RMS 3.0Contractor Mode

December, 2015

No official date for full switchover from QCS 2.38 to RMS 3.0 contractor mode

State of the RMS Support Contract Expect regular updates once per month

with many new features QCS 2.38 Training Video How Contractor Mode differs from QCS 2.38 Walkthrough of Contractor Mode setup

Agenda

Once RMS Contract resolved expect one video a month

First Video: Installing QCS 2.38 https://youtu.be/LvOwSRCBOSo

RMS Training Videos

No more QCS Site ID – everything based on Contractor ID

Ability to assign permissions Instant updates of information (no more

imports/exports) Ability to work offline and upload later Ability to attach files in many locations

How Contractor Mode Differs

Each contract must be assigned to a Prime contractor by USACE in RMS 3.0

USACE adds first staff member to contractor staff and sets them as administrator

Contractor sets up permissions for each staff member

Staff member logs in and selects prime contractor to access contracts

Contractor Mode Walkthrough

Contractor ModeAssignment of Prime Contractor by Govt.

Contractor ModeLogin, prime contractor selection, contracts

Power point file available at: http://rms.usace.army.mil/datafiles/RMSDec2015Ktr.zip

Conclusion