View
13
Download
0
Category
Preview:
DESCRIPTION
POWER PLANT AND LABORATORY INTERFACE AND DATA MANAGEMENT IN THE ELECTRONIC WORLD. Rebecca Charles – TBE Lynne Perry – TBE Doug Wahl – Exelon. Introduction. Power Plant Perspective – Doug Wahl Laboratory Interface – Rebecca Charles REMP Report Preparation – Lynne Perry. - PowerPoint PPT Presentation
Citation preview
POWER PLANT AND LABORATORY INTERFACE AND DATA MANAGEMENT IN THE ELECTRONIC WORLD
Rebecca Charles – TBE
Lynne Perry – TBE
Doug Wahl – Exelon
Introduction
Power Plant Perspective – Doug Wahl
Laboratory Interface – Rebecca Charles
REMP Report Preparation – Lynne Perry
Power Plant Perspective
Doug Wahl
REMP Management – PB & LGS
Stations Own their Program One Individual Responsible for
Implementing Both Programs Administration and Oversight of Vendors Perform Required Surveillances Preparation of Annual Report for Station POC for NRC Inspections and Issues
REMP Management
The Programs Contracted Out Normandeau Associates, Inc.
Sample Collection Land Use Census
Teledyne Brown Engineering Radiological Analyses Interlaboratory Comparison Program
Program Implementation Goals
0% Errors Standardization Cost Effective
Common Goals
Eliminate Transcription Errors Eliminate Calculation Errors Standardize Paperwork Electronic Transfer of Data
THE JURASSIC PERIOD
Chain of Custody
THE 20TH CENTURY
Normandeau’s Data Sheet
EXELON Corporation Formed Merger of PECO and
CECO Included the Three AmerGen Plants
TMI, Oyster Creek and Clinton Standardization of Programs and Processes Common Procedure Development
LGS, OC, PB & TMI REMPs Share Expertise Between Sites Standardization
Similar Sampling Equipment Common Vendors
Sample Collection Analytical Services
Issued New REMP Contracts to Vendors
Laboratory Interface
Rebecca Charles
THE 21ST CENTURY
Electronic Transfer of Data New contract required electronic data
deliverable Exelon defined fields and format Some data was not part of current login Decision made to transfer all of field data
electronically to Teledyne
Developing the Forms Process took cooperation
Began with Exelon/Normadeau sample collection sheet
Some modifications required Rules and training for samplers
Data can be updated Layout cannot be changed Must use valid values
New Chain of Custody
ELECTRONIC RECEIPT OF DATA
THE PROCESS
Delivery
Sample Collection/Receipt Sheets
Forms completed by samplers – Excel files Emailed to Teledyne email –
knoxlab@tbe.com or Posted on password protected ftp site. Hardcopy sent with samples
Print area only Serves as chain-of-custody
Loading data to Laboratory Information Management System (LIMS)
Data is parsed Data can be viewed
before loading Checker program
verifies data Corrections can be
made Loaded to data base
Laboratory Login (Request for Analysis)
Acknowledgement
Report of Analysis
Advantages of Electronic Transfer of Data
No hand entry at login No transfer errors Review time reduced at Teledyne
laboratory Time reduced for Exelon review of
acknowledgement Field data included in Electronic Data
Deliverable
REMP Report Preparation
Lynne Perry
PAST REMP REPORTS Individual files faxed, mailed or emailed
for review Complete report put together manually Sent over night for review
THE FIX
Adobe Acrobat Combined Word, Excel, bitmap
images and Power Point files
REMP REPORTS FOR THE 21ST CENTURY
Complete report for 1st draft Standardized REMP report for Exelon-East
THE REMP REPORT Lims query to populate tables Automatic calculation Elimination of data entry errors
BENEFITS AND SAVINGS Normandeau
Elimination of calculation errors Elimination of data entry errors Reduction of paperwork Ease of record retention
50% MAN-HOURS SAVED PER PLANT
EXELON Complete Report Data Package
Lab Report, COC, TBE Acknowledgement Sheet, Data Calculation Sheets
Immediate Notification Of Missed Limits Immediate Receipt Of Reports Or Analysis Standardized REMP Reports Standardized Data Base
108 MAN-HOURS SAVED PER PLANT
TELEDYNE BROWN ENGINEERING 75% time reduction at login Elimination of login error 95% time reduction of login review Immediate delivery of ROAs 95% reduction of data entry errors in REMP tables 50% time reduction reviewing REMP tables Complete REMP draft available in february
145 MAN-HOURS SAVED PER PLANT
Recommended