  • + RL 902.330

    + RL 903.080+ RL 900.520+ RL 900.160

    + RL 899.630

    + RL 900.950

    + RL 906.440

    + RL 906.920

    + RL 907.120

    + RL 900.710

    + RL 905.170

    + RL 904.340

    EXISTING INTERNAL PLANT

    EXISTINGRETAINING WALL

    PHARMACY BUILDING

    EXISTING BREAKOUTREFURBISH TO CREATE MODEL ROOM/ INFORMAL LEARNING

    EXISTING CLINICSIMULATION SUITE(AV UPGRADE)

    CLINIC

    DIRTY UTILITY

    STORE

    SIMULATION CLINIC

    PATIENTENSUITE

    CLINIC

    EQUIPMENT STORE

    FOYER STAIR

    ENTRANCE

    STAIR MALEWC LIFT

    TUTORIAL ROOM 2

    SIMULATIONCLINICS

    CLINIC LABORATORY SUPPORT

    AMENITIES

    AMENITIES

    NOTE B

    NOTE D

    NOTE A

    NOTE A

    NOTE D

    NOTE A

    NOTE ANOTE A

    NOTE C

    NOTE D

    NOTE E

    NOTE E

    NOTE A

    NOTE ANOTE ANOTE A

    NOTE ANOTE A

    NOTE F

    NOTE CNOTE CNOTE C

    NOTE A

    NOTE A

    SECTION 1SECTION 1

    SECT

    ION

    2SE

    CTIO

    N 2

    2182

    0 EL

    C D

    A10

    Floo

    r Pla

    n vw

    x.vw

    x

    29/3/19

    ©

    brewster hjorth architects

    Demolition Plan - Level 1

    Revision -

    Health Sciences Active Based Learning CSU Orange Campus

    29/3/19

    1:100 @ B1 + 1:200 @ A3

    DA13

    NOTE A

    EXISTING FACADE TO BE DEMOLISHED

    EXISTING INTERNAL PARTITION DEMOLISHED ALONG WITH ASSOCIATED DOORS

    NOTE B

    LEGEND - DEMOLITION PLAN :

    EXISTING WASH HANDBASIN DEMOLISHEDNOTE C

    EXISTING JOINERY DEMOLISHEDNOTE D

    EXISTING EQUIPMENT REMOVEDNOTE E

    EXISTING DOOR REMOVEDNOTE F

    DEMOLITION - LEVEL 1

  • + RL 902.330

    + RL 903.080+ RL 900.520+ RL 900.160

    + RL 899.630

    + RL 900.950

    + RL 906.440

    + RL 906.920

    + RL 907.120

    + RL 900.710

    + RL 905.170

    + RL 904.340

    EXISTING INTERNAL PLANT

    EXISTINGRETAINING WALL

    PHARMACY BUILDING

    COMMSAREA

    MECAREA

    GROUP WORKROOM 5

    GROUP WORKROOM 6

    SEMINARROOM

    TEACHINGLABORATORY 2

    GROUPWORKROOM 2

    GROUPWORKROOM 3

    GROUPWORKROOM 1

    STAIR

    LIFT

    LABORATORY ACCESS

    AMENITIESACCESS

    LABORATORY STORE

    STAIR

    NOTE A

    NOTE A

    NOTE A

    NOTE A

    NOTE A

    NOTE A

    NOTE B

    NOTE B

    NOTE B

    NOTE A NOTE A

    NOTE A

    GROUPWORKROOM 4

    STUDENTINTERACTION ZONE

    NOTE A

    NOTE A

    SECTION 1SECTION 1

    SECT

    ION

    2SE

    CTIO

    N 2

    NOTE A

    EXISTING FACADE TO BE DEMOLISHED

    EXISTING INTERNAL PARTITION DEMOLISHED ALONG WITH ASSOCIATED DOORS

    NOTE B

    LEGEND - DEMOLITION PLAN :

    EXISTING WASH HANDBASIN DEMOLISHEDNOTE C

    EXISTING JOINERY DEMOLISHEDNOTE D

    EXISTING EQUIPMENT REMOVEDNOTE E

    EXISTING DOOR REMOVEDNOTE F

    2182

    0 EL

    C D

    A10

    Floo

    r Pla

    n vw

    x.vw

    x

    29/3/19

    ©

    brewster hjorth architects

    Demolition Plan - Level 2

    Revision -

    Health Sciences Active Based Learning CSU Orange Campus

    29/3/19

    1:100 @ B1 + 1:200 @ A3

    DA15

    DEMOLITION - LEVEL 2

    DA13-Demolition Plan - Level 1Viewport-8

    DA15-Demolition-Plan-Level-2.pdfDA15-Demolition Plan - Level 2Viewport-10

Recommended