
fully electronic and programmable protection and control system.
ABB Back Pressure Steam Turbine Of 4.5 MW Spare Parts: YesABB Back pressure steam boiler: Coupled to the generatorSkid Mounted: YesInlet press/temp/exhaust pressure. 60 and 9 bar.
Age and manufacturer: Manufacturer is Alstom. 16.5 years (including 1.6 years since the closure of the factory).
Spare parts: Yes
Babcock Steam Boiler Boiler pressure/superheated temp: .60 bar and 450 C.Is the boiler equipped with:Supplemental burner and what fuel did it burn: Yes, Post combustion natural gas burner.Is the boiler a packaged type. YesGeneral arrangement drawings. YesDoes boiler have a national board number stamping on it as well as ASME certification: YesSpare parts. Yes
Description of Modifications: Re-route the piping lines that come out of the boiler to the superheaters and the factory vapor lines. The actual line coming out of the boiler to the primary superheater was substituted with a line to the final superheater(which became the primary superheater) closer to the evaporator. From the exit of this superheater a line was routed to the former primary heater which became now the final superheater.Objectives: To facilitate the increase of vapor production from the generator and make it match the new working conditions of the boiler.Overall Inspection and Recertification Performed on 2010 by ATISAE- agency that regulates the pressure vessels in EuropeGas Natural Post-Combustion System to produce hot gases for 42 ton/hr of additional steam.All electrical and control equipment located within the installation perimeter of this system.
Recommended