September 2015Philippine Transport Sector
2
Philippine Transport Sector:
Developments and Project Pipeline
Department of Transportation and Communications
September 2015
3
Transport development plan
INITIATIVES
� Data Driven
� Better management and processing of information that makes franchising transparent improving
competition
� Improve the collection of trip data to determine optimal routes and supply information
� More Lines, More Connections
� Increase rail transportation network to increase access and mobility
� New Buses and New Routes
� Bus Rapid Transit Projects
� Seamless Terminal Transfers
� Provision of new provincial bus routes to correct supply gaps caused by franchise restrictions
� Bus routes will be introduced on corridors that have no or limited public transportation
� Better Services
� Providing a unified ticketing system
� Creating better interconnections
� Provide better service levels to the riding public by reducing headway
4
Transport development plan
Key Performance Indicators
� Reduce transport cost by 8.5%
� Increase urban mass transport ridership from 1.2mn to 2.2mn (2016)
� Development of intermodal facilities
� Lessen logistics costs from 23% to 15%
� Improve transport linkages and efficiency
� Airport infrastructure for 10mn foreign and 56mn domestic tourists
� Identify and develop key airport tourism destinations to improve market access and
connectivity
� Reduce transport-related accidents
� Impose standards and operating procedures
GOALS
5
Major accomplishments
As of 15 September 2015
� Full operationalization of Ninoy Aquino International Airport (NAIA) Terminal 3
� Upgrading of NAIA Terminal 1
� Civil aviation upgrades
� Upgrade of Philippine civil aviation to Category 1 by the United States Federal Aviation
Administration
� NEDA Approval of Clark International Airport – Passenger Terminal Building (PTB)
� A new passenger terminal building is to be constructed in Clark which will serve 3mn
passengers yearly to meet growing demand in Central and North Luzon.
� NEDA Approval of Naga Airport and Busuanga Airport
� Reorientation of the airport to allow dual approach, night operations and lower travel cost by
up to 50%
AVIATION SECTOR
National Economic and Development Authority (NEDA)
6
Major accomplishments
� Deployment of Philippine Coast Guard assets to the West Philippine Sea
� Full assumption of the Maritime Industry Authority of the responsibility mandated by Executive
Order 75 and its Implementing Rules and Regulations, and implementation of the Standards of
Training, Certifications, and Watchkeeping
� Total of 38 port projects awarded
MARITIME SECTOR
� Standardization of motor vehicle and motorcycle license plates
� LTO Service Improvement Program
� Increase accessibility by opening Driver’s License Renewal Offices at various shopping malls.
� On-going reduction of License Plates back-logs
� Ongoing construction of Skyway Stage 3
� Cebu Bus Rapid Transit System (BRT) to start construction by Q2 2016
� Integrated Transport System (ITS) Southwest awarded and concession agreement
signed
ROAD SECTOR
As of 15 September 2015
Land Transportation Office (LTO)
7
Major accomplishments
� Procurement of 48 additional light rail vehicles for MRT-3
� Delivery to start at Q4 2015
� Successful Automatic Fare Collection System (AFCS) Pilot-Test
� Public response from the commuters were positive during the trial run, full operations
targeted to start by September 2015.
� Procurement of LRT Line-1 Cavite Extension PPP Project
� Ongoing implementation
� LRT Line-2 Masinag Extension Ground Breaking
� NEDA Approval of Additional Rail Projects
� LRT Line 4 and LRT line 6
RAIL SECTOR
As of 15 September 2015
Metro Rail Transit (MRT); Light Rail Transit (LRT)
8
Mass transit system projects
As of September 2015
Project Mode Status
AFCS PPP Under implementation
C-5 BRT PPP For approval
Manila BRT ODA For NEDA approval
MRT 3 Capacity Expansion GAA Under implementation
ITS Southwest PPP Under implementation
ITS South PPP For Award
ITS North PPP Study on-going
Manila Bay – Pasig River Ferry Service PPP Study on-going
LRT 1 Cavite Extension PPP Under implementation
LRT 6 Dasmariñas Line PPP NEDA Approved
MRT 7 (Commonwealth Line) PPP Under implementation
LRT 2 East Extension (Masinag) GAA Under implementation
LRT 2 West Extension GAA Under procurement
LRT 2 O&M PPP Under procurement
LRT 4 (Taytay Line) PPP NEDA Approved
North-South Railway – North ODA Under Implementation
North-South Railway – South PPP Under Procurement
�Manila BRT
NSRP - North
MRT 7
LRT 1
LRT 2
C5 BRT
MAPALLA
Ferry
MRT 3
ITS Southwest
ITS South
NSRP - South
NAIA
Note: PPP – Public-Private Partnership; GAA – General Appropriations Act (Government-Funded) ;
ODA – Official Development Assistance (Foreign-Assisted)
9
Mass transit system projects
Existing Mass Transit System
LRT 1
� Roosevelt – Baclaran
� 19.7 km
LRT 2
� Recto - Santolan
� 13.8 km
MRT 3
� North Avenue – Taft Avenue
� 16.3 km
PNR
� Tutuban - Cabuyao
� 52.9 km
LRT 1
LRT 2
MRT 3
PNR
NAIA
10
Mass transit system projects
IMPACT
Manila BRT
NSRP - North
MRT 7
LRT 1
LRT 2
C5 BRT
MAPALLA Ferry
MRT 3
ITS Southwest
ITS South
NSRP - South
NAIA
� TOTAL COST: USD20,909mn (PHP940bn)
� 9 additional lines
� 3 additional terminals
� 2.2 additional daily commuters
� 140 additional passenger stations
� 120 km additional road & rail mass transit
� 1 hour away central business district
11
Airport projects
Airport Projects Nationwide
�����
�����
�����
�����
�����
�����
����������
�����
�����
�����
�����
�����
�����
�����
����������
����������
�����
�����
�����
�����
����������
�����
�����
�����
����������
�����
�����
�����
�����
�����
�����
�����
�����
���������������
�����
�����
�����
�����
�����
����������
ProjectsAirports Upgraded
Est. Cost (PHP bn)
Est. Cost (USD mn)
Expansion & Modernization of Key Gateways
3 39.7 882.7
Other PPP Airport Projects
5 20.3 452.3
Other Key Tourism Airports
9 23.5 523.1
Other Key Secondary Airports
9 6.7 148.2
Other Airport Projects 22 2.0 44.4
TOTAL 48 92.2 2,050.7
12
Airport projects
Key International Airports
ProjectsEst. Cost (PHP bn)
Est. Cost (USD mn)
Ninoy Aquino International Airport*
15.0 333.3
Clark International Airport* 7.2 160.0
Mactan-Cebu International Airport
17.5 389.3
Davao International Airport**
5.9 130.7
TOTAL 45.6 1,013.3
Clark Int’l
NAIA (Manila)
Davao Int’l
Mactan-Cebu In’tl
*Estimated; Cost of PPP component not included**Cost included in the Regional Airports for PPP
13
Airport projects
Regional Airports for PPP
Clark Int’l
NAIA (Manila)
Davao Int’l
Laguindingan
New Bohol
Bacolod Int’lIloilo Int’l
Mactan-Cebu
In’tl
Expected Initial Investment
PHP bn USD mn
Package A:PHP12.8bn / USD282.5mn
Davao 5.9 130.7
Laguindingan 2.3 50.2
New Bohol (Panglao) 4.6 101.6
Package B:PHP7.6bn /
USD169.8mn
Iloilo 4.0 89.6
Bacolod-Silay 3.6 80.2
TOTAL 20.4 452.3
Expected Total Investment
PHP bn USD mn
Package A:PHP57.5bn /
USD1,278.5mn
Davao 40.6 901.6
Laguindingan 14.6 324.9
New Bohol (Panglao) 2.3 52.0
Package B:PHP50.7bn /
USD1,125.8mn
Iloilo 30.4 675.6
Bacolod-Silay 20.3 450.2
TOTAL 108.2 2,404.3
14
Airport projects
Other Key Tourism Airports
Airports for Expansion and Modernization
COST(PHP bn)
COST(USD mn)
Naga 2.3 50.2
Kalibo International 2 44.4
Bicol International 6.6 146.9
Busuanga 4.1 99.1
Tacloban 4 88.9
Caticlan 3.5 76.9
San Vicente 0.9 20
Siargao 0.2 4.4
Laoag International 0.01 0.2
TOTAL 23.6 531
Naga
Kalibo
Bicol Int’l
Busuanga
Tacloban
Caticlan
San Vicente Siargao
Laoag Int’l
15
Airport projects
Other Key Secondary Airports
Zamboanga Int’l
Ozamis
Calbayog
Sanga-Sanga General Santos
Roxas
Butuan
Surigao
Tuguegarao
Airports for Expansion and Modernization
COST(PHP bn)
COST(USD mn)
Surigao 2 44.4
General Santos 1 22.2
Tuguegarao 1 22.2
Calbayog 0.8 17.8
Ozamis 0.7 15.6
Roxas 0.4 9.7
Butuan 0.4 9.7
Sanga-Sanga 0.3 5.5
Zamboanga International 0.1 1.1
TOTAL 6.7 148.2
16
Airport projects
Other Airport Projects
Dipolog Airport
Cotabato Airport
Antique Airport
Bantayan Airport
Batanes Airport
Calayan Airport
Masbate Airport
Marinduque Airport
Siquijor Airport
Vigan Airport
Lubang Airport
Jolo Airport
Bagabag Airport
Cauayan Airport
Palanan Airport
Taytay Airport
Romblon Airport
Virac Airport
Catarman Airport
Camiguin Airport
Mati Airport
Cagayan de Sulu Airport
Tagbilaran Airport
Cagayan de Oro Airport
Dumaguete Airport
Camiguin Airport
Bukidnon Airport
Maasin Airport
New Leyte (Tacloban) Airport
Estimated Cost: USD44.4mn (PHP2.0bn)
17
Other PPP projects
Davao Sasa Port Modernization
� USD422mn (PHP19bn)
� Development and modernization of the Davao Sasa Port
� Construction of port infrastructure, including a new apron, linear quay, back-up area expansion, container yards, warehouses, and
the installation of new equipment like ship-to-shore cranes and rubber-tyred gantry cranes
� Status: UNDER PROCUREMENT
September 2015