LEAC and Oil Prices Update
Guam Power AuthorityConsolidated Commission on Utilities
April 7, 2009
2
We all have endured the worst energy crisis since the 70s• 448 % Fuel Price Increase from Aug 2002 to July 2008
• Fuel Price decrease starting October 2008
$ 26 / bbl in Aug 2002
$ 145 / bbl in July 2008
$ 114.08 / bbl in Aug 2008
$ 104.82 / bbl in Sept 2008
$ 60 / bbl in Oct 2008
$ 38 / bbl in Jan 2009
$ 48 / bbl in March 2009
Historical Fuel Prices
3
Fuel Prices
72.29
$20
$40
$60
$80
$100
$120
$140
$160
$180
$200
$220
Aug-07 Oct-07 Dec-07 Feb-08 Apr-08 Jun-08 Aug-08 Oct-08 Dec-08 Feb-09 Apr-09 Jun-09 Aug-09 Oct-09 Dec-09 Feb-10
$ p
er B
arre
l
Guam Gasoline Prices GPA Price - Platt's GPA Price - ProjectedNYMEX NYMEX - Projected
GPA Price - Projected
GPA Price (Platt's)
Guam Gas Prices (PDN, MV, etc.)
NYMEX - Projected
NYMEXGPA
Prices (Platt's)
Guam Gas Prices
Aug-07 72.29$ 57.32$ Sep-07 78.81$ 60.06$ Oct-07 78.29$ 67.49$ Nov-07 94.95$ 76.40$ Dec-07 91.23$ 72.39$ Jan-08 92.73$ 72.05$ 159.26$ Feb-08 95.63$ 72.00$ 160.74$ Mar-08 104.46$ 76.29$ 166.25$ Apr-08 111.99$ 82.73$ 171.78$ May-08 125.76$ 92.92$ 175.02$ Jun-08 133.41$ 97.99$ 193.87$ Jul-08 134.69$ 111.21$ 203.85$ Aug-08 122.95$ 102.13$ 189.46$ Sep-08 104.84$ 89.48$ 178.64$ Oct-08 77.47$ 60.75$ 170.15$ Nov-08 57.96$ 36.91$ 147.00$ Dec-08 43.71$ 34.62$ 119.65$ Jan-09 41.15$ 38.86$ 112.98$ Feb-09 39.12$ 39.03$ 114.66$ Mar-09 48.09$ 119.28$
4
Fuel Expenses
$20
$40
$60
$80
$100
$120
$140
$160
$180
$200
$220
Aug-07 Oct-07 Dec-07 Feb-08 Apr-08 Jun-08 Aug-08 Oct-08 Dec-08 Feb-09 Apr-09 Jun-09 Aug-09 Oct-09 Dec-09 Feb-10
$ p
er B
arre
l
GPA Prices (Platt's)GPA Price - Projected Actual Fuel Expenses (inc. handling costs)Actual Fuel Expenses (w/o handling costs)
GPA Price - Projected
GPA Price (Platt's)
Actual Fuel Expenses Including Handling Costs
Actual Fuel Expenses without Handling Costs
Fuel Prices – RFO in $/bbl
HEDGE GAINS minimized Fuel Expenses
5
Fuel Prices – RFO in $/kwh
Fuel Costs per KWH Sales
$0.05
$0.08
$0.10
$0.13
$0.15
$0.18
$0.20
$0.23
$0.25
Aug-07 Oct-07 Dec-07 Feb-08 Apr-08 Jun-08 Aug-08 Oct-08 Dec-08 Feb-09
$ p
erK
WH
Actual Cost without Handling Costs
Actual Cost including Handling
HEDGE GAINS minimized Actual Costs
6
• GPA has spent $ 970 M for Fuel (Cumulative) since FY 2003
• GPA Fuel Expenses in FY 2008 more than tripled compared to FY 2003, even though Guam’s energy demand remained flat
FY 2003: Fuel Expenses = $72.7 M
FY 2008: Fuel Expenses = $237 M
• As of Feb 2009, FY 2009 Fuel Expenses = $144 M
• The biggest factor in the increase in Power Bills is the RISING COST OF OIL
Historical Fuel Expenses
7
Fuel Expenses – Costs and BBL Consumption
Fuel Expenses inclusive of all costs (Fuel Handling, Hedge Gains/Loss, etc.)
FUEL EXPENSES
2,8092,716 2,747
1,131
$72,709$95,267 $112,709
$157,122
$237,063
$144,640$174,748
$167,976
$280,685
$437,806
$612,554
$994,256
$849,617
0
500
1000
1500
2000
2500
3000
FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY09 thru FEB09
Fuel
Con
sum
ptio
n (1
,000
BB
LS)
$-
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
Fuel
Exp
ense
s ($
)
8
Fuel Expenses – Costs and KWH Sales
Fuel Expenses inclusive of all costs (Fuel Handling, Hedge Gains/Loss, etc.)
FUEL EXPENSES and MWH SALES
1,325,133 1,304,345 1,295,025
517,834
$72,709$95,267 $112,709
$157,122
$237,063
$144,640$174,748
$167,976
$280,685
$437,806
$612,554
$994,256
$849,617
-
300,000
600,000
900,000
1,200,000
1,500,000
FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY09 thru FEB09
MW
H S
ales
$-
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
Fuel
Exp
ense
s ($
)
9
Fuel Cost -RFO54%
Beg. over/under Recovery
4%
Inventory Cost Change
5%
Other Handling Costs
2%
Hedging Costs33%
Fuel Cost -Diesel2%
LEAC Cost Components For period: February 2009 – July 2009
$ 108,017,235.12 Total
$ 4,332,637.00
Beg. over/under Recovery
$ 5,551,652.43 Inventory Cost Change
$ 2,025,857.30
Other Handling Costs
$ 35,495,082.30 Hedging Costs
$ 2,222,227.35 Fuel Cost -Diesel
$ 58,389,778.75 Fuel Cost -RFO
Feb09 thru Jul09
BREAKDOWN OF COSTS:
Under-recovery is $ 4.3 Million for this period, adding to the Fuel Costs.
10
Fuel Cost -Diesel1%
Fuel Cost -RFO71%
Beg. over/under Recovery
14%
Other Handling Costs
2%
Hedging Costs7%
Inventory Cost Change
5%
LEAC Cost ComponentsFor period August 2009 – January 2010
$ 81,154,459.85 Total
$ 11,478,775.00
Beg. over/under Recovery
$ 3,876,286.26
Inventory Cost Change
$ 2,007,537.57
Other Handling Costs
$ 5,730,109.90 Hedging Costs
$ 1,076,782.63 Fuel Cost -Diesel
$ 56,984,968.50 Fuel Cost -RFO
Aug09 thru Jan10
BREAKDOWN OF COSTS:
Under-recovery is $ 11.5 Million for this period, adding to the Fuel Costs.
11
Hedging
• Hedging is for insurance on fuel price increases not an attempt to game the market
• Hedging provides rate stability+ : When prices are above the price ceiling, GPA customers do not see
that portion of the price increase
- : When fuel price falls below the price floor, GPA customers do not see a portion of price decreases
12
LEAC RatesCurrent Rate = $0.15763
LEAC Rate Effective May 2009
$-
$20.00
$40.00
$60.00
$80.00
$100.00
$120.00
15% D
ecrea
se
10% D
ecrea
se
5% D
ecreas
e
Curren
t
10% In
crease
20% In
crease
30% In
crease
Fuel Price Scenarios
Fuel
Cos
t ($/
bbl)
$-
$0.02
$0.04
$0.06
$0.08
$0.10
$0.12
$0.14
$0.16
$0.18
LEA
C R
ate
(Cen
ts/K
WH
)
Fuel cost/bbl LEAC Rate Effective May2009 Current
13
LEAC RatesCurrent Rate = $0.15763
LEAC Rate Effective August 2009
$-
$20.00
$40.00
$60.00
$80.00
$100.00
$120.00
15% Dec
rease
10% Dec
rease
5% Decr
ease
Curren
t
10% In
crease
20% In
crease
30% In
crease
Fuel Price Scenarios
Fuel
Cos
t ($/
bbl)
$-
$0.02
$0.04
$0.06
$0.08
$0.10
$0.12
$0.14
$0.16
$0.18
LEAC
Rat
e (C
ents
/KW
H)
Fuel cost/bbl LEAC Rate Effective Aug2009 Current
14
• Increased Baseload Efficiencies from 83% to 98% (Jan 2009)
About $134 M in Fuel Purchase Savings
• Reduced Unaccounted for Energy, or “Line Losses” by 30% (from 10 to 7%)
• Collected $ 34.2 M of the $ 50.8 M previously owed by GovGuam for unpaid power bills to pay for fuel and other expenses that would have otherwise required higher rate increases
• Absorbed over $15 million in Unrecovered Fuel Expenses on behalf of ratepayers. GPA will never ask for this cost back from ratepayers.
GPA can only focus on processes and costs it can control. GPA cannot control oil prices.
How has GPA Reduced Rates to Ratepayers?
15
Fuel Savings from Increased Baseload Use
Fuel Savings Relative to 83% Baseload Use
83%
93% 93%
98%97% 97%
98%
95%
$18
$34$32$23
$18$10
$87
$55
$32
$14$4
$121
$139
80%
84%
88%
92%
96%
100%
5-Yea
rs Pre-
CCUFY'03
(Apr'0
3-Sep
'03)
FY'04
FY'05
FY'06
FY'07
FY'08
F'09 as
of Jan
09
Act
ual B
asel
oad
Prod
uctio
n
$0
$25
$50
$75
$100
$125
$150
Fuel
Sav
ings
($M
)
Actual Baseload Production (%) Fuel Savings ($M) Cumulative Fuel Savings ($M)
16
Line Loss ReductionsSummary of Unaccounted For Energy Reductions
$172,164,929
$146,396,990
$136,475,126$131,641,552
$45,263,815
$124,546,811
9.78%
8.17%7.56% 7.45%
7.06%7.66%
0
20,000,000
40,000,000
60,000,000
80,000,000
100,000,000
120,000,000
140,000,000
160,000,000
180,000,000
200,000,000
FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY09 Thru JAN09
KW
H
0%
2%
4%
6%
8%
10%
12%
Line
Los
s R
atio
(Net
)
Actual Line Loss (KWH) Actual Line Loss (%)
17
Hedging Gains from FY2002 to Jan 2009
($18,000,000)
($12,000,000)
($6,000,000)
$0
$6,000,000
$12,000,000
$18,000,000
$24,000,000
Oct-01
Feb-02
Jun-02
Oct-02
Feb-03
Jun-03
Oct-03
Feb-04
Jun-04
Oct-04
Feb-05
Jun-05
Oct-05
Feb-06
Jun-06
Oct-06
Feb-07
Jun-07
Oct-07
Feb-08
Jun-08
Oct-08
Feb-09
Hedging Gain (Loss)Cumulative Gain (Loss)
Historical Hedging Costs (Base: Oct 2001)
Apr05-May06:
No Hedging Contract
Oct 07- Dec07: No Hedging Contract
Jan08-Mar08: No Gains/Losses
Oct09-eb09: Hedging Losses
18
Historical Hedging Costs (FY 2008- FY 2009)
($16,504,169.32)($18,000,000)
($12,000,000)
($6,000,000)
$0
$6,000,000
$12,000,000
$18,000,000
$24,000,000
Oct-07 Nov-07 Dec-07
Jan-08 Feb-08 Mar-08 Apr-08 May-08
Jun-08 Jul-08 Aug-08
Sep-08
Oct-08 Nov-08 Dec-08
Jan-09 Feb-09
Hedging Gain (Loss)Cumulative Gain (Loss)
FY 2008 Net Gain = $ 6,776,766,70FY 2009 Net Losses = $ 36,599,488.57Cumulative Losses = $ 16,504,169.32
19
Unrecovered Fuel Expenses – Inventory Carrying Costs
$(2,575,309)
$10,018,405
$(19,608,237)$(3,266,632)$(4,655,545)$(5,138,508)$531,973
($34,712,258.02)
($24,693,853.02)
($15,104,021.49)
($11,837,389.31)
($7,181,844.64)
($2,043,336.26)($2,575,308.92)
$(36,000,000)
$(32,000,000)
$(28,000,000)
$(24,000,000)
$(20,000,000)
$(16,000,000)
$(12,000,000)
$(8,000,000)
$(4,000,000)
$-
$4,000,000
$8,000,000
$12,000,000
FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009
from Dec 08 Filing as of Jan 09
Fuel Inventory Carrying Cost Cum. Carrying Costs
20
Past Due GovGuam Balances
$16,598,134
$50,825,698
$-
$10,000,000
$20,000,000
$30,000,000
$40,000,000
$50,000,000
$60,000,000
2002 2003 2004 2005 2006 2007 2008
Historical GovGuam Balances
GPA has collected $34.2 M from Past Due GovGuam Balances, which was used to defer rate increases and absorb part of the unrecovered fuel expenses
21
* GPA’s Absorbed Fuel Expenses up to FY07 only - FY08 Absorbed Fuel Expenses included in LEAC Recovery
**Fuel Savings from Diesel Use Reductions and Line Loss Reductions up to January 2009
GPA’s Total Savings per KWH of Sales:
a b c d e f = a+b+c+d g h = f / g
Hedging Gain/Loss
GPA's Absorbed Fuel
ExpensesDiesel Use Reductions
Line Loss Reductions
Collections from GovGuam
Total Savings Amount KWH Sales
Savings per KWH Sales
FY 2003 5,567,435$ 2,575,309$ 3,628,390$ -$ 4,424,875$ 16,196,009$ 1,455,114,763 0.011$ FY 2004 8,926,064$ (531,973)$ 10,271,696$ -$ (1,087,797)$ 17,577,991$ 1,588,850,672 0.011$ FY 2005 5,653,595$ 5,138,508$ 17,684,024$ $1,568,598 1,881,811$ 31,926,535$ 1,644,540,440 0.019$ FY 2006 (3,844,730)$ 4,655,545$ 23,156,345$ $879,070 4,544,365$ 29,390,595$ 1,669,000,669 0.018$ FY 2007 (2,983,811)$ 3,266,632$ 32,119,718$ $350,004 (281,812)$ 32,470,731$ 1,635,731,895 0.020$ FY 2008 6,776,767$ 22,732,356$ $1,026,554 24,746,122$ 55,281,799$ 1,636,790,942 0.034$ FY 2009 (27,815,065)$ 18,024,606$ $78,866 (9,711,593)$ 544,625,508 (0.018)$
Total (7,719,746)$ 15,104,021$ 127,617,135$ 3,903,092$ 34,227,564$ 173,132,067$ 10,174,654,889 0.017$
Period
22
LEAC Facts:
• LEAC has been used for ten years to ensure that GPA recovers from ratepayers what they consume in energy.
• LEAC is adjusted twice a year to provide rate stability for 6 months at a time. Only once in ten years---this past June when oil prices soared to record levels---has LEAC been adjusted more than twice per year
Gasoline prices this year alone have increased 10 times and decreased 7 times. Gas prices remain higher than a year ago.
Would you want your power bill to act like that? Or would you want your bill to average-out the peaks and valleys to keep bills more stable?
If we change to “Monthly True-up” as some have suggested, GPA could never advance oil costs for ratepayers. Ratepayers would have to pay any “under-recovery” in the next month instead of averaging it out over 6 months or more.
23
LEAC is calculated by doing TWO things simultaneously:1) GPA and the independent PUC:
Compare what ratepayers consumed & were charged for oil vs.what GPA actually paid for in oil to provide the energy actually
consumed during the last 6 months LEAC Period
2) GPA, Morgan Stanley and the PUC: • Project Fuel Costs for the next 6 months• Project how much energy will be used & how much it will cost to produce this
amount of energy• Uses these projections to calculate the rate (LEAC rate) necessary to ensure
GPA has collected enough from customer fuel rates to buy projected fuel needed and generate projected energy demand
Accomplishing these two steps require looking back and forward to make sure GPA always has the money needed to order enough oil to meet customer demand.
LEAC Facts:
24
LEAC always benefits ratepayers, especially during periods of rising prices• Averages out impact of rising fuel prices by spreading the impact over 6 months, or even longer
LEAC protected ratepayers from soaring oil prices during the last 12 months• Delayed rate increases (LEAC is fixed over a period) • Spreading out payback
Without LEAC, ratepayers would see power bills go up & down like gas prices• Price increases to ratepayers would be immediate, instead of spread out• Any under-recovery would need to be recovered in one month; the $15.7M would have to be recovered in a month
Dropping oil prices will help GPA recover balances faster, allowing GPA to reduce its LEAC rate sooner.
LEAC Facts:
25
LEAC Facts:
• 33 States use processes similar to LEAC, or ECAC*
• Reasons for no ECAC/LEAC Process:Deregulated Market – typically deregulated utilities distribute, but do not generate electricity; therefore, they just pass on their cost of power to customers
*Source: National Economic Research Associates (NERA)
26
Fuel Price Flowchart(Market Price to Customer Bill)
Market
Fuel Prices
Contract Purchase
Price
Hedges
Fuel Inventory Price
LEAC Rate
BASE Rate
Customer Bill
Beg. Over/under Recoveries
Projected Sales
Unit Dispatching
Inventory Valuation
Fuel Handling
Costs
27
Billing Illustration: Residential Customer
Decrease in LEAC Rate = Decrease from previous period’s rate
Total Decrease = cumulative decrease from DEC 2008
RATE SCHEDULE R Effective 12/1/08 Effective 2/1/09 Effective 3/1/09
KWH 1,000 1,000 1,000
Monthly Charge 5.21 5.21$ 5.21 5.21 5.53 5.53Non-Fuel Energy Charge
First 500 KWH 0.03354 16.77$ 0.03354 16.77 0.03354 16.77Over 500 KWH 0.0795 39.75$ 0.0795 39.75 0.08439 42.19
Emergency Water-well charge 0.00242 1.21$ 0.00242 1.21 0.00257 1.28Insurance Charge 0.00290 2.90$ 0.00290 2.90 0.00290 2.90Total Electric Charge before Fuel Recovery Charges 65.84$ 65.84 68.68Fuel Recovery Charge 0.17105 171.05$ 0.15763 157.63 0.15763 157.63
Total Electric Charge 236.89$ $223.47 $226.31Increase in Total Bill ($16.70) ($13.42) $2.84% Increase -6.59% -5.67% 1.27%Cents/kWh 0.237$ 0.223$ 0.226$
28
Billing Illustration: Residential Customer
Decrease in LEAC Rate = Decrease from previous period’s rate
Total Decrease = cumulative decrease from DEC 2008
Effective 5/1/09 Effective 8/1/09 Effective 2/1/10
KWH 1,000 1,000 1,000
Monthly Charge 5.53 5.53 5.53 5.53 5.53 5.53Non-Fuel Energy Charge
First 500 KWH 0.03354 16.77 0.03354 16.77 0.03354 16.77Over 500 KWH 0.08439 42.19 0.08439 42.19 0.08439 42.19
Emergency Water-well charge 0.00257 1.28 0.00257 1.28 0.00257 1.28Insurance Charge 0.00290 2.90 0.00290 2.90 0.00290 2.90Total Electric Charge before Fuel Recovery Charges 68.68 68.68 68.68Fuel Recovery Charge 0.13645 136.45 0.11527 115.27 0.0941 94.10
Total Electric Charge $205.13 $183.95 $162.78Increase in Total Bill ($21.18) ($21.18) ($21.17)% Increase -9.36% -10.33% -11.51%Cents/kWh 0.205$ 0.184$ 0.163$
29
Billing Illustration: Large Customer
Effective 12/1/08 Effective 2/1/09 Effective 3/1/09THREE PHASEKWH 1,000,000 1,000,000 1,000,000 MINIMUM 200 400,000 400,000 400,000
Monthly Charge 19.43 19.43 19.43 19.43 20.62 20.62Demand Energy charge First 200 KWH per KW Billing Demand 0.15847 633.88 0.15847 633.88 0.16821 672.84 0.10967 43,429.32 0.10967 43,429.32 0.11641 46,098.31 Next 200 KWH per KW Billing Demand 0.06750 27,000.00 0.06750 27,000.00 0.07165 28,659.31 Over 400 KWH per KW Billing Demand 0.04420 8,840.00 0.04420 8,840.00 0.04692 9,383.27Emergency Water-well charge 0.00242 2,420.00 0.00242 2,420.00 0.00257 2,568.72Insurance Charge 0.00290 2,900.00 0.00290 2,900.00 0.00290 2,900.00
Total Electric Charge before Fuel Recovery Charges 85,242.63 85,242.63 90,303.08Fuel Recovery Charge 0.171050 171,050.00 0.157630 157,630.00 0.157630 157,630.00
Total Electric Charge $256,292.63 $242,872.63 $247,933.08
Increase(Decrease) in Total Bill ($16,700.00) ($13,420.00) $5,060.45% Increase (Decrease) -6.1% -5.2% 2.08%Cents/kWh 0.256$ 0.243$ 0.248$
Increase(Decrease) in LEAC Rate -8.9% -7.8% 0.0%
Total Decrease in LEAC Rate -16.7%
Decrease in LEAC Rate = Decrease from previous period’s rate
Total Decrease = cumulative decrease from DEC 2008
30
Billing Illustration: Large Customer
Effective 5/1/09 Effective 8/1/09 Effective 2/1/10THREE PHASEKWH 1,000,000 1,000,000 1,000,000 MINIMUM 200 400,000 400,000 400,000
Monthly Charge 20.62 20.62 20.62 20.62 20.62 20.62Demand Energy charge First 200 KWH per KW Billing Demand 0.16821 672.84 0.16821 672.84 0.16821 672.84 0.11641 46,098.31 0.11641 46,098.31 0.11641 46,098.31 Next 200 KWH per KW Billing Demand 0.07165 28,659.31 0.07165 28,659.31 0.07165 28,659.31 Over 400 KWH per KW Billing Demand 0.04692 9,383.27 0.04692 9,383.27 0.04692 9,383.27Emergency Water-well charge 0.00257 2,568.72 0.00257 2,568.72 0.00257 2,568.72Insurance Charge 0.00290 2,900.00 0.00290 2,900.00 0.00290 2,900.00
Total Electric Charge before Fuel Recovery Charges 90,303.08 90,303.08 90,303.08Fuel Recovery Charge 0.136450 136,450.00 0.115270 115,270.00 0.094100 94,100.00
Total Electric Charge $226,753.08 $205,573.08 $184,403.08
Increase(Decrease) in Total Bill ($21,180.00) ($21,180.00) ($21,170.00)% Increase (Decrease) -8.54% -9.34% -10.30%Cents/kWh 0.227$ 0.206$ 0.184$
Increase(Decrease) in LEAC Rate -13.4% -15.5% -18.4%
Total Decrease in LEAC Rate -30.2% -45.7% -64.1%
Proposed LEAC Rates
Decrease in LEAC Rate = Decrease from previous period’s rate
Total Decrease = cumulative decrease from DEC 2008
31
Rate Comparison
GPA has one of the lowest rates in the Region ( 22.63 cents/kwh )RATE COMPARISON
22.989 23.34
19.09
22.82
29.329.92
22.63
29.67
-
5
10
15
20
25
30
35
Guam (GPA) Saipan (CUC) Kauai (KIUC) Oahu (HECO) Haw aii (HELCO)
Maui (MECO) Molokai (MECO) Lanai (MECO)
Sources: http://www.heco.com/vcmcontent/StaticFiles/FileScan/PDF/EnergyServices/Tarrifs/HECO/EFFRATESAPR09.pdfhttp://www.kiuc.coop/pdf/ratedata_2009.pdfhttp://www.saipantribune.com/newsstory.aspx?cat=1&newsID=88918
32
GPA created an Integrated Resource Plan (IRP) which addresses Fuel Diversification and Renewable Energy Requirements (PL 29-62) by Recommending:
• Acquisition of renewable resources to offset the high price of fuel, and
• Conversion of existing plants to use Liquefied Natural Gas as an additional measure to lower impact of petroleum volatility and lower fuel expenses.
GPA intends to initiate acquisition for renewable resources in the next couple of months (Wind, Solar, Hydro, Biomass, Geothermal, OTEC,Wave).
Over the next few years, GPA will implement these alternatives and change the way power is produced – to get rates lower and keep them there
Moving Forward
33
Phase I – Renewable AcquisitionProcurement Document Development:
Multi-Step Bid for Purchase Power of Renewable Energy
Technical Criteria:Renewable Energy Technologies as defined by NREL (National Renewable Energy Laboratory)Projects > 5MW and up to 40 MW (for Phase I)Commissioning Period within 36 MonthsCommercially viable with min. 1 year of performance data
PUC reviewing documents (Procurement Protocol)
Renewable Energy Contract to be awarded in 2009
34
Phase II Renewable
Pending Wind Study progress & completion of Phase I
In OCT 2008, GPA completed a site assessment for sitingof wind monitoring towersProcurement for Wind Towers and Data Collection/Analysis is dependent on land acquisition – still in progress
GPA intends to issue Phase II Renewable bid late 2009
35
Engineering Division
Construction Projects for FY 2008
Major Activities for FY 2009
36
CONSTRUCTION FY 2008
Harmon to Tumon 34.5 kV UG -COMPLETED Tamuning to Tumon 34.5 kV UG -
COMPLETED
Harmon to Tanguisson – 34.5 KV UG - CONSTRUCTION
San Vitores to Macheche 34.5 kV UG -CONSTRUCTION
37
CONSTRUCTION FY 2008
Macheche – GAA 34.5 kV UG -CONSTRUCTION
Harmon to GIAT Reconductoring -COMPLETED
Fire Protection Upgrade at Dededo CT - CONSTRUCTION
38
FY 2009 MAJOR ACTIVITIES
39
Substation/Transmission Engineering
HARMON – TANGUISSION 34.5 KV UNDERGROUND LINESLine #1 (X93/X103) Energized January 29, 2009Line #2 (X86/X101) Energized on February 12, 2009Pending: Fiber installation, removal of conductors & poles
MACHECHE TO SAN VITORES 34.5 KV UNDERGROUND LINE55% Complete – Construction
MACHECHE TO GAA 34.5 KV UNDERGROUND LINE56% Complete - Construction
AGANA 115/34.5 KV BREAKER REFURBISHMENTOrdering BreakersEstablishing Interconnection Drawings
SYSTEM PROTECTION UPGRADE - OngoingMARBO – PAGAT TRANSMISSION LINE - DesignROUTE 2A TRANSMISSION LINE - DesignOROTE/COLD STORAGE/SRF UPGRADE - Design
40
Northern Underground Projects Linking The Macheche CT And Tanguisson Power Plants
41
P-27P-330 Reconductoring & UpgradeP-321 New FeederDistribution System Medium Range Planning & Performance AnalysisLarge Customers – In Progress
Talo Verde EstatesParadise Estates Phase IIParadise Estates Phase IIIIronwood Glenn Pago BayOutrigger ExpansionAdacao Elementary
Distribution Engineering
42
Fuel Oil Pipeline Underground Conversion (From Barrigada Post Office to Airport Access Road)
DesignGPA Upgrade Fire Protection & Smoke Alarm at the Dededo CT Power Plant
Construction in Progress – 60% CompletedGPA Upgrade Fire Protection & Smoke Alarm at the Macheche CT Power Plant - BidMET Tower Structural Repair - Bid8-Inch USN Pipeline Cathodic Protection - Bid
Project Management Engineering
43
Other Major Ongoing Projects
GIS Implementation PlanNet Metering Program ImplementationPre Paid Metering Program ImplementationAutomated Generation Control Implementation - RFP
44
Questions and Comments
The presentation can be accessed and downloaded from the GPA website: www.guampowerauthority.com