ICAO PBN Operational Approval Course
PBN Operational Approval Navigation Databases
ICAO PBN Operational Approval Course
Requirement for Navigation Databases
• Most navigation specifications require a navigation database
• Exceptions are: • RNAV 10
• RNAV 5
• Procedures for maintaining currency, checking for errors and reporting errors to the navigation database supplier must be documented
• Suppliers of the navigation data should hold an LoA
2 ICAO PBN Operational Approval Course 2
RNAV 10 and RNAV 5 Navspecs support legacy navigation systems (INS) which do not use an
airborne nav database
ICAO PBN Operational Approval Course
Communications Service Provider
Aerodrome Air Traffic Service Provider
Procedure & Airspace Designer
Aeronautical Information
Service
End Users
NOTAM AIP
Avionics Navigation Data
Provider
Flight Planning Navigation Data
Provider
End Users
Simulator Navigation Data
Provider
Navigation Data Tailoring Requirements
Navigation Data Provider
Other Government
Sources
Navigation Data Chain
3 ICAO PBN Operational Approval Course 3
ICAO PBN Operational Approval Course
Navigation Data
• PBN is dependent on Nav Data
• Valid data is critical to flight safety
• Long chain from origin to aircraft • Opportunity for error/corruption at each stage
• Sound QA procedures need to be in place
• BUT operators responsible for managing their own safety • Procedures for checking, validating, managing data necessary
4 ICAO PBN Operational Approval Course 4
Nav Database suppliers should have a QA process. But QA cannot eliminate ALL errors! Operators must
have sound database management procedures
ICAO PBN Operational Approval Course
Navigation Data Formats
5 ICAO PBN Operational Approval Course 5
Surveyor/ Designer
Civil Aviation Authority
Data House
Avionics Manufacturer/ Data Packer
Airborne RNAV System
AIP ARINC 424
Packed Data Various Formats
Paper
Electronic
ICAO PBN Operational Approval Course
Delivery Schedule
6 ICAO PBN Operational Approval Course 6
7 Days Delivery to Operator
15 Days FMS Data Production
20 Days Cut Off
28 Days Latest Delivery Date
42 Days Normal Publication Date
56 Days Publication Date for Major Changes
Data is frozen for
28 days
Effective Date
ICAO PBN Operational Approval Course
Actions on delivery
• Packed navigation databases delivered to operator at least one week prior to the AIRAC effective date.
• Operator should have procedures in place to ensure: • correct version of database is loaded on aircraft
• any database errors/omissions reported by the suppliers addressed expeditiously by flight crew briefing/removal of procedures etc.
• any database errors/omissions identified by the operator reported back to supplier
• version of the loaded navigation database checked for validity by the flight crew prior to departure
7 ICAO PBN Operational Approval Course 7
ICAO PBN Operational Approval Course
Nav Database Management • Specific procedures required for RNP AR APCH
• Responsible database manager
• Documented process for accepting, verifying, and loading
• Documented process under configuration control
• Electronic nav database comparison required
• Initial
• 28 day cycle
• Similar database management procedures recommended for other operations
8 ICAO PBN Operational Approval Course 8
RNP AR APCH enables operations with reduced navigation tolerances and are more sensitive to nav data errors
BUT nav data errors can occur on ALL operations and the magnitude is not related to the type of operation
ICAO PBN Operational Approval Course
Maintenance Program
• Part of standard maintenance requirements
• Usually documented in Maintenance Manual
• Includes navigation database management
9 ICAO PBN Operational Approval Course 9
ICAO PBN Operational Approval Course
QUESTIONS?
10 ICAO PBN Operational Approval Course 10