Objective ITY-ADQ

Preview:

DESCRIPTION

Objective ITY-ADQ. ESSIP Plan 2014. Ana Paula FRANGOLHO DSS/EIPR 06.10.2014. Objective ITY-ADQ. Introduction Explanation and scope Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions Supporting Material Implementation Support - PowerPoint PPT Presentation

Citation preview

Objective ITY-ADQ

ESSIP Plan 2015

Ana Paula FRANGOLHODPS/PEPR

01.11.2015

ESSIP Plan 2015 / Objective ITY-ADQ 2

Objective ITY-ADQ

Introduction Explanation and scope Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions Supporting Material Implementation Support Objective Coordinator’s Analysis & Conclusions Links and contacts

Why an ITY – ADQ ESSIP objective?

ESSIP Plan 2015 / Objective ITY-ADQ 3

Explanation and scope

ITY ADQ was derived from Regulation (EU) No 73/2010 of 26 January 2010 laying down requirements on the quality of aeronautical data and aeronautical information (Official Journal L23/6, dated 27.01.2010);

A new Regulation (EU) No 1029/2014 was approved in 26 September 2014 amending Regulation (EU) No 73/2010. Some definitions were clarified and changed (in accordance with the most recent amendment to ICAO Annex 15) but it has no impact in the content of the ESSIP objective.

The aim is to improve the quality of aeronautical data/information in terms of accuracy, resolution and integrity;

In accordance with [Article 2(3)] it applies up to the moment when the aeronautical data and/or aeronautical information are made available by the aeronautical information service provider to the next intended user.

ESSIP Plan 2015 / Objective ITY-ADQ 4

Explanation and scope

It applies to EATMN systems, their constituents and associated procedures involved in the origination, production, storage, handling, processing, transfer and distribution of aeronautical data/information [Article 2(1)]

Following aeronautical products made available by Member States are included [Article 2(1)]:

Integrated Aeronautical Information Package (IAIP), with the exception of aeronautical information circulars;

Electronic obstacle and electronic terrain data or elements thereof; Aerodrome mapping data.

ESSIP Plan 2015 / Objective ITY-ADQ5

Explanation and scope

In accordance with [Article 2(2)] it applies to: ANSPs and AIS Providers; Operators of those aerodromes and heliports for

which IFR or Special-VFR procedures have been published in national aeronautical information publications;

Public or private entities providing: Services for the origination and provision of survey data; Procedure design services; Electronic terrain data; Electronic obstacle data.

ESSIP Plan 2015 / Objective ITY-ADQ 6

ITY-ADQ ESSIP & IR 73/2010

ESSIP Plan 2015 / Objective ITY-ADQ 7

ADQ IR 73/2010

Chapter IGeneral Provisions

Chapter IIInteroperability &

PerformanceChapter III

Quality, SafetySecurity Req.

Chapter IV Conformity &

Additional Req.Chapter V

Final Provisions

Annexes

AffectedParties

Translated into

ITY-ADQ ESSIP

Key obligations

StakeholderLines of Action

What?Ensure Compliance…

How?

Supportingmaterial

Measurablefinalisation

criteria

NSA

ANSP/AISP

APO

Public & Privateentities

Implement data quality and process

requirements

Establish formal arrangements

Establish consistency mechanisms and implement

timeliness requirements

Implement personnel performance requirements

Implement common dataset

digital exchange

Implement a QMS fulfill safety & security

objectives

Implement all data requirements

Link to European ATM Master Plan

ESSIP Plan 2015 / Objective ITY-ADQ 8

Improved Supply Chain for Aeronautical Data through Common Quality Measures

IS0202

Facilitated Aeronautical Data Exchangesthrough Digitalised Information

IS0204

SLoAs

ESSIP Plan 2015 / Objective ITY-ADQ 9

Group necessary actions per Stakeholder

Link them with IR Articles, Annexes and Timing

Allocate obligations per Stakeholder group

Decompose IR into main legal obligations

ITY-ADQ

Most important SLoA(s)

ASP06 - Implement the common dataset and digital exchange format

ASP01 - Implement data quality and process requirements APO04 - Implement the common dataset and digital exchange

format requirements APO01 - Implement data quality and process requirements IND04 - Implement the common dataset and digital exchange

format requirements IND01 - Implement data quality and process requirements REG01 - Verify the compliance with data quality requirements and

supervise safety assessments

ESSIP Plan 2015 / Objective ITY-ADQ10

Finalisation criteria

ESSIP Plan 2015 / Objective ITY-ADQ 11

Data quality requirements implemented and documented

Certificates (QMS) issued by third parties

Formal arrangements between parties

EC Declarations & Technical file

Safety assessment

ITY-ADQ

Closed Questions/Finalisation Criteria

Closed questions included in the database are coming from the finalization criteria in the form of a direct question

ESSIP Plan 2015 / Objective ITY-ADQ12

Supporting Material

ESSIP Plan 2015 / Objective ITY-ADQ 13

Non-Mandatory: EUROCONTROL Guidelines

Non-Mandatory: Material i.e. ISO Standards

Non-Mandatory: EUROCONTROL Specifications

ITY-ADQ

IMPLEMENTATION SUPPORT

The EUROCONTROL ADQ Implementation Support Cell was set up to assist the States with the implementation of the Aeronautical Data and Information Quality (ADQ) implementing rule in the following keys areas:

Support to the establishment and provision of means of compliance;

Support to the implementation of the provisions of the implementing rule;

Support to the National Supervisory Authorities;

Support to the overall implementation and compliance monitoring process.

Any question with regard to the ADQ IR can be addressed to the Implementation Support Cell at:

adq@eurocontrol.int or Tel: +32 2 729 9818

ESSIP Plan 2015 / Objective ITY-ADQ 14

ESSIP Plan 2015 / Objective ITY-ACID 15

ESSIP Report 2014

ESSIP FOC: 06/2017

Planned Achievement: 07/2017 (80% completion)

0% complete

Late

(months): +1

Objective Coordinator’s Analysis & Conclusions

ESSIP Plan 2015 / Objective ITY-ADQ16

Aeronautical DataTailoring RequirementsAeronautical DataTailoring Requirements

End-Usere.g. Airlines,

Aircraft Owner

Flight PlanningData Application

Provider

FMS DataApplicationIntegrator

e.g. Thales, SI

Simulation DataApplication

Provider

Data Service Providere.g. Jeppesen,LIDO, EAG

End-Usere.g. Airlines,

Aircraft owners

End-Usere.g. Airlines,

Aircraft Owner

End-Usere.g. Airlines,

Aircraft Owner

Flight PlanningData Application

Provider

FMS DataApplicationIntegrator

e.g. Thales, SI

Simulation DataApplication

ProviderFlight Planning

Data ApplicationProvider

FMS DataApplicationIntegrator

e.g. Thales, SI

Simulation DataApplication

Provider

Data Service Providere.g. Jeppesen,LIDO, EAG

Data Service Providere.g. Jeppesen,LIDO, EAG

Data Service Providere.g. Jeppesen,LIDO, EAG

End-Usere.g. Airlines,

Aircraft owners

End-Usere.g. Airlines,

Aircraft owners

Aerodrome

Air TrafficService Provider

Other State Sources, Geographical Institute,

Equipment Services

Procedure &AirspaceDesigner

MetService Provider

SARService Provider

AeronauticalInformation

Service

CommService Provider

AIPs

NOTAM

Aerodrome

Air TrafficService Provider

Other State Sources, Geographical Institute,

Equipment Services

Procedure &AirspaceDesigner

MetService Provider

SARService Provider

AeronauticalInformation

Service

CommService Provider

AIPs

Aerodrome

Air TrafficService Provider

Other State Sources, Geographical Institute,

Equipment Services

Procedure &AirspaceDesigner

MetService Provider

SARService Provider

AeronauticalInformation

Service

CommService ProviderAerodrome

Air TrafficService Provider

Other State Sources, Geographical Institute,

Equipment Services

Procedure &AirspaceDesigner

MetService Provider

SARService Provider

AeronauticalInformation

Service

CommService Provider

AIPsAIPs

NOTAM

• New objective based on a complicated regulation to address/solve a data quality problem

• Challenging for implementation due to the large spectrum of data/information

• May imply significant investments and/or adaptations of existing systems

• Involves a large group of stakeholders including industry/manufacturers

• Too much regulation and many administrative tasks (overregulation?) required

Links and contacts

Objective Coordinator: Frangolho A-P., +32 2 729 4702

ana-paula.frangolho@eurocontrol.int

DSS Objective Expert(s): Unterreiner M., +32 2 729 3038

manfred.unterreiner@eurocontrol.int

Implementation Support Cell: Tel: +32 2 729 9818

adq@eurocontrol.int

ESSIP Plan 2015 / Objective ITY-ADQ17

Recommended