The Formwork Experts.
January 2013
Doka. The Formwork Experts.
Copyright by Doka
Contents
2 Doka presentation, January 2013
Umdasch Group
Executive Board
Facts and figures
Production
Products
References
Copyright by Doka
Doka headquarters, Amstetten
3 Doka presentation, January 2013
Total area: 350.000 m²
Copyright by Doka
Doka is part of the Umdasch Group
4 Doka presentation, January 2013
Doka Group Shopfitting Group
Copyright by Doka
Executive Board of Umdasch Group
5 Doka presentation, January 2013
Josef Kurzmann Doka Group
Dr. Andreas Ludwig Chairman
Helmut Neher Shopfitting Group
Copyright by Doka
Management of Doka Group
6 Doka presentation, January 2013
v.l.: Rainer Spitzer, Johann Strunz, Dir. Josef Kurzmann, Ludwig Pekarek, Jürgen Obiegli f. l.: Ludwig Pekarek, Rainer Spitzer, Josef Kurzmann,
Gregor Gaisböck, Jürgen Obiegli, Johann Strunz
Copyright by Doka
Umdasch Group
7 Doka presentation, January 2013
Consolidated revenues 2011
Umdasch Shopfitting Group
209 m. euros (22 %)
Doka Group
759 m. euros (78 %)
Total 968 m. euros
Copyright by Doka
Doka Group
8 Doka presentation, January 2013
Consolidated revenues 2006 – 2011 (million euros)
[+ 7 %] 759
[+ 24 %] 690
838
923
[+ 21 %]
[+ 10 %]
762 [- 17 %]
2006 2007 2008 2009 2010 2011
712 [- 7 %]
Copyright by Doka
Umdasch Group
9 Doka presentation, January 2013
Employee numbers 2011 (annual average)
Umdasch Shopfitting Group
1.460 (20 %)
Doka Group
5.437 (77 %)
Total: 7.114
Central support functions
217 (3 %)
Copyright by Doka
[+ 19 %]
4.397
5.227
5.874
[+ 19 %]
[+ 11 %]
2006 2007 2008 2009 2010 2011
5.478 [- 7 %] 5.238
[- 4 %]
Doka Group
10 Doka presentation, January 2013
Employee numbers 2006 – 2011 (annual average)
[+ 4 %]
5.437
Copyright by Doka
Doka organisation world-wide
11 Doka presentation, January 2013
Doka services customers’ needs with more than 160 sales centres in 70 countries.
Copyright by Doka
Vision
12 Doka presentation, January 2013
By providing economical formwork
systems and services for all sectors of
the industry, we aim at offering
construction companies the best
customer benefit so as to inspire
them and grow success jointly with
them.
Copyright by Doka
Mission
13 Doka presentation, January 2013
Partnership in business We want to be your best partner. Capability and dependability are
what we use to build long-lasting business relationships. These are
invariably solutions-oriented, and build on openness, reliability and
“good-as-our-word” hands-on quality.
Value-addition with capable specialists We keep pace with ever-more demanding customer requirements by
constantly evolving our core competences and thus optimizing
value-addition for our customers. Doka employees are capable and
motivated specialists, partners the construction companies can
consult at any time.
Customer benefit The basis of our long-term, sustained corporate success is our ability
to offer the highest possible customer benefit. With our innovative
and quality-assured products and service offerings, we support
construction companies worldwide in their endeavours to build
faster, better, more cost-effectively and safely.
Copyright by Doka
Doka production
14 Doka presentation, January 2013
Doka Metalworking (DMB)
Doka Woodworking (DHV)
Copyright by Doka
Doka production output
15 Doka presentation, January 2013
annual
Own production facilities
(Austria, Slovakia)
Formwork beams
10 million linear metres
Formwork sheets
4 million m²
Metal products
100,000 t
Plastic components
3000 t
Copyright by Doka
Formwork-beam production
16 Doka presentation, January 2013
Doka’s production facilities have several moulding
stations for the patented polyurethane end-
reinforcement. This significantly prolongs the
useful life of the beams.
Copyright by Doka
Formwork-sheet production
17 Doka presentation, January 2013
Doka produces an extensive range of formwork
sheets for many different areas of application. The
use of choice timbers, and careful glue-bonding,
together ensure the very highest quality.
Copyright by Doka
Framed-formwork production
18 Doka presentation, January 2013
The durability, dimensional accuracy and
stability of the frames are key quality criteria that
distinguish Doka framed formwork. Together with
their high-quality form facing, they allow superb
concrete results to be achieved.
Copyright by Doka
Floor prop production
19 Doka presentation, January 2013
The high load-bearing capacity of Doka floor props
is ensured by using only top-quality materials in
their manufacture. Doka’s state-of-the-art
production lines ensure superlative workmanship
and consistently high quality.
Copyright by Doka
The Doka range
20 Doka presentation, January 2013
Copyright by Doka
Product overview
21 Doka presentation, January 2013
Wall System
Climbing System
Floor System
Load-bearing Towers
System Components
Services
Safety Systems
Copyright by Doka
Wall Systems
22 Doka presentation, January 2013
Framed formwork Timber-beam formwork
Copyright by Doka
Wall Systems
23 Doka presentation, January 2013
Column formwork Single-sided formwork
Copyright by Doka
Floor Systems
24 Doka presentation, January 2013
Tableforms Timber-beam floor formwork
Copyright by Doka
Climbing Systems
25 Doka presentation, January 2013
Automatic climbing formwork Crane-lifted
climbing formwork
Copyright by Doka
Load-bearing Systems
26 Doka presentation, January 2013
Shoring towers Tunnel formwork Bridge formwork
Copyright by Doka
Working & protection
platforms
Guardrail systems
Safety Systems
27 Doka presentation, January 2013
Copyright by Doka
Protection screens Access systems
Safety Systems
28 Doka presentation, January 2013
Copyright by Doka
System Components
29 Doka presentation, January 2013
Formwork beams Formwork sheets
Copyright by Doka
System Components
30 Doka presentation, January 2013
Floor props Form-ties &
suspension cones
Copyright by Doka
Services
31 Doka presentation, January 2013
Engineering Rental service Formwork instructor
Copyright by Doka
Services
32 Doka presentation, January 2013
“Ready-to-Use” service Reconditioning service Doka-Training
Copyright by Doka
Doka Forum
33 Doka presentation, January 2013
The Doka Forum's 2,500 m² of
exhibition floor space showcases all
Doka’s formwork systems and
houses comprehensive training
facilities for Doka customers.
Copyright by Doka
bauma 2010
34 Doka presentation, January 2013
Doka made an impressive showing
at bauma 2010, where from April
19th to 25th, 100,000-plus trade
visitors took time to study the
exhibits in the 3000 m² hall built
specially for the exhibition.
Copyright by Doka
References
35 Doka presentation, January 2013
Construction companies worldwide
rely on the expertise, reliability
and “good-as-our-word” integrity
of Doka.
Copyright by Doka
Weiterstadt's "Medienschiff" centre, Germany
36 Doka presentation, January 2013
The formwork for the challenging
geometry of the "Medienschiff"
multifunction centre in the city of
Weiterstadt used a high proportion of
standard systems combined with
made-to-measure special formwork.
Copyright by Doka
Planet Planai, Austria
37 Doka presentation, January 2013
The swooping signature loop of the
Planet Planai valley station building
was propped with the new Staxo 40
load-bearing towers. Excellent
ergonomics and speedy progress
were characteristic of this build.
Copyright by Doka
Gotthard Base Tunnel, Switzerland
38 Doka presentation, January 2013
Quickly and easily, the forming
carriage adapts to the extreme taper
in tunnel cross-section, so cycle times
are kept extremely short. Forming up,
stripping out, lifting, lowering and
advancing are all fully hydraulic,
pushbutton-control operations.
Copyright by Doka
Tisza bridge, Hungary
39 Doka presentation, January 2013
Quickly the extra-wide superstructure
of the Tisza bridge in Hungary was
built in record time with the help of
two specially sized Doka free
cantilever travellers.
Copyright by Doka
Padre Adelino viaduct, Brazil
40 Doka presentation, January 2013
The MF240 crane-lift climbing
formwork kept cycle times short on
construction of the spectacular Padre
Adelino viaduct in Sao Paulo, so
progress of this build was
convincingly rapid.
Copyright by Doka
Rosewood Hotel, Abu Dhabi
41 Doka presentation, January 2013
Staxo 100 and Staxo 40 load-
bearing towers provided the
secure, economical propping for the
floor slabs of the Rosewood Hotel in
Abu Dhabi.
Copyright by Doka
Viaduct crossing the Wadi Adai, Oman
42 Doka presentation, January 2013
Doka developed its high-performance
special solution for these solid
hammerheads to utilise the
advantages of supporting
construction frames and Top 50
beam formwork.
Copyright by Doka
5th Avenue, USA
43 Doka presentation, January 2013
An automatic climbing Doka Xclimb
60 protection shield ensures
optimum safety for construction of a
52-floor residential tower in the heart
of New York.
Copyright by Doka
Thank you for your attention!
For more information please visit our
website:
http://www.doka.com/
https://www.facebook.com/dokacom
http://twitter.com/doka_com
http://www.youtube.com/user/doka
44 Doka presentation, January 2013