CHAPTER 8 SCHEDULING AND DISPATCH (SD) - …gmc.org.ph/file-manager/files/CH8 - Scheduling and...

Preview:

Citation preview

CHAPTER 8 – SCHEDULING AND DISPATCH (SD)

1

2

SD 8.1. PURPOSE

(a) To specify the responsibilities of the Market Operator, Transmission Network Provider, the System Operator, and other Users in Scheduling and Dispatch;

(b) To define the operational criteria for the preparation of the DispatchSchedule and issuance of Dispatch Instructions;

(c) To specify the process and requirements for the preparation of the Generation Schedule; and

(d) To specify the Central Dispatch process.

CHAPTER 8 SCHEDULING AND DISPATCHING

3

CHAPTER 8 SCHEDULING AND DISPATCHING

CHAPTER 8 SCHEDULING AND DISPATCHING

4

CHAPTER 8 SCHEDULING AND DISPATCHING

5

6

CHAPTER 8 SCHEDULING AND DISPATCHING

7

CHAPTER 8 SCHEDULING AND DISPATCHING

8

CHAPTER 8 SCHEDULING AND DISPATCHING

9

CHAPTER 8 SCHEDULING AND DISPATCHING

10

CHAPTER 8 SCHEDULING AND DISPATCHING

Thank you

CHAPTER 8 SCHEDULING AND DISPATCHING

• From SD 8.3.3.4

– Real-time snapshots

– Planned and unplanned outages

– VRE aggregated generation forecasts

– Reserve requirements

– Security constraints

– Contingency list

CHAPTER 8 SCHEDULING AND DISPATCHING

• From SD 8.4.2.2

– Nominations of available generating capacities for Dispatch of Energy and reserve

– Unplanned Outage and Scheduled Maintenance

– Other information which will pose additional constraints in the operation of their Generating Units

Recommended