FIRST ADDENDUM TO WATER SUPPLY AND WASTEWATER TREATMENT

SERVICE AGREEMENT FOR THE GROVE AT WESLEY CHAPEL

COMPOSITE EXHIBIT A

Item Descri~tion - Panes

1. Sketches showing project boundary, project improvements, and easements to be dedicated 1-5 and transferred to the County.

Competitive Cost Analysis Data and Information

a) Project Engineer for County

b) Independent Engineer for developer

Summary - Competitive cost analysis and basis of negotiated reimbursement.

DEVELOPMENT BY

GROVE AT WESLEY CHAPEL PCU 06-256.M)

PARCEL BOUNDARIES OCTOBER, zoos

DEVELOPMENT

AREA APPROVED IN THE USA

R = 140LF

OFF SITE ( O A K W BLVD.):

NOTE: ACQUISITION ITEMS SHALL INCLUDE ALL APPURTENANCES (FlllINGS, VALVES, TEES, BENDS,RPZS, ETC.) FOR A COMPLETE SYSTEM.

OFF SITE WATER I I I IMPROVEMENT

EXISTING WATER

- - I..

111.

8" W C GRAVITY = 160 LF 12" PVCGRAVITY = 40LF SEWERMANHOLES = 2 TRIPLEX PUMPSTA ;. 1

NOTE: ACQUISITION ITEMS SHALL INCLUDE ALL APPURTENANCES (FIllNGS,VALVES, TEES, BENDS, ETC.) FOR A COMPLETE SYSTEM.

ROVE AT WESLEY CHAPEL PCU 06-256.00

PROJECT IMPROVEMENTS WASTEWATER

OCTOBER, 2009

- GRAVITYSEWER& MANHOLES TO PCU

MASTER WASTE WATER

EASEMENTS TO PCU

EXISTING EASEMENTS

ADDITIONAL EASEMEN NEEDED FROM KAZWE