Home / Homepage · 2017. 9. 21. · SAS Survey- All Staff TFI Survey- PBIS Team School Climate- All...

Preview:

Citation preview

••

––––

•–––––

•••

••

•••••

•–

•–

•–

Students receiving 0-1 Referral Historical Data

MMS

● 2013-2014 = 85.7%● 2014-2015 = 88.6%● 2015-2016 = 88.2%● 2016-2017 = 90.6%

PBIS= 80% signals effective PBIS Program

•–

••••

••••••

––

••••

•••••

– …

Millburn Elementary School Improvement Plan 2017-2018

1.2.3.4.

Outstanding Core Academics

Standards-Based Reporting, Curriculum Updates

1.2.3.4.5.6.7.8.

Curriculum Update- Writing● Assess student writing before each unit of

instruction○ Review data to identify strengths and

weakness within student samples○ Plan instruction accordingly

● Assess after unit of instruction to show growth and identify at risk students

○ Growth in areas of the Rubric○ Gap analysis to improve instruction

Curriculum Update- Science

•–

•–

● Piloting Mystery Science 2017-2018 all classrooms○ Will use our evaluation tool to determine if it meets our needs

Curriculum Update - Social StudiesPiloting Studies Weekly in 6 classrooms (K-5)

Will use our evaluation tool to determine if it meets our needs

Curriculum Update- Reading ● Current reading series is out of date.

○ Adopted in 2008○ Company has even discontinued their online resources

● Committee Work○ Determine our needs (has begun)○ Explore programs○ Pilot

Positive School Culture and Climate

PBIS Fidelity, Action Plan

Bully PreventionPrograms in Place

● Second Step Program (Bully Unit first weeks of school)○ Common Language○ Common Strategies

● Educating Parents, Students, and Staff on what bullying is

New Features

● Accessible Bully Report● Revised Data collection (referral form)

Students receiving 0-1 Referral (Minor/Major)Historical Data

MES

● 2013-2014 = 83.6%● 2014-2015 = 85.4%● 2015-2016 = 86%● 2016-2017 = 84.5%

PBIS= 80% signals effective PBIS Program

Science and TechnologyScience Curriculum, 1:1 iPads

ScienceMystery Science Pilot

● Tracking the use of consumables during pilot ● Evaluation of the program

1:1 iPads1. Lessons on iPAD use2. Integration of Schoology/Seesaw3. Take-Home Rights for 3rd-5th

a. Purposefulb. Engaging

4. Implementation of the SAMR Model 5. Tech Talk

a. Monthlyb. Discussion on tech initiativesc. Feedback

High Quality Teachers and Staff

Professional Development

PD Aligned to Improvement Areas

● Schoology (Science and Technology, Outstanding Core Academics)

● Aleks- (Outstanding Core Academics)● Norming for Writing- (Outstanding Core Academics)● STAR- (Outstanding Core Academics)● Erin’s Law (Positive School Culture and Community)● PBIS- (Positive School Culture and Community)● Power Standards- (Outstanding Core Academics)

* In addition to individualized PD using annual $500 of PD money/teacher

Data Review

PARCC AlignmentAlignment of standards in curriculum planning and development

Adopting new programs aligned to standards

● Current Math Series● ALEKs● STAR Assessment

PARCC addresses Major Standards set by the state (Example). Students are rated on a five point scale on PARCC.

MAP Alignment- Reading

Starts Between the 67-71%iles

MAP Alignment -Math

Starts Between the 62-75%iles

STAR Alignment

Starts Between the 45-70%iles

Starts Between the 70-80%iles

Testing Correlation District-Wide

Year

Reading Math

MAP67%ile+

STAR(Based on State

Performance Report)

PARCC MAP67%ile+

STAR(Based on State

Performance Report)

PARCC

2015 63% 53% 49% 50%

2016 62% 52% 58% 56%

2017 61.7% 59.5% 52% 57% 51.7% 51%

Increase PARCC Proficiency by 5%1. Align Curriculum to Major Standards2. Continuously assess using those major standards

a. Classroom Assessmentsb. Teacher Goal Settingc. MAP/STAR- Looking at students scoring above the 67%