Bhide & Hall Architects, P.A.

GREEN COVE SPRINGS

e s t . 1 8 7 4

Introduce Design Team

Project Approach

Schedule

Design Concepts

• Local Firm • Established in 1974

• 16 Employees • 6 Registered Architects

B h i d e & H a l l A r c h i t e c t s , P. A .

A R C H I T E C T S Bob McVeigh, Principal Brian Sawyer, Principal Wendell Hall, Principal Sandy Ciciora, Architect Paul Lutton, Architect Amit Vaswani, Architect P R O J E C T M A N A G E R S Jaime Mendoza

A R C H I T E C T I N T E R N S Ahmon Williams Alex Knoll Lauren Wells Patrice Garrett Peter Ryan C A D D T E C H N I C I A N S Ivette Crespo Dylan Deguzman

L A N D S C A P E A R C H I T E C T Castle Bay Design & Studio Jonathan Daniels, RLA M E C H A N I C A L E N G I N E E R M.V. Cummings Engineers, Inc. Wayne Kelly, P.A. C I V I L E N G I N E E R Michele Agee, P.E., P.A. Michele Agee, P.E.

S T R U C T U R A L E N G I N E E R JAMSE Engineering, Inc. John Miller, P.E. E L E C T R I C A L E N G I N E E R Haddad Engineering, Inc. Namir Haddad, P.E.

Wild Waters Recreational Facility

Typhoon Lagoon Water Park Expansion

Friendship Fountain

JAWS Universal Studios

Accessible Design

Subsurface Conditions

Project Schedule

Budget

Operations and Maintenance

Park Context

Fieldwork: Existing Conditions / Existing Drawings

Design Conference with Staff / Final Scope

Confirmed Layout Concept

Plans and Specifications

Bidding

Construction Administration

RESEARCH on Existing Conditions

V A L I D A T I O N M E E T I N G CONCENSUS PRO GRAM SCHEMATIC CONCEPTS

Design Criteria Confirm Project Scope Prioritize Budget Project Schedule

Site Plan Floor Plans Building Elevation Cost Estimate

Architect / City Staff Maintenance / Engineers

o Finalize Site Plan & Floor Plan o Outline Specifications o Building Systems o Cost Estimate

o Construction Plans & Specifications for Building Permit and Bidding

o Submission to Building Department o Cost Estimate

FINAL PLANS

DESIGN DEVELOPMENT

BIDDING

o Responses to contractor’s questions o Issue addenda

CONSTRUCTION

o On-site Construction Meetings - OAC

o Review/certify Contractor’s pay requests

o Site visits as needed

o Timely response to Contractor Request for Information (RFI’S)

o Submittal Review

o Finish color selection prepared for Owner’s review and approval

o Project punch out

o Delivery of close-out documents

Select Des ign Team

Des ign Team Contract

Schematic Des ign

City Counci l review/approvalPresentation to Counci l

Des ign Deveopment

Counci l review/approval

Construction Bid Documents - Completed Oct. 31, 2015

Counci l Approval

Bidding - 30 days

Bid Award

Construction Contract

ConstructionDec. 15 - May 15, 2016

Prepare Separate Documents Punch Lis t / Close-outfor pool demol i tion

OPEN MAY 30, 2016POOL City Counci l Approval MEMORIAL DAYDEMOLITIONOPTIONAL BiddingSCHEDULE

Bid Award

Demol i tion Contract

Demol i tion of poolprior to new construction

JUL AUG SEPT OCT MAY JUN JUL AUG SEPT2015 2016

NOV DEC JAN FEB MAR APRMAY JUN

o Local Firm with Resources and Staff o A Team with experience in components of

this project o Positive and practical approach to o Design o Budget o Construction Administration