Final Project: Bridge Building

Preview:

DESCRIPTION

Final Project: Bridge Building. Lior Shimonovich and Adam Drozdowski. Possible Designs. Suspension. Flatbed. Why we chose flat…. Stability Easier to build Lighter Time Material contraints. The building process. -Glue sticks together. The building process (cont’d). - PowerPoint PPT Presentation

Citation preview

Final Project:Final Project:Bridge BuildingBridge Building

Lior ShimonovichLior Shimonovichandand

Adam DrozdowskiAdam Drozdowski

Possible DesignsPossible Designs

Suspension

Flatbed

Why we chose flat….Why we chose flat….- StabilityStability- Easier to buildEasier to build- LighterLighter- TimeTime- Material contraintsMaterial contraints

The building processThe building process

-Glue sticks together

The building process (cont’d)The building process (cont’d)

-stick units together by glue

main structure

The building process (cont’d)The building process (cont’d)

The building process (cont’d)The building process (cont’d)

-The polymers were super-glued onto the bridges main structure

-Everything is clamped down

The building process (cont’d)The building process (cont’d)

The building process (cont’d)The building process (cont’d)

The building process (cont’d)The building process (cont’d)

-Road surface

The building process (cont’d)The building process (cont’d)

-More reinforcement

In ConclusionIn Conclusion

Our bridge can hold…