CIP Work Session #2 FY 2024 Non Capacity Project...

Preview:

Citation preview

www.acps.k12.va.us

CIP Work Session #2FY 2015‐2024 Non‐Capacity

Project PlanJanuary14,2014

SchoolBoardWorkSession

www.acps.k12.va.uswww.acps.k12.va.us2

Essential Questions

• WhataretheproposedFY2015‐2024non‐capacityprojects?

• Whatfactorscontributedtotheprojectprioritization?

• WhatisthefundinggapwiththeCityCouncil’sFY2014‐2023ApprovedCIP?

www.acps.k12.va.uswww.acps.k12.va.us3

6 Project Categories1.AssetLossPrevention:

– Projectsthatpreventthelossofexistingassets.– Ex:AccessControl&SecurityManagement,UpgradeTransportationFacility

2.EcoCity:– “Greenovation”projectsthatreduceenergyuseandtheACPScarbonfootprint.

– Ex:Majorgreenroofmaintenance

3.EquipmentandSystemsReplacement:– Replacementofexistingbuildinginfrastructureandequipmentinexistingfacilities.

– Ex:HVACReplacement,ElevatorReplacement,Stormwatermanagement

www.acps.k12.va.uswww.acps.k12.va.us4

6 Project Categories

4.FacilityMaintenance:– Projectsbasedonindustry‐widemaintenancestandards.– Ex:Plumbing/RestroomUpgrades,SiteHardscapeRepairs,BuildingEnvelopeRepair

5.InstructionalEnvironment:– Projectstoimprovetheinstructionalenvironmentateachsite.– Ex:Interiorrenovations,ProjectPlanning

6.SharedProgramPriorities:– ProjectsundertakenincollaborationwithCityDepartmentssuchasRecreation,ParksandCulturalActivitiesandGeneralServices.

– Ex:ReplacebleachersatCoraKellyRecreationCenter

www.acps.k12.va.uswww.acps.k12.va.us5

Project Prioritization• Tier1

• BuildingEnvelope• HVAC/ClimateControl• Elevator• RoofReplacement

• Tier2• AccessControl• MasterKey• Stormwatermanagement• CodeCompliance• ProjectPlanning

• Tier3• Painting• Flooring• Playgrounds/SportsArea• Plumbing

www.acps.k12.va.uswww.acps.k12.va.us6

FY 2015‐2019 CIP Non‐Capacity BudgetFY2015$11.99millionFY2016$11.81millionFY2017$12.08millionFY2018$11.86millionFY2019$11.84millionTotal$59.58million

www.acps.k12.va.uswww.acps.k12.va.us7

CIP Funding‐ Non‐CapacityFY 2015‐2024

• FY2014‐2023SchoolBoardapprovednon‐capacitybudgetexceededtheCityCouncil’sallocationtoACPSby$38.9million

• Appliedprioritizationmethodologyandlevel‐loadingtomeetCityCouncilapprovedtotalnon‐capacityfortheten‐yearprogram

• Note:Forprojectionpurposes,theCityCouncil’sFY2024fundingisestimatedatthesamelevelasFY2023.

FY2014-2023 Final School

Board CIP- Non-Capacity

FY2014-2023 Final City

Council CIP-Non-Capacity

FY2015-2024 Resource-

Constrained CIP-Non-Capacity

Difference in FY15 RC Non‐Capacity and FY14 City Council Approved 

Non‐Capacity CIP

FY 2015 8,011,387 6,956,000 11,985,452 (5,029,452)

FY 2016 6,665,781 4,808,000 11,808,279 (7,000,279)

FY 2017 44,296,403 33,258,000 12,077,457 21,180,543

FY 2018 24,020,735 21,229,533 11,875,094 9,354,439

FY 2019 24,030,973 17,648,000 11,839,966 5,808,034

FY 2020 14,313,842 10,360,000 14,874,892 (4,514,892)

FY 2021 9,898,484 7,049,000 14,977,281 (7,928,281)

FY 2022 19,344,555 14,133,000 14,867,962 (734,962)

FY 2023 13,582,237 9,812,000 14,988,176 (5,176,176)

FY 2024 - - 15,416,455 (15,416,455)

Grand Total 164,164,397 125,253,533 $ 134,711,015 (9,457,482)

www.acps.k12.va.uswww.acps.k12.va.us8

FY 2015 Non‐Capacity Project SummaryFY 2015 Project Description/Site Project Budget

SchoolBusesandVehicles $1.28MEmergencyRepairs/Asbestos/Renovations/CodeCompliance

$0.41M

FF&E $0.30MLongRangePlanning $0.32MProjectPlanning $0.40MAccessControl&KeyReplacement $0.45MElevator FrancisC.Hammond $1.13MParkingExpansion JohnAdams;

TransportationFacility$2.20M

BuildingEnvelope CB,GW,JA,LC,MM,MV,Rowing,T.C.W.:MH

$2.91M

HVACReplacement CB,DM,GM,GW,MV,ST,JKP $1.98MRoofReplacement GeorgeWashingtonAnnex $0.34MMaintenanceUntilBuildingReplacement

PatrickHenry,CoraKelly $.013M

BleacherReplacement CoraKelly $0.04MStormwater Management JohnAdams $0.01MPressBoxReplacement T.C.Williams:KingStreet $0.07M

GrandTotal $11.99M

www.acps.k12.va.uswww.acps.k12.va.us9

Major Building Envelope Projects• CharlesBarrettFY2015$0.71million

– Repairexistingbuildingfenestrationtopreventwaterinfiltrationtothebuildinginterior.

– Repairexteriormasonrycladding.

www.acps.k12.va.uswww.acps.k12.va.us10

Major Building Envelope Projects• GeorgeMasonFY2015$0.2millionandFY2019$0.78million– Repairexistingbuildingfenestrationtopreventwaterinfiltrationtothebuildinginteriorandwaterproofsubsurfacewallsatbasementlevelelectricalroom.

– Replaceexteriorwindowswithnewenergyefficientassemblies.

www.acps.k12.va.uswww.acps.k12.va.us11

Major Building Envelope Projects• JohnAdamsFY2015$0.17million– Repoint/repairexteriorbrickmasonryandinstall/replaceexteriorsealants

• MountVernonFY2015$0.23million– Repoint/repairexteriorbrickmasonryandinstall/replaceexteriorsealants

– Remediatewaterinfiltrationandreplaceexteriordoors.

JohnAdams

www.acps.k12.va.uswww.acps.k12.va.us12

Major Building Envelope Repair

• RowingFacilityFY2015$0.42million– Replacefailingexteriorsiding.

www.acps.k12.va.uswww.acps.k12.va.us13

Major Building Envelope Projects• T.C.WilliamsMinnieHowardFY2015$0.14million– Repairexistingbuildingfenestrationtopreventwaterinfiltrationtothebuildinginterior.

www.acps.k12.va.uswww.acps.k12.va.us14

Major HVAC Projects • GeorgeMasonFY2015$0.13millionandFY2016$0.25million– Replacechillerand“Univent”wallunit– CurrentDeficiencies:

• Increasingvolumeof“DownTime”• Partsforrepairslessavailable• 85%ofschooldoesnothaveautomatedcontrols

• On‐goingcontrollerfailuresforthechillerpump

www.acps.k12.va.uswww.acps.k12.va.us15

Major HVAC Projects• MountVernonFY2015$0.17million:

– ReplaceRTU#6and#9whichhaveexceededtheirlifeexpectancy.

– CurrentDeficiencies:• Compressorfailures• Substantialrusting• Controlsnotintegrated

www.acps.k12.va.uswww.acps.k12.va.us16

Major HVAC Projects• DouglasMacArthurFY2015$1.03million:– ReplaceoutdatedengineeredairunitsRTUs#1through#5

– ReplaceRTUs#8,#9,#14,#15whichhaveexceededtheirlifeexpectancy

– CurrentDeficiencies• Constantleakrepairs• Compressorsfailing• Condensationrusting• Controlsoutdated• Partsforrepairsnolongeravailable

www.acps.k12.va.uswww.acps.k12.va.us17

Major HVAC Projects

• FrancisC.HammondFY2016$0.29million– ReplaceYorkAHU‐1,AHU‐3andAHU‐6– Replacechilledwaterpumps

• JamesK.PolkFY2018$0.32million– ReplacelibraryRTUs– UpgradeiVu controlsystemandintegratewithexistingcontrolsystem

FrancisC.Hammond

www.acps.k12.va.uswww.acps.k12.va.us18

Major Elevator Projects

• FrancisC.HammondFY2015$1.13million– AddsasecondADAelevatortoprovidedirectaccessfromthemainlobbytoalltheclassroomsandthemediacenter(deferredfromFY12)

• CharlesBarrettFY2017$0.27million– Replaceexistingelevator– Currentdeficiencies:

• Controllerisoutdated• HigherVolumeof“DownTime”• Approximately20ServiceCallsduring2012

www.acps.k12.va.uswww.acps.k12.va.us19

Major Roof Projects• GeorgeMasonFY2016$0.26millionandFY2019$0.95million– GymRoofReplacement– MainBuildingRoofReplacement

• GeorgeWashingtonFY2016$1.24million– Replaceoutofwarrantyexistingroofsystemtoincreaseinsulationandlowerenergyuse

GeorgeWashington

www.acps.k12.va.uswww.acps.k12.va.us20

Major Roof Projects• JohnAdamsFY2016$2.1million

– Replaceoutofwarrantyexistingroofsystemtoincreaseinsulationandlowerenergyuse

www.acps.k12.va.uswww.acps.k12.va.us21

Transportation Facility Project• UpgradeTransportationFacility

– FY2015$1.98millionforparkinglotexpansion

– FY2017$6.50millionforbuildingupgradeandphase2ofparkinglotexpansion

www.acps.k12.va.uswww.acps.k12.va.us22

Division‐Wide Projects

• ProjectPlanning$0.40millionannually– Improveprojectplanningforprojectsatleast1 to2yearspriortotheexecutionofthework.Allowstimeforproperscoping,costestimating,coordinationandpermitting

• EmergencyRepairsFY2015‐2024$0.96million– System‐widerepairstobuildingsystemsthataffectsafetysuchasbrokenpipes,hotwatersystems,roofleaks,andbrokenwindows

www.acps.k12.va.uswww.acps.k12.va.us23

Division‐Wide Projects• CodeComplianceRequirementsFY2015‐2024$1.06million– System‐wideupgradestoexistingfirealarmsystemsorotherregulatoryupgradesasrequiredtocomplywithnewfirecodesordirectivesfromtheCityFireMarshal/CodeEnforcement

• Furniture,Fixtures&EquipmentFY2015‐2024$4.05million– Additionandreplacementoffurniture,fixturesandequipmentaspartoftheroutinereplacementcycleorasnecessaryforemergencies

• SchoolBusesandVehiclesFY2015‐2024$6.62million

www.acps.k12.va.uswww.acps.k12.va.us24

Key Decisions

• Provideconcurrencewithprojectpriorities.• ProvideconcurrencewiththelevelfundingstrategytoaddressthegapbetweentheSchoolBoardandCityCouncil.

www.acps.k12.va.usInterimSuperintendent SchoolBoard

KarenA.Graf,ChairmanKellyC.BoozRonnieCampbellWilliamE.CampbellPatriciaAnnHennig

StephanieA.KapsisChristopherJ.LewisMarcWilliamsJustinKeating,ViceChairman

Dr.AlvinL.Crawley

Staff Contact Information

EducationalFacilitiesWilliamFinn,Director

TraceyArmah,FinancialAnalyst

Planning,Design&ConstructionAndreaFeniak,Director

LaurelHammig,Planner&GISSpecialistAlexAlexander,FacilitiesEngineer

703‐461‐4168