MIDDLE SCHOOL RENOVATION
WEEKLY PROGRESSAUGUST 2 - 6
08/05/10
HALLWAY SOUTH SIDE GOING TO SIXTH GRADE POD
SOUTH SIDE OLD MUSIC ROOM AREA – HALLWAY TO NEW 6-BLACK
CLASSROOMS
08/05/10New 6-Black Classrooms
08/05/2010Old Weight Room—New Music room
08/05/10 NORTH SIDE HALL 1ST FLOOR
08/05/10LIBRARY 2ND FLOOR TO BE NEW COMPUTER CLASSROOM
08/05/10
08/05/10LIBRARY 2ND FLOOR – NEW COMPUTER CLASSROOM
08/05/10MIDDLE SCHOOL OFFICE
08/05/2010Middle School Office
08/05/10SOUTH SIDE HALL 1ST FLOOR
08/05/10CLASSROOMS IN OLD STORAGE
ROOM LOCATION
08/05/10NORTH SIDE STUDENT ENTRANCE NEAR GYM
08/05/10CONCRETE FLOOR FINISHED IN
BASEMENT STORAGE AREA
7/30/10EAST HALLWAY 2ND FLOOR 7-BlackPOD
AREA
08/05/2010New 7-Black Classroom
08/05/2010Old 2nd Floor LGI Room
New 2nd Floor Classrooms and Hallway
08/05/2010New 8-Orange Classroom