View
4
Download
1
Category
Preview:
DESCRIPTION
profile
Citation preview
Company Profile
Park Centra, 1001, 10th Floor, NH-8, Gurgaon - 122002
Company Profile
1
“Excellence in Comprehensive, Cost Effective
&
Sustainable Solutions”
Company Profile
2
BACKGROUND
HN Company was established in 1997 with an objective to provide complete solution of problems started
from planning to implementation of work. The quality and timely execution of work is top priority of the
company. After passing juvenile stages of establishment, the company extended its scope of work and
area of expertise in various infrastructural works. The horizon of company extended to various fields to
the satisfaction of clients, which is evident from the credentials issued by the clients. During the formation
of the company, various targeted subsidiary units were formed to handle socialized works separately for
better management practices for faster growth. Under the evolutionary changes, the planning and
consultancy umbrella of HN Company, the units were developed as separate companies. With the
evolutionary changes in policy, the planning and consultancy group has been designated as HN
Business Consultants (HNBC) to bear the responsibility of consulting services and eventually expended
with the inclusion of various specialized sectors. The HNBC was formed in 2011 to function as separate
company and registered under Registrar Firm and Society under the companies act, 1956.
The capacity enhancement of HNBC started with objective to provide proper solution of problem in cost
effective manner. The integrated approach with ensured sustainable conservation and management of
natural resources is our prime concern. The input of subject expert having National and International
repute in technological intervention is used to cope up with the environmental and developmental issues
and problems. Our capabilities range from project identification to assessment and to provide sustainable
planning, which provide us distinct recognition in the consultancy sector. Better planning and latest
technologies makes the projects viable as well as beneficial to the target groups. We provide consultancy
services in the following sectors;
Water Resource Conservation
Water And Wastewater Management
Environment And Environmental Safe Guards
Forest And Ecology
Biodiversity Conservation
Nonconventional Energy
Architecture And Heritage Conservation
Advance Technological Intervention For Cost
Effective Solutions
Infrastructure Planning And Design
Wise Use Of Natural Resources Without Destruction
Risk Assessment And Risk Management
Social Environment And Stakeholder’s Concern
IEC And Public Awareness
Sanitation And Health& Hygiene
City Development Plans
Road And Transport
Tourism And Ecotourism
HN Company Established in
1997 having annual turnover of
Rs. 220 Cr (2011-12)
HNBC came into existence in
2011, under the umbrella of HN
Company
Nationally and Internationally
Experienced, Qualified and
Reputed Experts especially in
Water Resources, Environment
and infrastructure
development.
Client Satisfaction and Timely
action is our Motto
Company Profile
3
VISION AND MISSION
HNBC is offshoot of the HN Company and formed with an objective to accomplish the total solution of environmental problems and sustainable perspective planning through its vision and mission
Vision Statement
“HNBC is committed to be solution provider with integrated approach through experienced and qualified expert’s vision. Defining the problem and issues for techno-economically appropriate
solutions”
Mission Statement
HNBC endeavours to be a “one-stop consultancy” delivering, optimal solutions to all your environmental concerns. Our basic goal is to integrate environmental, ecological health and human safety considerations in our company strategy and to capitalize on environment driven opportunities. We vow to provide value driven output through i) value added and cost effective services to the clients, ii) to improve current practices of the industry through green solution for sustainable development, iii) to find out opportunity to work with the communities; and iv) to implement, conscious minded decisions to mitigate any adverse impact on the environment.
OUR STRATEGIES
Our business strategies are to cater the need of the projects to the best satisfaction of the client. Time
and quality assurance of the deliverables and commitment towards work is our priority and we do adhere
with ToR conditions as may agree for. Our strength is qualified and experienced experts input in the
project to provide best planning alternate. We have and to develop our strength as per requirement of
project and complete task in professional manner. The recognition of our work depends on our strong
technical and professional footings to establish our self in the market.
We are efficient of providing specialized services for preparation of Master Plan, conducting Feasibility
Studies in different areas/ issues, preparation of Detailed Project Report (DPRs) with specific details of
design and drawings, cost estimates, institutional and financial framework, operation and maintenance
plan etc; conducting environmental and social impact assessments, impact evaluations of projects,
project planning, project management and monitoring during and post project implementation including
Water Resources, Solid and Hazardous Waste management, sewerage and drainage system, water
supply system, transport planning and development of road & flyovers.
Our strength is our knowledgeable technical staff and experts of various disciplines that involve
engineers, environmental scientists, planners, architects, geologists, public outreach specialists,
economists, policy experts, social scientists, and legal and regulatory analysts. The reference material
requires for current affair for latest technologies and conducive designing of work is part of our
documentation division. Instrumentation in support of investigation is equipped to strengthen the
technical team for firsthand information, besides the secondary data collected and available to us for
given project.
Our Associates provide authentic data and investigation reports by using latest techniques and software
for better planning. The field staff engaged in survey and investigation is technically sound in operation
of equipment’s and well versed to technology. Our association with academic institutions supports in
academic input and upgraded advance techniques. On shore and offshore input for special works are
Company Profile
4
being taken from the individual capacity as well as institutional support to attend complicated issues.
Nevertheless, our approach to the work is team work where experts of the desired disciplines are
involved and work together for the appropriate solution of tackling issues. Computer software is in
support to the analysis of data interpretation and modeling to thrive conclusive options.
OFFICE DETAILS
Office Address / Tel. Nos.
(Head Office – India)
HN Business Consultants
Park Centra, 1001, 10th Floor,
NH-8, Gurgaon – 122002
Tel. nos. 0124 – 4035 113 / 114
Fax no. : 0124 – 4035 115
Email : info@hnbc.co.in
Delhi Office
(Present Operation)
C-5/8, Ground Floor,
Safdarjang Development Area,
New Delhi-110 016
Telephone: 011-26533690,
E-mail- info@hnbc.co.in
Contact Details:
info@hnbc.co.in www.hnbc.co.in
Chairman & Managing Director
HN Business Consultants Email: cmd@hnbc.co.in Cell No.: 91 9810788092
Dr. S. M. Misra Executive Director
HOD, Water Resources E-mail : shiv.misra@hnbc.co.in Cell No: 91 9873979586
Company Profile
5
ORGANIZATION AND STAFFING
HNBC is subsidiary of HN Company providing environmental consultancy services, water/wastewater
management, infrastructure and technical services through employing experienced professionals, technical
experts and managers, having substantial expertise in the area of infrastructure, environment, health, safety,
and resource management.
Chairman and Managing Director
Executive Director Operations
Director Finance
Vice President
Finance
Director Administration Director Operations
Vice President Admin
Vice President Projects
(Ops)
Vice President Business
Development
Sr. Accts. Officer Asst. Vice
President Admin Project Manager
Office
Secretary
Executive Director
Finance
Executive Director Administration
Accountant
Asst.
Accountant
Administrator
Sr. Manager
Sr. Engineer
Field Staff Asst.
Administrator Asst. Manager Engineer
CAD & Auto
Desk
Manager
HNBC- Organizational Structure
Company Profile
0
Chairman & Managing Director
Executive Drector Technical
Scientist Pool
Limn
olo
gist
2
Enviro
nm
entalsist
7
Bio
techn
olo
gist
Agricu
lture
Scientist
Micro
bio
logi
st
Ecolo
gist
2
Engineering Pool
Civil
Engin
eer
2
Mech
anical
2
Hyd
rolo
gy
2
Ch
emical
1
Structu
ral
2
Transp
ort
1
Enviro
nm
ental
3
GIS Pool
GIS Exp
ert
2
Social Scientist
Pool
Social Scien
tist
2
Tech
nic
al S
tren
gth
Tech
nical Stren
gth
Technical Support Staff (30 No.)
HNBC- Technical Strength
BUSINESS SECTORS
Company Profile
6
BUSINESS SECTORS
HN group of companies are working in diverse fields which include the turn key projects in the field roads and highways, small hydro-electric plants, non-conventional energy, housing and real estate, development of specific economic zone while HNBC is providing consultancy services in different sectors Water, Environment, Energy, Infrastructure, Natural Resource, Social Development and GIS. Important areas of consultancy services being provided by HNBC are as under;
Water Lakes & Wetlands
Rivers
Groundwater Recycling & Reuse
Water Resources Management
Environment Env. Impact Assessment
Env. Management plan
Environmental Audit Solid Waste
Hazardous Waste
Air Quality
Energy Solar Energy
Hydro Power
Energy Efficiency
Energy Audit
Infrastructure
Drinking water
Wastewater
Drainage & Storm water Desalination
CDP
Real Estates & SEZ
Roads & Transport Landscaping
Eco-planning
Rural Development
Natural Resource Land & Soil Management
Sustainable Agricultural Practices
Forests
Silvi-culture
Natural Resource Management
Social Development Information, Education and
Communication (IEC) development
Socio-economic Study
Social Impact Assessment
Rural Development
Training & Capacity Building Institutional Development
and capacity Building
GIS GIS Mapping
Spatial database designing services
GIS Modeling
Data model designing
GIS application consultancy
HN Company
HN Business Consultants Pvt. Ltd.
HN Special Economic Zone HN INFRA
HN infra deals in Execution and Turn Key Projects in following sectors;
Road and Highways, Energy and Hydro-electric
Real estate
Telecommunication
Sewerage and Sanitation Border Fencing
River Protection
HN SEZ deals in the field of Development of Special Economic Zones, Tourism Related Infrastructure, Shopping complexes and Malls.
Company Profile
7
FIELDS OF RELEVANT SPECIALIZED AND AVAILABLE SERVICES
HNBC has excellent consulting capability in various sectors viz. Water Resources
Management, Environment Management, Energy, Infrastructure, Natural Resources
Management, GIS and Social Sectors which comprises all phases from conceptualization
to implementation along with the development of institutional framework and capacity-
building. The wide range of areas covered are:
I- WATER RESOURCE MANAGEMENT
Management of water resources is one of the global challenges in the 21st Century as the demand of this vital resource is increasing day by day on the one hand and its quantity and quality is deteriorating with increasing human pressure on the other hand. Considering the water resources as key element of our life support system, HNBC provides solution in the field of water resource management with its unique and innovative technologies. Our experts in water resource management are undisputed leaders in management of inland waters with an array of experience and expertise in planning and designing the projects for various state and central agencies under NLCP/NRCD and other agencies. We develop management plans for:
Lakes and Wetlands
Reservoirs and Tanks
Rivers
Ground water
Water Resources
Environment Management
Energy
Infrastructure Development
Natural Resources
GIS & Mapping
Social
Company Profile
8
EXPERIENCE OF HNBC SPECIFIC TO THE FIELD OF WATER RESOURCE & WATERSHED MANAGEMENT HNBC having experts, undisputed leaders from different domains having experience and
exposure in the field of water resources management in various part of India for last three
decades. We were involved in planning, designing and execution of projects related to
watershed management, eco-restoration of lakes, wetlands and rivers in collaboration with
State and Central Government and other line departments. The major modules covered
under watershed conservation, Management & Planning are:
Macro & Micro Watershed
Assessment
Watershed Modeling through
SWAT, BASIN & other GIS enabled
Models
Hydrological Assessment
Water Quality Assessment
Ecosystem health Assessment
Water Budgeting & Water Balancing
Sediment Yields
Nutrients Loading & Nutrients
Budgeting
Wise Use of Resources
Planning & Designing sewage & solid
waste management in urban watershed
Catchment Area Treatments
Control over Point & Non-point Pollution
Soil & Moisture Conservation
Abatement of Siltation in inland waters
Stakeholders’ Consultation on uses &
entitlement issues
IEC & Capacity Building
Riparian Rights
Multidimensional Approach- for Watershed Management
II- ENVIRONMENT:
Developmental activities are often associated with varied impacts on the environment. Accelerated pace of infrastructure development and urbanization raised parallel concerns for environmental management and restoration plans. HNBC offers state of the art services in comprehensive solutions related to environmental restoration and management, which include services in following sectors:
Water Quality & Quantity
Ecology & Livelihood
Watershed
Company Profile
9
Environment Impact Assessment
Environment Management plan
Environmental & Industrial Audit
Solid Waste management
Hazardous Waste management
Environmental Modelling
III- ENERGY:
HNBC provides comprehensive services in energy sector including environmental, engineering, and construction solutions associated with energy projects. Our expertise in the field of conventional and non-conventional energy projects allow us to successfully complete the projects including transmission and distribution projects. We specialize in Hydropower, which is one of the most vital sources of energy for an environment friendly future. HNBC offers services and solutions in the following sectors:
Solar Energy
Hydro Power
Energy Efficiency
Energy Audit
Power Saving Devices
IV- INFRASTRUCTURE:
HNBC offers services in the field of infrastructure development with experienced design and architects professionals on board, and create solution-driven, cutting-edge international design. Having strong commitment to sound and sustainable design our practices are techno-economically feasible and environmentally conscientious. HNBC has a vast experience in the design and integration in various sectors of Township, Retail, Hospitality, Healthcare, Commercial and Education with varied and modulated requirements. HNBC has also an excellent track record in all aspects of
road development projects, including planning, feasibility
studies, detailed project preparation, preliminary and
detailed design, construction supervision, project
management, technical advice and audits, operation &
maintenance including studies and project preparation for
private sector participation, under BOT or Annuity or other
feasible system. HNBC has been involved in design of
state of the art for developing roads and highways mainly
in North Eastern States of India.
Company Profile
10
We have reputed and well experienced architects and design professionals on board, and
create solution-driven, cutting-edge international design. Having strong commitment to
sustainable design, and practice a holistic and environmentally conscientious approach. We
have the skills of low housing development, economical advisory, IEC and Community
Mobilization, Capacity Building, Risk Management and Administration activities and hence
we offer sustainable housing to the economy. We offer integrated expertise of the HNBC
and KGD India and together we seek your permission on the appointment of the
Consultancy of the State in order to execute the program and provide technical support to
enable the State of Nagaland to redevelop all existing slums in a holistic and integrated way
and to create new affordable housing stock in a very planned and assimilated manner.
HNBC deals in following sectors of infrastructure development:
Drinking water
Wastewater
Drainage & Storm water
Desalination
CDP & Master Plan
Real Estates & SEZ
Roads & Transport
Landscaping
Eco-planning
V- NATURAL RESOURCES MANAGEMENT:
Management of natural resources is a vital issue as increasing demand on finite natural resources vis-a-vis poor resource management is causing degradation of natural resources. We, at HNBC provide sustainable solutions for natural resources management through the use of multi-disciplinary teams able to take a holistic approach of natural resource management encompassing technical, financial, economic, and social factors. We deal in following sectors of Natural Resource Management:
Land & Soil Management
Sustainable Agricultural Practices
Forestry & Silvi-culture
Natural Resource Management
VI- GIS & MAPPING:
HNBC deals in Geospatial Solutions with turn-key solutions for the Survey works, Remote Sensing & GIS, LIDAR Data Processing & Mapping, and GIS Software Customization. Our vast experience and innovations have allowed us to expand into a new era by offering leading- edge technological services in serving our customers. We offer GIS related services in following fields:
Map digitizing & analysis
Digital elevation models
Spatial & hazard analysis
Classification, spatial & spectral enhancement
Field operation
Company Profile
11
VII- SOCIAL:
Information, Education and Communication play a pivotal role in awareness building,
mobilizing people and promote development participatory through advocacy and by
transferring knowledge, skills and techniques to the people and stakeholders under various
projects. It is also critical for bringing about transparency in implementation of the
programmes at the field level and for promoting the concept of accountability and social
audit. With our experts and experienced team, HNBC offers a wide array of services in social
sector which include academic studies to implementation of projects in the field.
Information, Education and Communication (IEC) development
Socio-economic Study
Social Impact Assessment
Rural Development
Training & Capacity Building
Institutional Development and capacity Building Our Associates for Environmental Monitoring & Engineering Survey:
Environmental Monitoring:
In any environmental project, qualitative and quantitative assessment of various physico-chemical and biological parameters are significant for characterization of ecological health and to assess the changes and alterations caused by unsustainable development processes. Thus, HNBC is taking services of their associates M/S. Analitika Eco Lab Pvt. Ltd., an approved laboratory by Ministry of Environment & Forests (MoEF), GoI, under EPA 1986 offering services in the field of environment monitoring and assessment. This laboratory is well equipped and having wide range of essential instruments such as AAS, GC, Spectro-photometer, HVS and RDS etc. for the characterization and quantification of pollutants generally present in the environment.
Topographical & Engineering Survey:
Our associates GLOBAL SURVEYOR is a recognized and experienced survey company and provide survey data and information as may be required for engineering, and scientific planning. The firm is well equipped with modern and sophisticated equipment, instruments which are necessary for carry our desired field survey. Global Survey has also expertized in costal and specialized for bathymetric survey. Authenticity of data and accuracy in survey and interpretation of data for proper planning is credibility of the Global Survey.
Company Profile
12
SERVICES WE OFFER: HNBC provides consultancy services in various sectors of environment and infrastructure as per demands of the client, which includes management of various sectors namely, Water Resources, Environmental & Natural Resources, Infrastructure Development, Energy, GIS & Mapping along with Social sector. Besides we provide techno-economically feasible technological intervention for total solution of problem as suitable to site and conditions. We deal with the various components under the above sectors as summarized under:
E
Feasibility And Pre-feasibility Reports
Detailed Project Reports
Management Plan
Project Management Consultancy
Design And Construction Supervision
Project And Proposal Appraisal
Technology Advisory Services
Company Profile
13
KEY TECHNICAL STRENGTH
Company Profile
14
KEY TECHNICAL STRENGTH
S.No
Discipline Qualification Experiences Area Of Expertise
1. Principal Water Resource Expert
Ph.D 30 Years Watershed Management
Water Resource Conservation & Management
Sustainable Eco-Technology For Environment Conservation
2. Principal Advisor Ph.D 35 Years Watershed Management
Soil Contamination & Mitigation
Hazardous Waste Management
Environmental Policy & Legislation
3. Urban Sanitation Expert
M.E (Environmental
Engineer)
35 Years Sewerage & Sanitation
4. Hydrological –Geotechnical Expert
M.E (Soil Dynamics)
30+ Years Hydrology & Geo-Technology
5. Urban Planner Masters In Town & Country Planning
25 Years Urban Planning /Landscape Architect
6. Water Supply & Sewage Expert
M.E (Structural Engineer)
35 Years Water Supply & Sewage
7. Senior City Sanitation Expert
Ph.D 35 Years Sewerage & Sewage Treatment
8. Senior Environmental Experts
Ph.D 15 Years Lake & River Conservation
Aquaculture
Bio-Manipulation & Bioremediation
Aeration Of Limnetic Ecosystem
Pollution Prevention
9. Hydro-Geologist Ph.D 15 Years Hydrology & Geology
10. GIS & Remote Sensing Expert
Ph.D 10 Years Gis & Remote Sensing Watershed Planning
11. Senior Biologist Ph.D 15 Years Terrestrial & Aquatic Biodiversity
Company Profile
15
12. Wild Life Expert Ph.D 10 Years Wild Life Conservation
13. Senior Environmentalist
Ph.D 10 Years Environment Conservation Lake Conservation
14. Senior Limno-Chemist
Ph.D 10 Years Limno-Chemistry, Water Quality
15. Financial Expert C.A 15 Years Institutional & Project Finance
16. Social & Institutional Expert
Masters 25 Years IEC & Capacity Building
17. Landfill Design Expert
M.E (Environment)
10 Years Landfill Design Expert
18. Tourism Expert Ph.D 10 Years Tourism & Eco-Tourism
Company Profile
16
DETAIL EXPERIENCE OF HNBC
INCLUDING THAT OF PARENT
COMPANY
17
DETAILED EXPERIENCE OF HNBC INCLUDING THAT OF PARENT COMPANY
S.No. Name of work/project and location, with Work order/LOI No. and Date.
Name/ Address of Clients
Value of Work
(Rs. in Cr)
1 Pollution Abatement Of Rivers Diphu And Dhanseri And Solid Waste Management At Dimapur, Nagaland - Completed And Submitted To MoEF For Financial Assistance
PHED, Govt. of Nagaland
3.22
2 Rejuvenation & Management Of Raj Pukhuri, Dimapur, Nagaland Under NLCP Guidelines - Completed And Submitted To MoEF For Financial Assistance
PHED, Govt. of Nagaland
0.80
3 Rejuvenation & Management Of Padam Pukhuri, Dimapur, Nagaland Under NLCP Guidelines - Completed And Submitted To MoEF For Financial Assistance
PHED, Govt. of Nagaland
0.80
4 Rejuvenation & Management Of Govt. Fisheries Pond, Dimapur, Nagaland Under NLCP Guidelines - Ongoing
PHED, Govt. of Nagaland
0.70
5 Rejuvenation & Management Of Jor Pukhuri, Dimapur, Nagaland Under NLCP Guidelines - Ongoing
PHED, Govt. of Nagaland
0.70
6 Sustainable Conservation And Management Of Diphu River As Per NRCP, MoEF Guidelines - Ongoing
PHED, Govt. of Nagaland
3.50
7 Construction of 100 Bedded Urban Hospital at Chumukedima under Dimapur District. PWD (Housing)
10.56
8
Housing for Urban Poor at Dimapur under ISHDP. PWD (Housing)
26.34
9 Construction of Border Fencing along Indo-Bangladesh Border in Meghalaya State under Phase II, (Jaliakhola to Hengaria, BP No. 1299 to BP No. 1304) - Package No. I.
N.P.C.C Ltd., Shillong
16.13
10 Construction of fencing alongwith Border Road for certain stretches of Meghalaya Sector along Indo-Bangladesh Border (IBB) from Baghmara to Phanda near (BP No. 1158/7S) to near (BP No. 1162/6S) - Package III.
N.P.C.C Ltd., Shillong
7.98
11 Strengthening the existing two lane pavement for the portion from km 235.800 to km 263.000 in the state of Manipur. PWD, Manipur
33.89
12 Pollution abatement of Rivers Dhansiri and Diphu at Dimapur Town. PHE Nagaland
44.60
13 Construction of 24 Nos Type II Qtrs in G+II in 4 blocks and 3 Nos SM Barrack in G+II in 1 Blocks with allied services and development works for Assam Rifles at Shokhuvi (Package XII).
N.P.C.C Ltd., Shillong
1.87
14 Construction of 12 Nos Type II Qtrs in G+II in 2 blocks, 12 Nos Type III Qtrs. In G+II in 2 blocks and 3 Nos SM Barrack in G+II in 1 Blocks with allied services and development works for Assam Rifles at Shokhuvi (Package XIII) Phase II.
N.P.C.C Ltd., Shillong
1.97
15 Construction of Casualty Ward at Dimapur under Referral Hospital
PWD (Housing) Kohima
3.67
16 Construction of Road from NH-39 to Referral Hospital at Dimapur
PWD (Housing) Kohima
2.35
17 Construction of Treatment Block, Dimapur under Referral Hospital Project.
PWD (Housing) Kohima
2.29
18 Contruction of Boundary Wall for Referral Hospital Projects Dimapur
PWD (Housing) Kohima
0.52
19 Airconditioning work for Referral Hospital Project at Dimapur PWD (Housing) Kohima
4.12
20 Construction of 1.5 KV T.E Building (PH-I) and 1 No. Type-II S/Qtrs. at Aghunato, Nagaland.
B.S.N.L Civil Division Dimapur. Nagaland
0.21
18
21 OFC Laying on route Naharlagan-Yupia Section in Arunachal Pradesh.
T.C.I. Ltd. (A Govt. of India
Enterprise)
0.23
22 Construction of OFC Laying on Route Tuensang-Lonkhim-I (Tuensang to 11 Km point towards Longkhim) under Nagaland Telecom District, Dimapur
T.C.I. Ltd. 0.23
23 OFC Laying on Route Mokokchung-Chare-II (19 km point of Mokokchung/ Chare to 22 Km point)
T.C.I. Ltd. 0.08
24 OFC Laying on Route Mokokchung-Chare-II (Mokokchung 11 km point to 19 Km point)
T.C.I. Ltd. 0.17
25 U.G Cable Laying & Associated work; (a) Secondary cable from Nagarjan Cabinet to Pillar 81 & 82, (b) Distribution of Pillar 81 & 82.for OCB Exchange expansion work at Dimapur work at Diampur under GMT. Nagaland
T.C.I. Ltd. 0.07
26 Construction of cable duct 12 ways (11+4 OFC) from T.E to MH-5 and 4 ways from MH-5 to MH-11 to T.E Chumukedima. Nagaland
B.S.N.L, Civil Division, Dimapur
0.51
27 Partition work for office of DET (O.C.B) and ladies Dormitory in T.E Building at Dimapur.
B.S.N.L Civil Division, Dimapur.
0.05
28 Partition and furnishing work for C.G.M’s chamber along with PA and visitors room in T.E Building Dimapur Nagaland.
B.S.N.L Civil Division, Dimapur.
0.02
29 Construction of 8 Nos. Type-III for Assam Rifles at Mokokchung, Nagaland.
N.P.C.C Ltd., Shillong (A Govt. of
India Enterprise)
0.90
30 Construction of OFC laying work on route Wokha Town to Doyang Hydro Project. 25.85 km. PO.
D.G.M (ES & P) I.T.I Ltd. Kolkata.
0.67
31 Construction & Improvement of 7.1km road from Khopanallah to Assam Riffle Pump House Sukhovi ARTC& S, Nagaland
N.P.C.C Ltd. Shillong (A Govt. of India
Enterprise)
1.94
32 Laying OF Cable from Kohima T.E to T.E Phek, Nagaland Part-III
B.S.N.L, Dimapur 1.01
33 Construction of OFC laying work on route Wokha T.E to Mokokchung T.E 82.30 km.
D.G.M (ES & P) I.T.I Ltd. Kolkata.
2.08
34 Construction of Garrage I.B and Type IV Qtrs. at T.E Compound Dimapur.
E.E (C) B.S.N.L Civil Division, Dimapur.
0.28
35 Construction of 8 Nos. Single JCOS Qtrs. for Assam Riffles at Sukhovi.
N.P.C.C Ltd., Shillong.
0.22
36 Construction of 12 Nos. Type-II Qtrs. at Kashiram Basti. N.P.C.C Ltd., Shillong
0.47
37 Construction of 1 No. Single Men Barrack for 4 NCOS and 40 ORS for Assam Riffles at Sukhovi, Nagaland
N.P.C.C Ltd., Shillong
0.33
38 Construction of 2 Nos. S.M. Barrack accommodation for 8 Nos. NCOS and 80 ORS for Assam Riffles at Zunheboto.
N.P.C.C Ltd., Shillong
0.85
39 Construction of 12 Nos. Type-II Qtrs. for Assam Riffles at Zunheboto, Nagaland
N.P.C.C Ltd., Shillong
0.96
40 Construction of 100 bedded Hospital Building Complex for Assam Riffles at Sukhovi.
N.P.C.C Ltd., Shillong
0.95
41 Strengthening & Improvement of Dimapur Halflong Road. Under CRF (Group ‘A’ Road Works) Nagaland
Chief Engineer PWD (R&B) Nagaland,
Kohima.
1.83
42 Construction of protection work from erosion of Dhansiri river (ph-II) at Bridge Point 0-120 mtrs. Left Bank.
Irrigation and Flood Control, Dimapur.
0.33
43 Construction of Cable Duct 6 Ways (4+8) OFC from MH 36 (EX) to MH-48 (INC) in Tenyiphe Village to Sugar Mill colony at Chumukedima. Nagaland.
B.S.N.L, Dimapur 0.47
44 Construction of Cable Duct 6 ways (4+8) OFC from PC48 (EX) to Nuiland road crossing MH.59 (INC) at Chumukedima. Nagaland
B.S.N.L, Dimapur 0.26
19
45 Construction of 1 Nos. S.M Barrack(G+I) for Assam Riffles at Kashiram Basti, Nagaland.
N.P.C.C Ltd., Shillong
0.70
46 Construction of 8 Nos Type-III Qtrs with Allied Services and Development works for Assam Rifles at Jalukie.
N.P.C.C Ltd., Shillong
0.65
47 Supplying Fabrication & Laying P.S over head water tank for 2 Nos. S.M Barrack at Sukhovi.
N.P.C.C Ltd., Shillong
0.04
48 Strengthening & Improvement of Dimapur-Dhansiripar Ganesh Nagar Road. (35 Km), Nagaland
Chief Engineer PWD (R&B) Nagaland,
Kohima
5.39
49 Construction of 24 Nos. S.M. Barrack and 48 Nos. Type-II Qtrs. (G+II) in 8 blocks for Assam Riffles at Zunheboto, Nagaland.
N.P.C.C Ltd., Shillong
9.32
50 Supply of Equipment for Trauma Centre Dimapur. Directorate of Medical Service
Nagaland, Kohima
0.90
51 Construction of Hill Type Building for Accident and Trauma Center at Dimapur Civil Hospital,
Medical Engineering, Govt. of Nagaland
0.37
52 Construction of Hill Type building for Accident and Trauma Center at Mokokchung Civil Hospital,
Medical Engineering, Govt. of Nagaland
0.39
53 Up- gradation of District Civil Hospital at Phek (PMSP) Medical Engineering Division: Govt. of
Nagaland
0.45
54 Construction of 1 Nos. S.M Barrack(G+I) in 1 blocks and 60 Nos. Type-II Qtrs. (G+II) in 1 blocks with Allied Services and Development works for Assam Riffles at Sukhovi, Nagaland.
N.P.C.C Ltd., Shillong
0.33
55 Construction of 30 Nos. S.M Barrack (G+II) in 10 blocks and 60 Nos. Type-II Qtrs.(G+II) in 10 blocks with Allied Services and Development works for Assam Riffles at Sukhovi, Nagaland.
N.P.C.C Ltd., Shillong
10.31
56 Construction of 30 Nos. S.M Barrack (G+II) in 10 blocks and 60 Nos. Type-III Qtrs.(G+II) in 10 blocks for Assam Riffles at Kashiram Basti, Nagaland.
N.P.C.C Ltd., Shillong
11.83
57 Construction of Vertical Extension of newly Constructed Garage, IB & Type IV Qtrs. in T.E compound Dimapur.
E.E (C) B.S.N.L Civil Division, Dimapur.
0.08
58 Under Ground OFC laying work under Nagaland SSA in NE-II Telecom Circle " Zunheboto Exchange to Kilomi Village 46 Km"
ITI Ltd. (Govt. of India Enterprise)
0.78
59 Construction of Road for N.E Agri Expo including construction of Retaining wall Culvert and Steel Gate etc. at 4th Mile Dimapur.
Director Agriculture, Kohima: Nagaland
0.95
60 Construction of Anti- Erosion measure to Protect Mao Colony, Kuki Village and Assam Rifles Transit Camp at Dimapur from flood and erosion of River Dhansiri (s)
Chief Engineer (I & W) Bramaputra
Board Basistha: Guwahati -29,
Assam
1.60
20
COMPANY REGISTRATION &
FINANCIAL DETAILS
21
22
23
24
Recommended