FERROPANEL CONSTRUCTION SYSTEMS

Low cost and high

resistance

houses

Construction systems across timeFERROPANEL : the latest in construction tecnology

Stone

Clay

Concrete prefabricationWalls built In Situ-

Concrete form

The product

Expanded polystyrene addend to reduce the weight

Upper beam(Variable diameter)

Hydraulic and electric conduits

Window aperture

Columns

Lower beam (Variable diameter)

The panels include structure, conduits and metalwork

1. The house is carried to the building place in a small truck

House of 45m² areaLoad capacity : 1 tn

Construction process

The weight facilitates transportation to places of difficult access

3. Floor deck concrete pouring

2 . Pre-assembly stripping, compression and ground levelling

Construction process

4. The panels are tied up and electric, hydraulic and sanitary conduits are assembled

The panels are tied up with wires; specialized tools or skilled labor are not required

Construction process

5. Smelting of the columns and plastering with mortar

The mortar is pumped with a machine which allows to plaster in short time

Construction process

6. Finishing Bathroom fittings, kitchen, painting, etc.

Construction process

AdvantagesShort construction process times – 5

houses per day in projects of massive construction

Finished construction resists earthquakes and hurricanes of up to 160 mph

The lowest cost in Colombia

Generates local, formal and lasting employment

It’s possible to build in stages

Building stagesFirst stage: 24.4 m²

Second stage: 34.32 m²

Building stages

Third stage: 45 m²

Building stages

Fourth stage: 63 m²

Building stages

Solution!

Em

erg

en

cy!

FerropanelConstructions

Emergency accommodation

Ferropanel can accommodate families in the house itself during

the construction process!

Specially designed in case there are no resources to build the house

entirely

1. Ferropanel Assembles the panels

The structure is temporarily covered in plastic, enabling the house to work as a tent during the construction process

Emergency accommodation

Ready in less than 6 hours

The first step towards final accommodation

Adapts to any architectural design

The family can be sheltered during the construction process!

Emergency accommodation

2. Ferropanel makes the foundation and plastering by stages, the family does not have to vacate

or the family can do the plastering on its own

Emergency accommodation

Immediate shelter

Decent homes: safer and more secure than

tents

Progressive building without need for skilled

labor

No waste: the cost of the emergency

accommodation is itself an initial investment

towards final house

ObjectiveTo offer vulnerable population a fast, dignifying and solid solution

FERROPANEL CONSTRUCTION SYSTEMS

The best answer to a catastrophe

Contact: Germán Echeverry L.

Tel: (57)311 2173089 ferropanel@gmail.com www.ferropanel.over-blog.es