View
3.939
Download
1
Category
Tags:
Preview:
Citation preview
Metals & Mining Corporate Access Day – March 17, 2015
TSX; NYSE: AUQ
www.auricogold.com
Built for SUCCESS
All amounts are in US dollars unless otherwise indicated
Forward Looking Statements
Cautionary Statement
This presentation contains certain information that constitutes “forward-looking information” and “forward-looking statements” as defined under Canadian and U.S. securities
laws. All statements in this press release, other than statements of historical fact, are forward-looking statements. The words “expect”, “believe”, “anticipate”, “contemplate”,
“may”, “could”, “will”, “intend”, “estimate”, “forecast”, “target”, “budget”, “schedule” and similar expressions identify forward-looking statements. Forward-looking statements
in this presentation include, without limitation, statements with respect to our expectations on underground productivity levels, underground unit mining cost, underground
development, mill facility processing rate, cash flow, free cash flow, cash costs, capital investment and timing to completion on the final leg of the Northgate production shaft,
information as to our strategy, plans and future financial and operating performance, such as our expansion plans, project timelines, production plans, projected cash flows or
capital expenditure levels, cost estimates, mining or milling methods, projected exploration results, resource and reserve estimates, other statements that express our
expectations or estimates of future performance, the success of exploration activities, the Company’s ability to delineate additional resources and reserves as a result of such
programs, statements regarding the advancement of the Lynn Lake district, the completion of a feasibility study on the Lynn Lake Project within the indicated timeframe, mineral
reserves and mineral resources and anticipated grades, exploration expenditures, costs and timing of any future development, costs and timing of future exploration and the
Company’s intentions regarding its investment in Carlisle, the presence of and continuity of metals at Kemess East at modeled grades.
Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered reasonable by management at the time of making such
statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to
differ materially from those projected in the forward-looking statements. Such factors and assumptions underlying the forward-looking statements in this press release include,
but are not limited to: changes to current estimates of mineral reserves and resources; fluctuations in the price of gold; changes in foreign exchange rates (particularly the
Canadian dollar, Mexican peso and U.S. dollar); the impact of inflation; changes in our credit rating; any decision to declare a quarterly dividend; employee relations; litigation;
disruptions affecting operations; availability of and increased costs associated with mining inputs and labor; development delays at the Young-Davidson mine; operating or
technical difficulties in connection with mining or development activities; inherent risks associated with mining and mineral processing; the risk that the Young-Davidson and El
Chanate mines may not perform as planned; uncertainty with the Company’s ability to secure capital to execute its business plans; the speculative nature of mineral exploration
and development, including the risks of obtaining necessary licenses, permits, authorizations and/or approvals from the appropriate regulatory authorities for the Kemess
Underground and Lynn Lake projects; contests over title to properties; changes in national and local government legislation in Canada, Mexico and other jurisdictions in which
the Company does or may carry on business in the future; risk of loss due to sabotage and civil disturbances; the impact of global liquidity and credit availability and the values
of assets and liabilities based on projected future cash flows; risks arising from holding derivative instruments; business opportunities that may be pursued by the Company, as
well as those factors discussed under “Risk Factors” in the Company’s most recent Annual Information Form.
Actual results and developments are likely to differ, and may differ materially, from those expressed or implied by the forward-looking statements contained in this presentation.
Such statements are based on a number of assumptions which may prove to be incorrect, including, but not limited to, the assumptions set forth in our most recent Form 40-
F/Annual Information Form. Readers are cautioned that forward-looking statements are not guarantees of future performance. All of the forward-looking statements made in this
press release are qualified by these cautionary statements. Specific reference is made to the most recent Form 40-F/Annual Information Form on file with the SEC and Canadian
provincial securities regulatory authorities for a discussion of some of the factors underlying forward-looking statements.
There can be no assurance that forward-looking statements or information will prove to be accurate, accordingly, investors should not place undue reliance on the forward-
looking statements or information contained herein. The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of
new information, future events or otherwise, except as required by applicable law.
Cautionary Note to U.S. Investors Concerning Measured, Indicated and Inferred Resources
This presentation uses the terms "measured", "indicated" and "inferred” resources. We advise investors that while those terms are recognized and required by Canadian
regulations, the United States Securities and Exchange Commission does not recognize them. “Inferred resources” have a great amount of uncertainty as to their existence and
as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred resource will ever be upgraded to a higher category. Under Canadian rules,
estimates of inferred mineral resources may not form the basis of feasibility or other economic studies. United States investors are cautioned not to assume that all or any part
of measured or indicated mineral resources will ever be converted into mineral reserves. United States investors are also cautioned not to assume that all or any part of an
inferred mineral resource exists, or is economically or legally mineable.
2
Built for Success
Exclusive North American portfolio
Low cost, long life assets
Significant production growth
Growing free cash flow profile
Strong development project pipeline
Strong liquidity profile
Significant Canadian tax loss pools
Favourable Canadian dollar exposure
Quarterly dividend distributions
-
50,000
100,000
150,000
200,000
250,000
300,000
350,000
FY 12 FY 13 FY 14 FY 15E FY 16E FY 17E
Gold
Ounces (
5)
AuRico Gold: Built For Success
3
Significant Production Growth*
Growing Free Cash Flow*
(0.60)
(0.50)
(0.40)
(0.30)
(0.20)
(0.10)
0.00
0.10
0.20
0.30
0.40
FY 14 FY 15E FY 16E FY 17E FY 18E
Fre
e C
ash F
low
per
Share
* Source: FactSet consensus data. (5) Refer to endnote #5
AuRico Gold Overview
Cash
$90M Undrawn
debt facility
$150M
4
Unrestricted Cash, March 31
$165
Undrawn Revolving
Credit Facility $150
(as of Dec. 31, 2014) Capital Structure
Issued and Outstanding Shares 249.6M
Options 13.8M
Share Units 1.5M
Fully Diluted 265.0M
(as of December 31, 2014)
Broker Analyst
1 Credit Suisse Anita Soni
2 RBC Capital Markets Dan Rollins
3 Morgan Stanley Brad Humphrey
4 National Bank Financial Adam Melnyk
5 BMO Capital Markets Brian Quast
6 CIBC World Markets Cosmos Chiu
7 Pareto Securities John McClintock
8 Desjardins Securities Mike Parkin
9 Raymond James Phil Russo
10 TD Securities Steve Green
11 Mackie Research Barry Allan
12 GMP Securities Ian Parkinson
13 Dundee Capital Markets Joe Fazzini
14 Canaccord Genuity Rahul Paul
15 Macquarie Research Mike Siperco
16 Scotiabank GBM Trevor Turnbull
$240M in Liquidity
Analyst Coverage
Corporate Information (AUQ:TSX,NYSE)
2015 2016 2017 2018 2019 2020
No Significant Debt Maturities until 2020
$315M
High Yield
Bond
C$20M Payment and Restructured Royalty (Jan.
C$20M Upfront Payment and Restructured
Royalty Agreement (Jan. 2015)
C$20M Payment and Restructured Royalty Agreement (Jan. 2015)
Balanced North American Portfolio
5
YOUNG-DAVIDSON
Location: Ontario, Canada
Underground Mine
EL CHANATE
Location: Sonora State, Mexico
Open Pit Mine
KEMESS UNDERGROUND
Location: B.C., Canada
Advanced Development Project
LYNN LAKE GOLD CAMP
Location: Manitoba, Canada
Open Pit Development Project
Advanced high-grade open pit gold mine
development project
One of Canada’s largest
underground gold mines
Consistent, low cost
open pit gold mine
Advanced Copper Gold porphyry
development project
2015: Guiding for Another Record Year
18 19 19 16
72 75 28 29 30 33
121
150
46 48 49 50
193
225
$635 $655 $628
$766 $676
$800
$1,090 $1,189 $1,210
$1,064 $1,182 $1,100
0
100
200
300
Q1 2013 Q2 2013 Q3 2013 Q4 2013 2013 2014E
YD Production (koz)
El Chanate Production (koz)
Total Cash Costs ($/oz)
AISC ($/oz)
(1) Prior to commissioning the underground mine at Young-Davidson, cash costs were calculated on ounces produced from the open pit only. All underground costs were capitalized, and any revenue related to underground
ounces sold was credited against capital. Subsequent to the declaration of commercial production in the underground mine, cash costs are calculated on ounces produced from both the open pit and underground mines, and
revenue related to the sale of underground ounces is recognized in the Company's Statement of Operations as revenue
(2) Cash costs and all in sustaining costs, prior to stockpile and heap leach inventory net realizable value adjustments & reversals. See the Non-GAAP Measures section on page 20 of the Management’s Discussion and Analysis
for the three and nine months ended Sept. 30, 2013
(3) Includes pre-production gold ounces from the Young-Davidson underground mine
0
25
50
75
100
125
150
175
200
225
250
275
2013 2014 2015E
Pro
ductio
n O
z.
(000’s
)
Growing Production
$0
$50
$100
$150
$200
$250
2013 2014 2015E
US
$ (
000’s
)
Declining Capital Investment
$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
2013 2014 2015E
US
$ p
er
ounce
All-in Sustaining Costs
► Commercial production at Young-
Davidson underground commenced on
Oct. 31, 2013
► Well positioned to deliver company-wide
quarter over quarter productivity
improvements
► Gold production increase of up to 14%, with continued annual growth over next 3 years
► Operating costs to decrease significantly with corresponding annual production increases
► Up to 36% decrease in capital investment, with additional decreases going forward
2015 Company-Wide Operational Guidance Highlights
GROWING PRODUCTION; DECLINING COSTS AND CAPITAL INVESTMENT
› Production growth: up to 14%; Cash costs decline: up to 13%; Capital investment decline: up to 36%
YOUNG-DAVIDSON: GROWING PRODUCTION; DECLINING COSTS AND CAPITAL INVESTMENT
› Production growth: up to 15%; U/G cash cost decrease: up to 17%; Capital investment decrease: up to 37%
› Underpins growing net free cash flow stream
6
Transitioned to Positive Net Free Cash Flow in Q4-2014
Young-Davidson Quarterly Operational Results
First Quarter
March 31/13
Second Quarter
June 30/13
Third Quarter
Sept. 30/13
Fourth Quarter
Dec. 31/13
First Quarter
Mar. 31/14
Second Quarter
June 30/14
Gold Ounces Produced 1.5 28,281 29,252 30,099 33,106 35,104 40,166
Underground Cash Costs1,2 - - - $663 $808 $803
Open Pit Cash Costs1,2 $694 $716 $666 $983 $1,350 $974
Total Cash Costs per oz.1,2 $694 $716 $666 $850 $1,009 $871
(1) Refer to endnote #1 (2) Refer to endnote #2 (5) Refer to endnote #5
Young-Davidson Production Growth (5)
Q1/13 Q2/13 Q3/13 Q4/13 Q1/14 Q2/14 Q3/14 Q4/14 2014
Gold ounces produced (5) 28,281 29,252 30,099 33,106 35,104 40,166 40,538 40,945 156,753
Underground cash costs per oz. - - - $663 $808 $803 $656 $656 $719
Open pit cash costs per oz. $694 $716 $666 $983 $1,350 $974 $923 $994 $1,071
Total cash costs per oz. (1)(2) $694 $716 $666 $850 $1,009 $871 $723 $719 $825
Underground mine
Tonnes mined per day 1,130 1,611 1,417 2,590 2,611 3,595 3,752 4,140 3,530
Grades (g/t) 2.7 2.5 2.8 3.1 2.8 3.3 3.1 3.0 3.1
Development metres 1,941 2,445 2,620 2,986 3,772 3,545 3,269 3,438 14,024
Mill processing facility
Tonnes processed per day 6,466 7,017 6,747 6,969 7,163 8,230 7,670 7,757 7,707
Grades (incl. open pit stockpile) 1.8 1.7 1.7 2.0 1.8 2.2 1.9 2.0 2.0
Recoveries (%) 86% 85% 89% 88% 87% 88% 90% 88% 88%
Young-Davidson Quarterly Operational Results
(1) Refer to endnote #1 (2) Refer to endnote #2 (5) Refer to endnote #5
11,950
17,825
26,363 28,281 29,252 30,099
33,106 35,104
40,166 40,538 40,945
Q2 12 Q3 12 Q4 12 Q1 13 Q2 13 Q3 13 Q4 13 Q1 14 Q2 14 Q3 14 Q4 14
Gold
Ounces P
roduced
(5)
Strong Operations: Growing Production
7
(1) Prior to inventory net realizable value adjustments and reversals
(2) Reserves and resources stated as at December 31, 2012. Resources are inclusive of reserves
Red Lake (incl. Cochenour)
498
Porcupine 293
Eleonore 350
Musselwhite 274
Meadowbank 377
LaRonde 247
Goldex 99
Lapa 76
Canadian Malartic (50%)
299
Detour Lake 540 Canadian
Malartic (50%) 299
Hemlo 205
Young- Davidson
170
Goldcorp Inc. Agnico EagleMines Ltd.
Detour GoldCorp.
Yamana GoldInc.
Barrick GoldCorp.
AuRico Gold Inc.
Source: Scotiabank
Gold Producers in Canada 2015E Gold Production (koz)
Photo
3,000
4,140
6,000
8,000 8,000
2013 2014 2015E 2016E 2017E
Ore
To
nnes p
er
Day
YE target of
2,000tpd
170 U/G miners
207 U/G miners
240 U/G miners
240 U/G miners
Young-Davidson: Strategic Canadian Asset
8
2013 2014 2015E
Gold Production (koz) (5) 120.7 156.8 160-180
Underground Cash Costs ($/oz) (1)(2) $663 $719 $600-$700
Open Pit Cash Costs ($/oz) (1)(2) $757 $1,071 $1,100-$1,200
Cash Costs ($/oz) (1)(2) $744 $825 $675-$775
Capital Investment ($M)(3) $191 $135 $85-$95
Projected Asset Life (years) +20
Underground Reserves (Moz) (4) 3.8
Au Grade (g/t) 2.74
Underground M&I (Moz) (4) 1.4
Au Grade (g/t) 3.19
Growing Gold Price Margin
Significant Gold Production Growth*(5) Production Ramp-Up (Year-End Exit Rates)
-
50,000
100,000
150,000
200,000
250,000
2012 2013 2014 2015E 2016E 2017E
Gold
Ounces
(1) Refer to endnote #1 (2) Refer to endnote #2 (3) Refer to endnote #3 (4) Refer to endnote #4
(5) Refer to endnote #5 * Source: FactSet consensus data.
YE target of
4,000tpd
1,000
1,100
1,200
1,300
1,400
1,500
1,600
1,700
1,800
1,900
2,000
Spot G
old
Price
As of Feb 17/15
CAD$ Gold US$ Gold
90-95% of all
cash outflows
are in CAD$
90-95% of Cash Outflows are in CAD$
9890L
9590L
9400L
9200L
8900L
Young-Davidson: Operational Excellence
9
2014 “Proof of Construct” Scorecard
140kozs to 160kozs 157kozs
UG productivity @ 4,140tpd Q4-2014
UG unit costs @ $39/tonne Q4-2014
UG cash costs @ $650/oz. Q3-2014
Positive net free cash flow Q4-2014
2015 Business Plan
Gold production growth of up to15%
UG productivity increase to 6,000tpd
UG cash costs guidance $600/oz. - $700/oz.
Capital expenditure decrease of up to 37%
Growing positive net free cash flows
18
%
17
%
23
%
21
%
37
%
36
%
44
%
45
%
53
% 75
%
88
%
10
0%
10
0%
10
0%
82
%
83
%
77
%
79
%
63
%
64
%
56
%
55
%
47
% 25
%
13
%
Q2 12 Q3 12 Q4 12 Q1 13 Q2 13 Q3 13 Q4 13 Q1 14 Q2 14 Q3 14 Q4 14 2015E 2016E 2017E
Underground Open Pit incl. Stockpile Mill Grade
Young-Davidson: Processing Facility
10
0 0
1,098 1,130 1,611 1,417
2,590 2,611 3,595 3,752 4,000
4,340 5,866
4,866 5,336 5,406 5,330
4,379 4,552 4,635 3,918 4,000
Q2 12 Q3 12 Q4 12 Q1 13 Q2 13 Q3 13 Q4 13 Q1 14 Q2 14 Q3 14 2014Target
Mill Ore Contribution
Underground TPD Open Pit TPD
0
50,000
100,000
150,000
200,000
250,000
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
FY 13A FY14E FY15E FY16E FY17E
Underground Open Pit Gold Ounces
0
50
100
150
200
250
300
To
nn
es p
rocessed
per
day
Ounces
Ounces
FY 12 FY 13 FY 14E FY 15E FY 16E FY 17E
Declining unit processing costs ($/t)
4,340
5,866 5,964 6,466
7,017 6,747 6,969 7,163
8,230
7,670 7,757
Q2 12 Q3 12 Q4 12 Q1 13 Q2 13 Q3 13 Q4 13 Q1 14 Q2 14 Q3 14 Q4 14
To
nnes p
er
Day
Mill Processing Expansion
Growing Underground Ore Feed
Commissioned capacity of 6,000 tpd
Mill capacity expanded to 8,000 tpd
Processing cash flow accretive stockpiles
Gold recovery target increased to 90%
Surface stockpiles of 2.5mt @ 0.75 g/t*
* As of Dec. 31/14
Gold Producers in Canada
Red Lake (incl. Cochenour)
498
Porcupine 293
Eleonore 350
Musselwhite 274
Meadowbank 377
LaRonde 247
Goldex 99
Lapa 76
Canadian Malartic (50%)
299
Detour Lake 540 Canadian
Malartic (50%) 299
Hemlo 205
Young- Davidson
170
Goldcorp Inc. Agnico EagleMines Ltd.
Detour GoldCorp.
Yamana GoldInc.
Barrick GoldCorp.
AuRico Gold Inc.
2015 P
roductio
n
Source: Scotiabank
Gold Producers in Canada
Young-Davidson: Strategic Canadian Asset
11
USD/CAD $0.95
USD/CAD $0.90
USD/CAD $0.85
0
200
400
600
800
1000
1200
0
50
100
150
200
250
2015E 2016E 2017E 2018E 2019E 2020E 2021E 2022E 2023E 2024E 2025E 2026E 2027E 2028E 2029E 2030E 2031E 2032E 2033E
Cash F
low
Bre
ak E
ven C
ost p
er
Ounce
Gold
Ounces (
000’s
)
Gold Ounces USD/CAD $0.95 USD/CAD $0.90 USD/CAD $0.85
One of the Largest Underground Gold Mines in Canada
Long Life, Low Cost, Significant Free Cash Flow
Note: Gold ounces produced and cash flow break-even costs per ounce are estimates only and should not be considered as Company guidance.
Map of Operations
(1) Average annual open pit production
(2) Reserves and resources stated as at December 31, 2012. Resources are inclusive of reserves
(3) Prior to inventory net realizable value adjustments and reversals
Au Production (koz)(1) 87
Cash Costs ($/oz) $753
AISC ($/oz) $947
Projected Mine Life (years) 10
Reserves (Moz)(2) 1.2
Au Grade (g/t) 0.67
Resources (Moz)(2) 1.3
Au Grade (g/t) 0.65
Mine Type Open Pit
El Chanate Mine
Insert MC
and
Hermisillo
El Chanate: Consistent Gold Production
12
2014 2015E
Au Production (koz) (5) 67.3 65-75
Cash Costs ($/oz) (1)(2) $669 $675-$775
Capital Investment ($M)(3) $26.1 $17.5 - $20
Projected Asset Life (years) 8
Reserves (koz) (4) 646
Au Grade (g/t) 0.74
-
10,000
20,000
30,000
40,000
50,000
60,000
70,000
2011 2012 2013 2014 2015E
Gold
Pro
ductio
n O
unces
Consistent Gold Production(5)
(1) Refer to endnote #1 (2) Refer to endnote #2 (3) Refer to endnote #3 (4) Refer to endnote #4 (5) Refer to endnote #5
Consistent production of up to 75kozs
Industry competitive operating costs
All-in sustaining costs of $950-$1,050/oz.
2015 capital decrease of up to 33%
Key exploration focus
(1) Net of by-product credits assuming $3.00/lb Cu
(2) Gold equivalent ounces calculated using long term consensus pricing of $1,304/oz Au and $3.08/lb Cu
Permitting application process
underway
Mine Type Underground Block Cave
Avg. LOM Annual Prod. 105 koz Au / 44 Mlbs Cu
Avg. LOM Cash Costs (US$/oz) (1) $213
Avg. LOM AISC (US$/oz) (1) $352
Projected Mine Life (years) 12
Development Capex ($M) C$384
Au.Eq. Reserves (Moz) (4) 3.3
Au grade (g/t) 0.56
Cu Grade (%) 0.28
Au.Eq. Resources (Moz) (4) 5.2
NPV (5%) >C$225M
2013 Kemess Underground Feasibility Highlights(4)
$1B of Surface Infrastructure - 50ktpd Mill, Grid Power, Tailings Storage Facility, Camp Facilities
Kemess Underground: Key Development Project
13 (1) Refer to endnote #1 (4) Refer to endnote #4
Fully operational surface infrastructure
Positive Feasibility Study completed
Permitting: Phase 2 of 3 phase process
Significant new exploration discovery
Kemess East: Significant New Discovery
14
KEMESS EAST Section A
Looking North
Expanded 2015 Exploration Program ($5 to $10M)
Initial Kemess East Resource of 5.5 Million Gold Equivalent Ounces(4)
Reserves and Resources of 10.6 Million Gold Equivalent Ounces at Kemess Property (4) Refer to endnote #4
Lynn Lake: High Grade Open Pit Project
15
Project Overview(7)
Mine Type Open Pit
Au Grade (g/t) 2.2
Au M&I (Moz) 1.50
Avg. LOM Annual Mill Prod. (koz) 145
Avg. LOM Cash Costs (C$oz) $530
Initial Capex (C$M) $185
Projected Mine Life (years) 12
NPV(5%) (C$M) $257
Optimized PEA
Assumptions (US$) $1,100 Au / $18 Ag
Source: Carlisle Goldfields Company Reports
Strategic Low-Risk Opportunity in Early-Stage, Highly Prospective Lynn Lake Mining District
Significant new value creating opportunity following inexpensive C$10M upfront investment (2014)
AuRico is the operator and has controlling representation on management committee
60% ownership interest by funding up to C$20M over 3 years and delivering a feasibility study
(7) Refer to endnote #7
0
50,000
100,000
150,000
200,000
250,000
1 2 3 4 5 6 7 8 9 10 11 12
Gold
ounces p
er
year
Life of Mine (years)
Annual Life of Mine Production(7)
One of the highest grade open pit deposits in Canada with significant exploration potential
Existing infrastructure in place, low power rates of C$0.027/kwh
Commenced Feasibility Study with Young-Davidson project team as lead
Significant 2015 resource delineation & extension drilling program ($5M to $10M)
Lynn Lake: High Grade Open Pit Project(7)
16
This transaction provides a low-risk opportunity to
gain access to an early-stage, highly prospective
land package for a minimal upfront cash
commitment;
We have structured the deal as an earn-in, which
provides us with a great deal of flexibility and
protects our current cash position;
Under the joint-venture agreement, AuRico will be
the operator and have controlling representation
on the management committee;
Lynn Lake is a highly prospective, past-producing
gold camp consisting of five high-grade deposits
with existing infrastructure in place and significant
exploration potential yet to be realized;
We believe Lynn Lake offers meaningful long-
term value at an attractive price which we can
develop and grow over time;
Source: Carlisle Goldfields Company Reports
North American Portfolio of Quality Assets
Producing Assets in Top Mining Jurisdictions
Feasibility: Kemess Provides Significant Option Value
Pre-Feasibility: Lynn Lake JV (25%) - a Strategic Low-Risk Opportunity
Low cost assets with an organic growth profile and free cash flow stream
Young-Davidson: One of Canada’s largest underground gold mines
El Chanate: Consistent, low cost open pit mine in Mexico
Kemess: Advanced development project in B.C.
Kemess Reserve and Resource Inventory: 10.6M Aue oz.
Permitting: Kemess Underground in Phase 2 of 3 Phases
Advanced high-grade open pit gold
mine development project
Advanced high-grade open pit gold mine in Manitoba
60% ownership by delivering a Feasibility Study
Commenced Feasibility Study
Significant new value creating opportunity
17
Balanced Portfolio: Built for Success
18
(0.60)
(0.50)
(0.40)
(0.30)
(0.20)
(0.10)
0.00
0.10
0.20
0.30
0.40
FY 14 FY 15E FY 16E FY 17E FY 18E
Per
Share
0.00
0.10
0.20
0.30
0.40
0.50
0.60
FY 14 FY 15E FY 16E FY 17E FY 18E
Per
Share
Growing Operating Cash Flows* Growing Production Profile*(5)
Consensus Illustrative Dividend Yield* (6) Growing Free Cash Flows*
* Source: FactSet consensus data. (5) Refer to endnote #5 (6) Refer to endnote #6
-
50,000
100,000
150,000
200,000
250,000
300,000
350,000
FY 14 FY 15E FY 16E FY 17E
Gold
Ounces (
5)
FY 15E FY 16E FY 17E FY 18E
Endnotes
20
All amounts are in US dollars unless otherwise indicated
1. Cash Costs per Gold Ounce and All-In Sustaining Costs (“AISC”) Per Gold Ounce are Non-GAAP measures that do not have any standardized
meaning prescribed by International Financial Reporting Standards (“IFRS” or “GAAP”), and that should not be considered in isolation from or as a
substitute for performance measures prepared in accordance with GAAP. See the Non-GAAP Measures section on page 22 of the Management's
Discussion and Analysis for the year ended December 31, 2014 available on the Company website at www.auricogold.com. 2014 fourth quarter and
annual cash costs are prior to inventory net realizable adjustments and reversals.
2. Cash costs for the Young-Davidson and El Chanate mines are calculated on a per gold ounce basis, net of by-product revenues and net realizable
value adjustments and reversals. Prior to 2014, gold ounces include ounces sold at the El Chanate mine and ounces produced at the Young-
Davidson mine. Commencing in 2014 cash costs for both the Young-Davidson and El Chanate mines were calculated based on ounces sold. Prior to
commissioning the underground mine at Young-Davidson, cash costs were calculated on ounces produced from the open pit only. All underground
costs were capitalized, and any revenue related to underground ounces sold was credited against capital expenditures. Subsequent to the
declaration of commercial production in the underground mine, cash costs are calculated on ounces produced from both the open pit and
underground mines, and revenue related to the sale of underground ounces is recognized in the Company’s Statement of Operations as revenue.
3. For more information regarding AuRico Gold’s 2014 operational estimates, including production, costs, and capital investments, please refer to the
press releases dated February 19, 2015 titled AuRico Gold Announces 2015 Operational Outlook, which are available on the Company website at
www.auricogold.com.
4. Reserves and resources for Young-Davidson and El Chanate mines, and Orion represent gold grade as per technical reports and Company
disclosure. For more information regarding AuRico Gold’s Mineral Reserves and Resources as at December 31, 2014, please refer to the press
release dated February 19, 2015 titled AuRico Reports 2014 Reserve & Resource Update available on the Company website at www.auricogold.com.
Measured and indicated resources excludes inferred resources. For more information on the Kemess Feasibility Study, please refer to the press
release dated March 25, 2013 titled AuRico Reports 2012 Reserve & Resource Update and Kemess Feasibility Study Results. For more information
regarding drilling results from the Kemess East discovery refer to the press release issued December 15, 2014 titled AuRico Gold Announces a New
Gold-Copper Porphyry Discovery at the Kemess Project; Initial Resource Estimate Expected in Early 2015. For more information on the initial
resource for Kemess East refer to the press release issued January 21, 2015 titled AuRico Gold Announces Initial Resource of 5.5 Million Gold
Equivalent Ounces at Kemess East; Reserves and Resources of 10.6 Million gold equivalent ounces at Kemess Property.
5. Production figures include gold ounces only. 2012 and 2013 production at the Young-Davidson mine includes pre-production ounces, which include
ounces produced prior to the declaration of commercial production on September 1, 2012, and the declaration of commercial production in the
underground mine on October 31, 2013.
6. The illustrative yield assumes the share price as of January 20, 2015. Consensus data is as of January 20, 2015. 2014 to 2017 per share numbers
are based on the number of shares outstanding as of December 2014. For more information regarding AuRico Gold’s dividend policy, please refer to
the press release dated November 6, 2014, available on the Company website at www.auricogold.com.
7. For more information regarding the Lynn Lake District, please refer to the press release issued by Carlisle Goldfields dated February 27, 2014 titled
Carlisle Announces Optimized PEA of the Farley and MacLellan deposits at Lynn Lake returns Post-Tax IRR of 26.3% at US$1100 gold price.
2015 Operational Estimates1
Gold Production (ounces) Low High
Young-Davidson 160,000 180,000
El Chanate 65,000 75,000
Total Production 225,000 255,000
Cash Costs per Ounce
Young-Davidson
Underground Mine $600 $700
Historical Open Pit Stockpile Inventory (see note below) $1,100 $1,200
Young-Davidson Total $675 $775
El Chanate $675 $775
Total Cash Costs per Ounce $675 $775
Note: For cash flow purposes, cost to process historical open pit stockpile inventory is approx. $800 per ounce
All-in Sustaining Costs per Ounce
Young-Davidson $950 $1,050
El Chanate $950 $1,050
Total All-in Sustaining Costs per Ounce2,3 $1,000 $1,100
Capital Investment Program ($000s)
Young-Davidson
Growth Capital $40,000 $45,000
Sustaining Capital $45,000 $50,000
Total Capital Investment – Young-Davidson $85,000 $95,000
El Chanate
Sustaining Capital $17,500 $20,000
Total Capital Investment – El Chanate $17,500 $20,000
Total Capital Investment $102,500 $115,000
Exploration Drilling Programs ($000s)
Kemess Development Project $5,000 $10,000
Lynn Lake Development Project $5,000 $10,000
Mexico Properties $2,000 $3,000
General and Administrative ($000s)4
Corporate G&A $15,000
Crocodile Gold Royalty Asset
Upfront Cash Receipt (January 2015) $17,000
Annual NSR Revenue Estimates (Payable in Quarterly Instalments) $2,500
1. The following currency assumptions were used to forecast 2015 estimates: 0.85:1 US dollar to the Canadian dollar and 14.0:1 Mexican pesos to the US dollar.
2. Company-wide all-in sustaining costs are defined as cash costs, sustaining capital, corporate G&A expense, excluding stock-based compensation and other non-cash items, and sustaining exploration.
3. Sustaining capital is defined as capital expenditures required to maintain current levels of production.
4. Does not include share-based compensation and other non-cash expenses. 21
2017
Young-Davidson Gold Mine
Operation at Full Capacity
Significant Free Cash Flow Profile
El Chanate Gold Mine
Consistent Production
Exploration Drilling Program
Kemess Development Project
Construction Decision
Kemess East Feasibility Advancement
Lynn Lake Development Project
Exploration Drilling Program Updates
Feasibility Published
Expected Receipt of Permits
Construction Decision
2016
Young-Davidson Gold Mine
Production Ramp up to 8,000tpd
Growing Free Cash Flow
El Chanate Gold Mine
Consistent Production
Exploration Drilling Program
Kemess Development Project
Expected Receipt of Permits
Kemess East Feasibility
Lynn Lake Development Project
Exploration Drilling Program Updates
Feasibility Advancement
Permitting Advancement
2015
Young-Davidson Gold Mine
Production Ramp up to 6,000tpd
Growing Free Cash Flow
El Chanate Gold Mine
Consistent Production
Exploration Drilling Program
Kemess Development Project
Initial Resource Estimate at Kemess East
Permitting Advancement
Expanded Exploration Drilling Program
Lynn Lake Development Project
Exploration Drilling Program Updates
Resource Extension & Delineation Program
Feasibility Program Advancement
AuRico: Value Creation Business Plan Significant Value
Opportunities In
Advanced Project
Pipeline Feasibility
Study Valuation Catalysts
22
Cash Flow Linked Dividend Policy
23
Consensus Illustrative Yield* (6)
(6) Refer to endnote #6 * Source: FactSet consensus data.
20% of Operating Cash Flow beginning in 2014
• Distributed approx. $42 million in dividends since inception
• Encourages financial discipline
• Linked to changes in business profitability
• Leveraged to gold price
Includes a Dividend Reinvestment Plan (“DRIP”)
1.7%
2.7%
3.2% 3.2%
FY 15E FY 16E FY 17E FY 18E
Industry
Experience Background
17 years
• Appointed President and Chief Executive Officer in July 2012
• Joined AuRico in February 2008 as Chief Financial Officer
• Former Chief Financial Officer at Highland Gold Mining
• Held senior roles with Barrick in the United States, Australia,
Russia and Central Asia
21 years
• Appointed Chief Financial Officer in January 2013
• Former Vice President of Finance, Operations and Projects for
Kinross Gold since 2009
• Former Chief Financial Officer for Baffinland Iron Mines from
2006 to 2009
• Held increasingly senior positions with Barrick from 1998 to 2006
30 years
• Joined the AuRico team through the Northgate transaction,
where he was Chief Operating Officer for eight years
• Prior to joining Northgate, Mr. MacPhail held increasingly senior
roles at Noranda, Teck, Homestake and Barrick
SCOTT PERRY
President and CEO
ROBERT CHAUSSE Executive Vice President
and CFO
PETER MACPHAIL Executive Vice President
and COO
Executive Management
24
Institution Name Shares (AUQ_TSE) % S/O (AUQ_TSE) Dominant Style City
Donald Smith & Company, Inc. 23,498,445 9.42 Value New York
Market Vector Junior Gold Miners–GDXJ 20,010,960 8.03 ETF New York
Market Vector Gold Miners–GDX 17,082,290 6.97 ETF New York
Van Eck Associates Corporation-Other Funds 7,643,947 3.70 Growth New York
USAA Asset Management Company 7,272,057 2.91 Specialty San Antonio
Wellington Management Company, LLP 6,940,986 2.78 Value Boston
River Road Asset Management, LLC 6,665,084 2.67 Value Louisville
Gabelli Funds, LLC 6,332,000 2.54 Value Rye
The Boston Company Asset Management, LLC 4,930,028 1.98 Value Boston
The Dreyfus Corporation 4,817,973 1.93 Value New York
Columbia Management Investment Advisers, LLC 4,547,547 1.82 Value Boston
Geologic Resource Partners, LLC 3,910,114 1.57 Alternative Boston
OppenheimerFunds, Inc 3,320,000 1.33 Growth New York
I.G. Investment Management, LTD (Canada) 3,266,219 1.31 Growth Winnipeg
Artisan Partners, L.P. 3,030,037 1.21 Growth Milwaukee
PSP Investments 2,934,241 1.18 Value Montreal
Global X Management Company, LLC 2,734,847 1.10 Index New York
Commerzbank Corporates & Markets (Germany) AG 2,089,830 0.84 Broker Frankfurt
The Vanguard Group, Inc. 2,088,420 0.84 Index Malvern
Norges Bank Investment Management (Norway) 2,051,646 0.82 Value Oslo
J.P. Morgan Securities, LLC (Broker) 1,807,216 0.72 Broker New York
Fiera Capital Corporation (Asset Management) 1,739,089 0.70 Value Montreal
BlackRock Asset Management Canada, LTD 1,690,558 0.68 Index Toronto
CPP Investment Board 1,621,812 0.65 Growth Toronto
Wells Capital Management, Inc. 1,572,618 0.63 Aggressive Growth San Francisco
Eagle Boston Investment Management, Inc. 1,568,780 0.63 Value Boston
Deutsche Bank Trust Company Americas 1,562,637 0.63 Value New York
Source: Ipreo (Feb. 17, 2015)
AuRico Institutional Shareholders
25
Mineral Reserve Estimates - Gold
Category Tonnes (000's) Grade (g/t) Ounces (000's)
Young-Davidson
Surface
Proven 2,501 0.76 61
Probable - - -
P&P 2,501 0.76 61
Underground
Proven 12,499 2.83 1,137
Probable 30,274 2.70 2,626
P&P 42,773 2.74 3,763
Total Young-Davidson P&P 45,273 2.63 3,823
El Chanate
Proven 18,255 0.80 472
Probable 8,958 0.60 174
Total El Chanate P&P 27,213 0.74 646
Kemess Underground
Proven - - -
Probable 100,373 0.56 1,805
Total Kemess P&P 100,373 0.56 1,805
AuRico Total P&P 172,860 1.13 6,274
2014 Mineral Reserve Estimates - Gold
26
Note: Mineral Resources are in addition to Mineral Reserves
2014 Mineral Resource Estimates - Gold
27
Mineral Resource Estimates - Gold Category Tonnes (000's) Grade (g/t) Ounces (000's)
Young-Davidson
Surface
Measured 496 1.13 18
Indicated 1,242 1.28 51
M&I 1,739 1.24 69
Underground
Measured 7,855 3.28 829
Indicated 6,090 3.07 601
M&I 13,946 3.19 1,430
Total Young-Davidson M&I 15,684 2.97 1,499
Surface Inferred 31 0.99 1
Underground Inferred 3,608 2.76 320
Total Young-Davidson Inferred 3,639 2.75 321
El Chanate
Measured 923 0.58 17
Indicated 1,842 0.87 52
Total El Chanate M&I 2,764 0.77 69
Inferred 184 0.38 2
Kemess Underground
Measured - - -
Indicated 65,432 0.41 854
Total Kemess Underground M&I 65,432 0.41 854
Inferred 9,969 0.39 125
Kemess East
Measured - - -
Indicated 55,864 0.52 939
Total Kemess East M&I 55,864 0.52 939
Inferred 117,152 0.38 1,424
Lynn Lake (25%)
MacLellan
Measured 3,753 1.99 240
Indicated 4,344 1.75 244
M&I 8,096 1.86 484
Inferred 475 2.01 31
Farley Lake
Measured - - -
Indicated 1,479 3.21 153
M&I 1,479 3.21 153
Inferred 1,091 2.87 101
Burnt Timber
Measured - - -
Indicated 255 1.40 11
M&I 255 1.40 11
Inferred 5,860 1.04 195
Linkwood
Measured - - -
Indicated 246 1.16 9
M&I 246 1.16 9
Inferred 5,251 1.16 196
Total Lynn Lake M&I 10,076 2.03 657
Inferred 12,676 1.28 522
Orion (50%)
Measured - - -
Indicated 554 3.66 65
Total Orion M&I 554 3.65 65
Inferred 91 3.33 10
AuRico Total M&I 150,373 0.84 4,083
Inferred 143,711 0.52 2,404
Mineral Reserve and Resource Estimates – Copper and Silver
Grade Contained Metal
Category Tonnes (000’s) Ag (g/t) Cu (%) Ag (000’s) oz Cu (000’s) lbs
Kemess
Underground
Probable Reserves 100,373 2.0 0.28 6,608 619,151
Indicated Resources 65,432 1.8 0.24 3,811 346,546
Inferred Resources 9,969 1.6 0.21 503 46,101
Kemess
East
Indicated Resources 55,864 2.0 0.41 3,601 503,663
Inferred Resources 117,152 1.8 0.34 6,739 871,407
Orion (50%) Indicated Resources 554 309 - 5,503 -
Inferred Resources 91 95 - 275 -
2014 Mineral Resource Estimates – Copper and Silver
28
Note: Mineral Resources are in addition to Mineral Reserves
Notes to Reserves and Resources
Notes to Mineral Reserve and Resource tables:
• Mineral Reserves and Resources have been stated as at December 31, 2014.
• Mineral Resources are exclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic
viability.
• El Chanate and Young-Davidson assumed a gold price of $1,250 per ounce for reserves and $1,450 per ounce for resources.
• Kemess Underground assumed a gold price of $1,300 per ounce, a silver price of $23.00 per ounce for silver, and a copper price of $3.00 per
pound for reserves. Kemess Underground assumed a $13.00 NSR cutoff for resources. Kemess East assumed a $15.00 NSR cutoff for
resources.
• Lynn Lake assumed a gold price of $1,555 per ounce for resources.
• Orion assumed a gold price of $850 per ounce and a silver price of $13.00 per ounce for resources.
• Mineral Reserves assume the following cutoff grades and process recoveries:
• Young-Davidson – Surface: 0.50 gpt cutoff, 91% mill recovery
• Young-Davidson – Underground: 1.90 gpt cutoff, 91% mill recovery
• El Chanate: 0.15 gpt cutoff, 30%-65% leach recovery
• Kemess Underground: $15 NSR cutoff, mill recovery of 72% for gold and 91% for copper
• Mineral Resources and Mineral Reserves have been classified in accordance with Canadian Institute of Mining, Metallurgy and Petroleum
(“CIM”) “CIM Definition Standards – For Mineral Resources and Mineral Reserves” adopted by the CIM Council in accordance with the
requirements of National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”), as is required by Canadian securities
regulatory authorities. In addition, while the terms “Measured”, “Indicated and “Inferred” Mineral Resources are required pursuant to NI 43-101,
the SEC does not recognize such terms. Canadian standards differ significantly from the requirements of the SEC, and mineral resource
information contained herein is not comparable to similar information regarding mineral reserves disclosed in accordance with the requirements
of the SEC. Investors should understand that “Inferred” Mineral Resources have a great amount of uncertainty as to their existence and great
uncertainty as to their economic and legal feasibility. In addition, investors are cautioned not to assume that any part or all of AuRico’s Mineral
Resources constitute or will be converted into Reserves.
• Orion Mineral Resources are reflected on a 50% basis. Following the completion of a joint venture agreement, Minera Frisco, S.A.B. de C.V.
has a 50% interest in the Orion project.
• Lynn Lake Mineral Resources are reflected on a 25% basis. AuRico acquired a 25% interest in the Lynn Lake properties in November 2014.
• Mineral Reserve and Resource tonnage and contained metal have been rounded to reflect the accuracy of the estimate, and numbers may not
add due to rounding.
• The Company’s normal data verification procedures have been used in collecting, compiling, interpreting and processing the data used to
estimate mineral reserves and mineral resources and data underlying the information, opinion and outlook contained herein. Independent data
verification has not been performed.
• Mineral Resources were prepared under the supervision and review of Jeffrey Volk, CPG, FAusIMM, the Director of Reserves and Resources,
for AuRico Gold Inc. Mineral Reserves were prepared under the supervision and review of Chris Bostwick, FAusIMM, the Senior Vice President
Technical Services, for AuRico Gold Inc. Both Messrs Volk and Bostwick are “Qualified Persons” as defined by National Instrument 43-101.
29
Recommended