MRV & Capacity building status

Preview:

DESCRIPTION

ECUADOR. MRV & Capacity building status. Andrea Bustos andrea.bustos@ambiente.gob.ec. Thinking about capacity building efforts and needs, where do you think your country is in terms of addressing forest change, forest carbon stocks?. Baseline of Deforestation. Deforestation Drivers. - PowerPoint PPT Presentation

Citation preview

www.gfoi.org

GFOI Capacity Building SummitArmenia, Colombia – September 17 to 19, 2014

MRV & Capacity building statusECUADORECUADOR

Andrea Bustos andrea.bustos@ambiente.gob.ec

www.gfoi.org

GFOI Capacity Building SummitArmenia, Colombia – September 17 to 19, 2014

Thinking about capacity building efforts and needs, where do you think your country is in terms of addressing forest change, forest carbon

stocks?

Baseline of Deforestation

Deforestation Drivers

Incentives and Mitigation Measures

www.gfoi.org

Land cover Maps

199020002008

www.gfoi.org

Deforestation Rate

Tasa de deforestación 1990 - 2000

% -0.65

Ha/año 92.787

1990 - 20002000-2008

2000 - 2008

-0.5877.742

www.gfoi.org

SDCG-4, Caltech, CA, USA4th-6th September 2013

Drivers of DeforestationOne of the main drivers of deforestation is the expansion of the agriculture in frontier areas. For the two periods 1990-2000 and 2000-2008 the 99.4% of changes were found in the conversion of forest to agricultural land. Powered by monoculture like oil palm an sugar cane.

www.gfoi.org

• Protect the forests and their ecological, economic and cultural values (4 million hectares).

• Reducing deforestation rates and emissions of greenhouse gases associated

• Improve the living conditions of rural populations (approx. 500,000 participants)

Objectives:

Incentives and Mitigation Measures

www.gfoi.org

Prioritization Criteria

- Areas with high threat of deforestation

- Relevant areas for maintaining ecosystemic services.

- Areas with high levels of poverty

www.gfoi.org

2014 RESULTSTotal Individual Collective

Agreemet 2.510 2.341 169

Beneficiary 171.279 10.670 160.609

Hectares 1.333.004,93 164.753,71 1.168.251,22

Has in Conservation

149.585,17 6.584,12 143.001,05

Total Investment since 2008: USD $ 24.3 millones / Fuente: PGE

Annual incentive cost 2013: USD $ 9,1 millones / Fuente: PGE

www.gfoi.org

GFOI Capacity Building SummitArmenia, Colombia – September 17 to 19, 2014

LEYENDA

Carbono (T/Ha)

0 - 50

50 - 100

100 - 150

150 - 200

200 - 250

250 - 300

300 - 327,47

Carbon Map

1.600.526.432 Ton. Carbono

Forest National Inventory 9 Strata

www.gfoi.org

GFOI Capacity Building SummitArmenia, Colombia – September 17 to 19, 2014

What are the approaches from international cooperation that you have find more useful for advancing the developing of your country MRV

system?

- Generated geographic information with more accurate data- Improve our understanding of what is already developed- Validate the information reported- Establish processes

The more useful approaches became from the capacitation initiatives.

www.gfoi.org

Data AccuracyAccuracy (%) for the year 1990: 69 %Accuracy (%) for the year 2000: 73 %Accuracy (%) for the year 2008: 76 %

- Generated geographic information with more accurate data

www.gfoi.org

GFOI Capacity Building SummitArmenia, Colombia – September 17 to 19, 2014

- Improve our understanding of what is already developed

www.gfoi.org

GFOI Capacity Building SummitArmenia, Colombia – September 17 to 19, 2014

Validate the information reported

LEYENDA

Carbono (T/Ha)

0 - 50

50 - 100

100 - 150

150 - 200

200 - 250

250 - 300

300 - 327,47

Flow Tober

www.gfoi.org

Establish processes

www.gfoi.org

SDCG-4, Caltech, CA, USA4th-6th September 2013

Transmisión en vivo y pantalla del NOChttp://patrimonio.ambiente.gob.ec/alerta_temprana/drone.php http://patrimonio.ambiente.gob.ec/alerta_temprana/centro_control.php

MONITORING THE NATURAL HERITAGE

www.gfoi.org

GFOI Capacity Building SummitArmenia, Colombia – September 17 to 19, 2014

What are the current programs from international cooperation in your country that aim to develop capacity in the implementation of your MRV

system?

KFW – Climate Change

UN-REDD PROGRAMME

FAO

SILVACARBON

OTCA

www.gfoi.org

GFOI Capacity Building SummitArmenia, Colombia – September 17 to 19, 2014

Can you identify the most immediate needs on capacity building for forest monitoring?

Institucional - Consolidation and Institutionalization of the Monitoring Unit.

Remote Sensing-Degradation Metodology-Early Warning System implementation-Automation in Clasification Images (ReapidEye, Landsat and Modis)-Integrated the different types of remote information (lidar,radar,drone,optical)

Reference Scenario-National inventory of greenhouse gas-Consolidation of the National System of Permanent Plots (2014)

www.gfoi.org

GFOI Capacity Building SummitArmenia, Colombia – September 17 to 19, 2014

How do you envision international cooperation to assistance in the short term 1 – 2 years and in the long term 5 years from now?

SHORT TERM

LONG TERM

Polish our Baseline and Methodologies

Keep generating accurate information, maintaining the process and improvement methodologies, because we still learning

www.gfoi.org

SDCG-4, Caltech, CA, USA4th-6th September 2013

Thank youImagen: Terry Sunderland, CIFOR

Recommended