Systematic Safety in the real worldFew examples from The NetherlandsGijs (Chris) HoogerwerfSenior advisor Transportation Policies

Fromtacklinghighrisklocationsto

tacklingweakerspotsintraffic system

Blackspots(5ormoreinjuries/deathsin5yrs)inTheHague,2011-2015

AllcrashsitesinTheHague,2011-2015

SafetyapproachesinTheNetherlands

1997:ProactiveApproach:IntroductionofSustainableSafety(systematicapproach)

1970s:Constructionofmotorwaysandthrough

roadsoutsidebuilt-upareas

Num

ber o

f dea

ths

in tr

affic

1980s:ReactiveApproach:Legislation,information,education,surveillance

andinfrastructuralchanges

SustainableSafetyintherealworld

• 30km/hzones(19mph)inresidentialandcommercialzones(urbanarea)

• 60km/hzones(38mph)inruralareas• (Continuing)Separationofmassandspeedonarterialandcollectorroads:separatedbikepaths

• Safeintersectionsandcrosswalks

Implementationof30km/hzoneHardenberg,TheNetherlands

Centerline(dashed)

Beforeimplementation30km/uzone

Implementationof30km/hzoneHardenberg,TheNetherlands

Afterimplementation30km/uzone

Raisedintersection

Nocenterline!

Implementationof30km/hzoneHardenberg,TheNetherlands

Wideroadwidth(parking)

Beforeimplementation30km/uzone

Implementationof30km/hzoneHardenberg,TheNetherlands

Smallerroad->lessspeeding

Stillparkingpossibilities

Afterimplementation30km/uzone

Implementationof60km/hzoneRuralZoneinOmmen,TheNetherlands

Smallerroad->lessspeeding

Stillparkingpossibilities

Beforeimplementation60km/uzone:a80km/hroad

Implementationof60km/hzoneRuralZoneinOmmen,TheNetherlands

Smallerroad->lessspeeding

Stillparkingpossibilities

RuralRoadafterimplementation60km/uzone(2010)

Smallerroad->lessspeeding

Implementationof60km/hzoneRuralZoneinOmmen,TheNetherlands

Smallerroad->lessspeeding

Stillparkingpossibilities

RuralRoadafterimplementation60km/uzone(2016)

Smallerroad->lessspeeding

Implementationof60km/hzoneRuralZoneinOmmen,TheNetherlands

Smallerroad->lessspeeding

Stillparkingpossibilities

Intersectionafterimplementation60km/uzone

Implementationof60km/hzoneRuralZoneinOmmen,TheNetherlands

Smallerroad->lessspeeding

Stillparkingpossibilities

Afterimplementation60km/uzone

Alternativeforspeedhump:narrowtheroad.Onlyonecaratime

30km/hzones:Howwasitfinanced?

• Nationalprogramimplementation30km/hzones(50%subsidized)

• Politicalwill:investinsafetyandlivability• Combinedwithotherprograms:– Roadmaintenance– Neighborhoodimprovement– Upgradingstormwatersewers(climatechange)

• Startedin1997,by2010mostresidentialareashadbeentreated

Roadcrossing:islandsGroningen,TheNetherlands

Downtown

Roadcrossing:islandsGroningen,TheNetherlands

Officearea

Roadcrossing:islandsGroningen,TheNetherlands

Commercialzone

Roadcrossing:islandsAmsterdam,TheNetherlands

Downtown,nearCentralStation

Roadcrossing:islandsRotterdam,TheNetherlands

Downtown,nearCentralStation

InvestmentsinTransportation

Investments/City Utrecht* Groningen TheHague*

ImplementationofprojectsTransit €12.14 €5.80 €27.45

ImplementationofprojectsMotorVehicles €22.27 €1.50 €11.96

ImplementationofprojectsBicycleandTrafficSafety €25.13 €8.06 €32.45

Totalcosts €59.55 €9.03 €107.79

InEuro’sayear(2017),percapita

*UtrechtandTheHagueareinvestingalotinprojectstoimproveaccessibilitytocitycenterandworkareas(officezones)