EXPLO 1.Why EXPLO? 2.Course Outline 3.Assessments 4.Safety Requirements 5.Field Trips 6.Projects

Preview:

Citation preview

EXPLO1. Why EXPLO?

2. Course Outline

3. Assessments

4. Safety Requirements

5. Field Trips

6. Projects

Why EXPLO?

1. You are a GENIOUS!

2. CEGEP Technical Programs

3. Trades School

CEGEP Tech ProgramsCreative & Applied Arts Science, Medical Studies

& Engineering Social Science &

Business Technologies

1. 3D Animation2. Graphic Design3. Illustration

Design4. Industrial Design5. Interior Design6. Professional

Photography7. Professional

Theatre

1. Biomedical Lab. Tech.

2. Civil Engineering Tech.

3. Diagnostic Imaging4. Electronics

Engineering5. Analytical

Chemistry6. Mech. Engineering

Tech7. Nursing8. Physical

Rehabilitation9. Radiation Oncology

1. Accounting2. Business

Management 3. Community

Recreation4. Computer

Science Tech.5. Social Service

Trade SchoolRosemount Tech. Centre Pearson Adult Voc. Centre

1. Electro mechanics2. Cabinetmaking3. Computer Graphics4. Furniture Finishing 5. Industrial Drafting6. Machine Operator7. Machining Tech.8. CNC9. Printing & Digital Layout

1. Food Services & Tourism• Baker• Butcher• Cooking• Pastry

2. Administration• Accounting

3. Health• Pharmacy Tech.• Medical Assistant

4. Dental• Dental Assistant

Duo-Tangs

• To be left in class

• Within – All handouts– Project plans– Readings / Questions– Assignments

Course Outline

Assessments

1. Clean Up 10 %

2. Tests 20 %

3. Tech Drawing 20 %

4. Final Project 50 %

Technical Drawing Rubric

Project Rubric

Machine Tests1. Jointer, Planer, Table Saw

– Written– Live Action

2. Written– Based on assigned readings (end of term)

3. Live Action– Demonstrate competence before machine use

1. Safety Goggles

2. Apron

3. Hair Elastic

Permission Form

Must be signed by Parent / Guardian and

returned to Mr. Robinson before any

machining may occur.

Operators Card

Name:

Date:

Machine/Tool:

Operation:

Dimensions:

Order of Operations

1. Technical Drawing

2. Machine Readings and Questions

3. Machine Tests

4. Operators Card

Clean Up Duties

1. Put Up Stools

2. Sweep Machines

3. Sweep Front Shop Floor

4. Sweep Back Shop Floor

5. Clean Glue Up / Finishing Room

6. Dust Collector

Field Trips

• RTC– Rosemount Technology Centre

• PACC– Pearson Adult Vocation Centre

Term Projects

Book Shelf

Table

Box

Bonus Projects

Pintail Skate Board

Bowl

Carving

Term 1

Book Case

Technical DrawingScale 1:2